Erosion and Sediment Control
Comprehensive Questions
(Frequently Tested) with
Verified Answers
Minimum Standard 1 - Answer: Stabilization



permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final
grade is reached on any portion of the site; temporary soil stabilization shall be applied within seven
days to denuded areas that may not be at final grade but will remain dormant for longer than 14 days;
permanent stabilization shall be applied to areas that are to be left dormant for more than one year



Site NOT at Final Grade - Answer: - stabilize in 14 days

- temporarily seed

- mulch

- permanently stabilize if dormant > 1 year



Site at Final Grade - Answer: - stabilize in 7 days (recommended immediately)

- permanently or temporarily seed and mulch

- mulch/matting/straw



Minimum Standard 2 - Answer: Stock Piles, Waste and Borrow Areas



during construction, soil stock piles and borrow areas shall be stabilized or protected with sediment
trapping measures



mulch prevents erosion by protecting the surface from raindrop impact and silt fence intercepts and
detains from disturbed areas



Minimum Standard 3 - Answer: Permanent Vegetation

,permanent vegetation cover shall be established on denuded areas not otherwise permanently
stabilized (permanent vegetation shall not be considered established until a ground cover is achieved
that is uniform, mature enough to survive, and will inhibit erosion *there is no % associated with this*)



reduce erosion and decrease sediment yield from disturbed area



this is the standard used to verify that a site is ready for release of bonds or surety



Minimum Standard 4 - Answer: First-Step Measures



Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap
sediment shall be constructed as a first step in any land-disturbing activity and shall be made functional
before upslope land disturbance takes place



a certain amount of initial land disturbance may be required to provide access for equipment to install
the perimeter controls, but site clearing and grading should be kept to a minimum until the perimeter
controls are in place



intercepts and detains small amounts of sediment from disturbed areas during construction operation
to prevent sediment from leaving the site and decrease velocity of sheet flows and low-to-moderate
level channel flow



Perimeter Controls - Answer: assures that sediment does not leave the perimeter of the land-disturbing
area once site clearing, grading, and construction commences



Examples: silt fences, sediment traps, sediment basins, construction entrance, temporary diversions,
diversions



Minimum Standard 5 - Answer: Earthen Structure Stabilization



stabilization measures shall be applied to earthen structures such as dams, dikes, and diversions
immediately after installation

, reduce erosion and sedimentation and reduce damage from sediment and runoff to downstream or off-
site areas



Minimum Standard 6 - Answer: Traps and Basins



sediment traps and basins shall be designed and constructed based upon the total drainage area (not
just disturbed area) to be served by the trap or basin



Sediment Traps - Answer: minimum storage capacity shall be 134 cubic yards per acre of drainage area
and shall only control drainage areas less than 3 acres



*stone outlet = trap*



Sediment Basins - Answer: surface runoff from disturbed areas that is comprised of flow from drainage
areas greater than or equal to 3 acres shall be controlled by a basin; minimum storage capacity of a
sediment basin shall be 134 cubic yards per acre of drainage area; the outfall system shall, at a
minimum, maintain the structural integrity of the basin during a 25-year storm of 24-hour duration;
runoff coefficients used in runoff calculations shall correspond to a bare earth condition or those
conditions expected to exist while the sediment basin is utilized.



Sediment Trapping Devises - Answer: 1. place near the lowest drainage points of a project



2. install as a first-step measure [MS-4]



3. stabilize immediately [MS-5]



4. must include outlet protection for basins [MS-11]



Minimum Standard 7 - Answer: Cut and Fill Slopes

Document information

Uploaded on
June 10, 2025
Number of pages
22
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
YourExamplug
4.2
(70)
Sold
212
Followers
27
Items
17586
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions