Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

CEM 301 CE 322 EXAM 2 QUESTIONS AND ANSWERS

Rating
-
Sold
-
Pages
14
Grade
A+
Uploaded on
13-06-2025
Written in
2024/2025

CEM 301 / CE 322 EXAM 2 QUESTIONS AND ANSWERS risks take many forms including (select all that apply): a) schedule b) safety c) costs d) specifications e) weather - CORRECT ANSWERa) schedule b) safety c) costs e) weather

Show more Read less
Institution
CEM 301 / CE 322
Course
CEM 301 / CE 322

Content preview

CEM 301 / CE 322 EXAM 2 QUESTIONS AND ANSWERS
risks take many forms including (select all that apply):

a) schedule

b) safety

c) costs

d) specifications

e) weather - CORRECT ANSWER✅✅✅a) schedule

b) safety

c) costs

e) weather



% complete equation - CORRECT ANSWER✅✅✅units complete / total units



time ratio equation - CORRECT ANSWER✅✅✅time elapsed / total duration



cost (man hour) - CORRECT ANSWER✅✅✅cost to date / total budget



name the 6 project controls - CORRECT ANSWER✅✅✅1. units completed

2. cost (man hour) or time ratio

3. start - finish method

4. supervisor's opinion

5. incremental milestone

6. weighted / equivalent units



t/f when a project is updated, the critical path may change in route or length - CORRECT
ANSWER✅✅✅true



t/f an engineering design firm does not need to know how to control a project (the develop of a building
or highway) - CORRECT ANSWER✅✅✅false

, project controls include of these except:

a) incremental milestones

b) superintendent opinion

c) owner's opinion

d) time or cost ratio - CORRECT ANSWER✅✅✅c) owner's opinion



supervisor's opinion of percent complete is a _____ measure - CORRECT ANSWER✅✅✅subjective



an example of units completed measures is:

a) inches over foot

b) roof over foundation

c) CYDs excavated over total CYDs planned

d) feet over mile - CORRECT ANSWER✅✅✅c) CYDs excavated over total CYDs planned



define project planning and scheduling. differentiate between the two terms. - CORRECT
ANSWER✅✅✅project planning - process of developing a course of action to achieve the required
objectives to complete a project (i.e. what action is needed to carry out the goal of the project?)



scheduling - part of project planning for determining the time and sequence of operations for the given
project (i.e. how to carry out the project)



define project. what makes planning and scheduling construction projects different from general
planning? - CORRECT ANSWER✅✅✅def: a temporary endeavor undertaken to create a unique
product, service, or result



all projects will have a starting and ending point and a desirable product or service that is unique, that
makes planning and scheduling of a construction project different form general planning



what is project control? why is it important? - CORRECT ANSWER✅✅✅this is done as the project is
running to keep the project in lines with the plan and schedule. once the project has started, this is

Written for

Institution
CEM 301 / CE 322
Course
CEM 301 / CE 322

Document information

Uploaded on
June 13, 2025
Number of pages
14
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$12.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STANGRADES Stanford University
View profile
Follow You need to be logged in order to follow users or courses
Sold
90
Member since
1 year
Number of followers
1
Documents
12011
Last sold
1 day ago
STAN-GRADES

EXCELLENCY IN ACADEMIC MATERIALS

3.4

14 reviews

5
6
4
1
3
3
2
1
1
3

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions