GR General requirements ICC soils Exam
Questions with complete solutions latest
2025/2026 A+ Graded 100% Verified
The duties of a special inspector does not include - ANS-issuing stop work notices
When reporting non-conforming items, what does the special inspector have to put in the
report? - ANS-Name and title of each individual notified
Reference to applicable detail of approved plans, job specifications or code
Resolution or corrective action taken
Depending upon the jurisdiction, the special inspector is required to send their final report to the
building official and - ANS-the design professional in responsible charge
The responsibility of ensuring that day to day work is covered by inspections - ANS-The
contractor
When the special inspector arrives on-site, they should notify the - ANS-contractor
The ____ issue final acceptance of building - ANS-building official
It is the responsibility of the __ to monitor the special inspection activities - ANS-building official
Special inspection reports contain - ANS-Location and the details of reinforcement inspection
Names of the individuals notified on-site regarding areas of work
Changes authorized by the design professional in charge
The ___ is responsible for approving the special inspection program - ANS-building official
The responsibilities of the special inspection agency are - ANS-Review approved plans and
specifications
Write daily reports
, Report non-conforming items
Who does the special inspector notify first if there is a non-conforming item - ANS-the
contractor
How often does the special inspector submit reports to the building official - ANS-as determined
by the building official
Who established the special inspection program - ANS-building department
Where are the required special inspections for a project found - ANS-the statement of special
inspections
The statement of special inspections is written by the - ANS-registered design professional
(RDP)
What are the first duties of a special inspector after arriving on the job site - ANS-Check in with
the contractor
At the end of a project, the special inspector - ANS-submits a final signed report
What risk category poses the highest risk to life safety - ANS-IV(4)
Who submits the statement of responsibility - ANS-The contractor
If the special inspector observes a non-conformance that is about to be coverd up, he or she
should notify who - ANS-the contractor
then building official and registered design professional
What items are required to be listed in a non-conformance/discrepancy report - ANS-Who was
notified of the non-conformance and how
Description and location of non-conformance
Reference to the applicable detail in the plans
What does the special inspection agreement state - ANS-the owner or registered design
professional hired an approved special inspection agency
What risk category would an elementary school most likely belong to - ANS-III (3)
Who provides the statement of responsibility - ANS-The contractor
who initiates the Pre-Construction Meeting - ANS-the contractor
Questions with complete solutions latest
2025/2026 A+ Graded 100% Verified
The duties of a special inspector does not include - ANS-issuing stop work notices
When reporting non-conforming items, what does the special inspector have to put in the
report? - ANS-Name and title of each individual notified
Reference to applicable detail of approved plans, job specifications or code
Resolution or corrective action taken
Depending upon the jurisdiction, the special inspector is required to send their final report to the
building official and - ANS-the design professional in responsible charge
The responsibility of ensuring that day to day work is covered by inspections - ANS-The
contractor
When the special inspector arrives on-site, they should notify the - ANS-contractor
The ____ issue final acceptance of building - ANS-building official
It is the responsibility of the __ to monitor the special inspection activities - ANS-building official
Special inspection reports contain - ANS-Location and the details of reinforcement inspection
Names of the individuals notified on-site regarding areas of work
Changes authorized by the design professional in charge
The ___ is responsible for approving the special inspection program - ANS-building official
The responsibilities of the special inspection agency are - ANS-Review approved plans and
specifications
Write daily reports
, Report non-conforming items
Who does the special inspector notify first if there is a non-conforming item - ANS-the
contractor
How often does the special inspector submit reports to the building official - ANS-as determined
by the building official
Who established the special inspection program - ANS-building department
Where are the required special inspections for a project found - ANS-the statement of special
inspections
The statement of special inspections is written by the - ANS-registered design professional
(RDP)
What are the first duties of a special inspector after arriving on the job site - ANS-Check in with
the contractor
At the end of a project, the special inspector - ANS-submits a final signed report
What risk category poses the highest risk to life safety - ANS-IV(4)
Who submits the statement of responsibility - ANS-The contractor
If the special inspector observes a non-conformance that is about to be coverd up, he or she
should notify who - ANS-the contractor
then building official and registered design professional
What items are required to be listed in a non-conformance/discrepancy report - ANS-Who was
notified of the non-conformance and how
Description and location of non-conformance
Reference to the applicable detail in the plans
What does the special inspection agreement state - ANS-the owner or registered design
professional hired an approved special inspection agency
What risk category would an elementary school most likely belong to - ANS-III (3)
Who provides the statement of responsibility - ANS-The contractor
who initiates the Pre-Construction Meeting - ANS-the contractor