SWM
/
Inspector
/
Exam Questions With Correct Answers
/ / / / /
Which
/two
/plans
/in
/the
/SWPPP
/must
/be
/approved? /-
/correct
/answer(s) /✔✔ /Erosion /and /Sediment /control /plans /and /stormwater /management /plans.
Does
/the
/stormwater
/management
/plan
/address
/runoff
/during
/construction
/or /after? /- /correct /answer(s) /✔✔ /The /stormwater /management /plan /addresses /post-
construction /stormwater /runoff.
What
/impact
, /does
/impervious
/cover
/have
/on
/water
/quality? /-
/correct
/answer(s)
/✔✔
/The
/volume
/and
/velocity
/of
/stormwater
/runoff
/increases
/as
/natural
/vegetation
/is
/replaced
/with
/roads,
/buildings,
/parking
/areas
/and
/other
/impervious
/surfaces.
/The
/increase
/in
/stormwater
/runoff
/leads