ACI Concrete Field-Testing Technician Questions with Completely Verified Answers A 6 by 12 in [150 mm by 300 mm] cylinder mold can be used for concrete containing aggregate with particles not exceeding _____ in size, without the need for wet sieving the concrete. - Correct Answers-2 in. [50 mm] A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. True of False? - Correct Answers-False A mallet weighing ____ must be used to tap the sides of the bowl after rodding each layer. - Correct Answers-1.25 +- 0.50 lb. (600 +- 200 g) A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of False? - Correct Answers-False A plastic container can be used for the measure in this method. True or False? - Correct Answers-False, measure must be steel or another suitable metal According to ASTM C1064, what is one reason to take the temperature of concrete? - Correct Answers-Verify conformance to a specified requirement for temperature of concrete After completing the strike-off procedure, what must be done before weighing the measure and sample? - Correct Answers-Clean off any excess concrete

Show more Read less
Institution
ACI-Concrete
Course
ACI-Concrete









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ACI-Concrete
Course
ACI-Concrete

Document information

Uploaded on
June 5, 2025
Number of pages
12
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ACI Concrete Field-Testing Technician Questions
with Completely Verified Answers

A 6 by 12 in [150 mm by 300 mm] cylinder mold can be used for concrete containing aggregate
with particles not exceeding _____ in size, without the need for wet sieving the concrete. -
Correct Answers-2 in. [50 mm]

A composite sample of concrete is required even if the only purpose for obtaining the sample is
to determine temperature. True of False? - Correct Answers-False

A mallet weighing ____ must be used to tap the sides of the bowl after rodding each layer. -
Correct Answers-1.25 +- 0.50 lb. (600 +- 200 g)

A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of False? -
Correct Answers-False

A plastic container can be used for the measure in this method. True or False? - Correct
Answers-False, measure must be steel or another suitable metal

According to ASTM C1064, what is one reason to take the temperature of concrete? -
Correct Answers-Verify conformance to a specified requirement for temperature of concrete

After completing the strike-off procedure, what must be done before weighing the measure and
sample? - Correct Answers-Clean off any excess concrete

After consolidation of the final layer, an excess of concrete ____ above the top of the measure is
considered optimum. - Correct Answers-1/8 in. [3 mm]

After molding test specimens, you should wait two hours before moving them to the location of
initial storage. True or False? - Correct Answers-False; the specimens must be moved
immediately

After rodding each layer, what should be done to the measure before adding another layer of
concrete? - Correct Answers-Tap the sides of the measure smartly 10 to 15 times with the
mallet

After the final rodding, the sides of the slump mold should should be tapped lightly with the
tamping rod. True or False? - Correct Answers-False

, After the temperature of the concrete is read, what is required? - Correct Answers-Reporting
of temperature

Air meter bowls used for this test must conform to ASTM _____ and be calibrated for volumee
according to ASTM _____. - Correct Answers-C231, C29

ASTM Method gives standardized requirements for _____, _____, _____, and _____, of test
specimens. - Correct Answers-Making, curing, protecting, transporting

At the end of the procedure, the air meter is _____. - Correct Answers-Disassembled and its
contents examined

Concrete mixtures with specified strengths of 6000 psi [40 MPa] or greater shall have an initial
curing temperature between __________. - Correct Answers-68 and 78 degrees F [20 and 26
C]

Concrete samples from a truck mixer must be obtained before any water or admixtures are
added to the mixer at the job site. True or False? - Correct Answers-False

Cylinders made for the purpose of determining when a structure may be put into service shall
be removed from the mold __________. - Correct Answers-At the time of the removal of
formwork

Cylinders that are to be field cured are stored __________ and protected __________. -
Correct Answers-In or on the structure as near to the point of deposit of the concrete
represented as possible; In as near as possible the same way as the formed work

During transportation, test specimens must be protected from damage due to _____, _____,
and _____. - Correct Answers-Jarring, freezing temperatures, moisture loss

Each layer should fill approximately _____ the volume of the mold. - Correct Answers-One-
third

Field Curing is the curing method used when test specimens are to be used for __________. -
Correct Answers-Determination of whether the structure is capable of being put into
service; Comparison with standard cured specimens test results or with results from various in-
place test methods; Adequacy of curing and protection of concrete in the Structure, or Form or
shoring removal time requirements

For a measure of 0.5 ft^3 [14 L], what is the required number of strokes of the tamping rod for
consolidation of each layer? - Correct Answers-25
$11.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
BestScoreStuvia

Get to know the seller

Seller avatar
BestScoreStuvia Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
3
Member since
1 year
Number of followers
1
Documents
1818
Last sold
4 months ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions