ESAMS INDIVIDUAL MANAGING YOUR
OWN RISK (ORM)
An expression of the risk associated with a hazard that combines its severity and
probability into a single Arabic numeral which can be used to help determine hazard
abatement priorities. - Correct Answers -Risk assessment code
Navy ORM is a ____ step process, applied using ____ principles, at ____ levels. -
Correct Answers -5,4,3
Which of the following is NOT a level of ORM? - Correct Answers -Intentional
___________ are actions taken or measures put in place to eliminate a hazard or
reduce the associated identified risk. - Correct Answers -Controls
Being able, willing, and ready to actively participate, state, and maintain your position
until convinced that other options are better is a behavioral skill called _________. -
Correct Answers -Assertiveness
Which term most closely matches the description: Actions taken or measures put in
place to eliminate a hazard or reduce the associated indentified risk. - Correct Answers
-Controls
Any real or potential condition that can cause injury, illness, or death to personnel;
damage to or loss of equipment or property; degradation of mission capability or impact
to mission accomplishment; or damage to the environment. 16) AHazard - Correct
Answers -Hazard
An individual must be willing to accept the level of risk his or her supervisor assigns. -
Correct Answers -False
Which term most closely matches the description: A structured process to identify and
assess hazards. An expression of potential harm, described in terms of hazard severity,
mishap probability and exposure to hazards. - Correct Answers -Risk assessment
Which description most closely matches the term: IN DEPTH - Correct Answers -
planning of unit missions, tasks or events
OWN RISK (ORM)
An expression of the risk associated with a hazard that combines its severity and
probability into a single Arabic numeral which can be used to help determine hazard
abatement priorities. - Correct Answers -Risk assessment code
Navy ORM is a ____ step process, applied using ____ principles, at ____ levels. -
Correct Answers -5,4,3
Which of the following is NOT a level of ORM? - Correct Answers -Intentional
___________ are actions taken or measures put in place to eliminate a hazard or
reduce the associated identified risk. - Correct Answers -Controls
Being able, willing, and ready to actively participate, state, and maintain your position
until convinced that other options are better is a behavioral skill called _________. -
Correct Answers -Assertiveness
Which term most closely matches the description: Actions taken or measures put in
place to eliminate a hazard or reduce the associated indentified risk. - Correct Answers
-Controls
Any real or potential condition that can cause injury, illness, or death to personnel;
damage to or loss of equipment or property; degradation of mission capability or impact
to mission accomplishment; or damage to the environment. 16) AHazard - Correct
Answers -Hazard
An individual must be willing to accept the level of risk his or her supervisor assigns. -
Correct Answers -False
Which term most closely matches the description: A structured process to identify and
assess hazards. An expression of potential harm, described in terms of hazard severity,
mishap probability and exposure to hazards. - Correct Answers -Risk assessment
Which description most closely matches the term: IN DEPTH - Correct Answers -
planning of unit missions, tasks or events