Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 14 pages
Exam (elaborations)

SWM DEQ Exam 2025 EXAM QUESTIONS AND VERIFIED ANSWERS (100% CORRECT ANSWERS) A+ GRADED | ALREADY PASSED!!

Document preview thumbnail
Preview 2 out of 14 pages

SWM DEQ Exam 2025 EXAM QUESTIONS AND VERIFIED ANSWERS (100% CORRECT ANSWERS) A+ GRADED | ALREADY PASSED!!

Content preview

SWM DEQ Exam 2025 EXAM QUESTIONS AND
VERIFIED ANSWERS (100% CORRECT
ANSWERS) A+ GRADED | ALREADY PASSED!!



The Virginia Stormwater Management Program is authorized by the ______ and

administered through the ______ - ANSWER✔✔-Virginia Stormwater Management Act,

Virginia Stormwater Management Program Regulation


VPDES Permit/Construction GP authorizes discharge of stormwater from construction

activities that are - ANSWER✔✔-greater than or equal to an acre


The Stormwater Management Act requires the State Water Control Board to -

ANSWER✔✔-permit, regulate, and control stormwater runoff


DEQ has ___ days to complete review of real or potential inter-jurisdictional impacts

upon request - ANSWER✔✔-90


The Stormwater Management Act requires the following individuals to obtain and

maintain a certificate of competency - ANSWER✔✔-staff of a stormwater program,

anyone contracted by a VSMP authority, standard and specification holders




OLIVIA GREENWAYS© 2025, ALL RIGHTS RESRVED 1

, The dual certificate will expire three years from - ANSWER✔✔-the latest date of the

certificates


SWM plan must be approved by ___ before land disturbance - ANSWER✔✔-VSMP

program authority


The water quality criteria sets a site-based load limit of ____ of total phosphorus for

new development - ANSWER✔✔-0.41 lbs/acre/year


The phosphorus load limit uses the - ANSWER✔✔-10% impervious cover


Part II B and II C water quantity criteria addresses - ANSWER✔✔-channel protection

and flood protection


Which two plans in the SWPPP must be approved? - ANSWER✔✔-SWM plan, ESC

plan


Does the SWM plan address runoff during or after construction? - ANSWER✔✔-post-

construction


What is the lower limit of the range of imperviousness that can result in stream

degradation? - ANSWER✔✔-10%


What do land disturbing activities consist of? - ANSWER✔✔-excavating, clearing,

grading




OLIVIA GREENWAYS© 2025, ALL RIGHTS RESRVED 2

Document information

Uploaded on
June 6, 2025
Number of pages
14
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
OliviaGreenways
4.0
(6)
Sold
40
Followers
2
Items
1815
Last sold
2 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions