1. What does this permit regulate? Discharges of pollutants in
storm water associated with
construction activity (storm
water discharges) to waters
of the united states from
construction site that disturb
one or more acres of land
surface, or that are part of
a common plan of develop-
ment or sale that disturbs
more than one acre of land
surface.
2. The person in charge of the utility company, munici- LUP
pality, or other public or private company or agency
that owns or operates the __________ may also serve
as the LRP.
3. Sediment basins, at a minimum, shall be designed True
according to the CASQA Construction BMP Guidance
Handbook.
4. In the RUSLE equation, "P" stands for Management operations
and support practices.
5. Management operations and support practices. Management operations
and support practices.
6. When does risk level one has to sample? When required for non-visi-
ble pollutants.
7. ATS instruments shall record which of the following? Flow, turbidity, and pH
1/8
, QSP Course (Not all questions are here)
Study online at https://quizlet.com/_hbk91r
8. Which factor(s) of RUSLE can be based on site-specific K and LS
analysis rather than maps?
9. Failure to obtain coverage under the permit for storm Clean Water Act and Califor-
water discharges to waters of the US is a violation of nia Water Code
the
10. For traditional construction projects the LRP may be The person who possesses
real properly interest in the
land upon which the con-
struction activities will occur
for the regulated site
11. What does NTU measure? a measurement of optical
properties of a liquid that
cause light rays to be scat-
tered and absorbed rather
than transmitted in straight
lines through a sample.
12. Inspection Records have to be kept until the project False
is complete or three years, whichever comes first.
13. Which factor(s) of RUSLE must be changed to re- R
calculate risk when the construction duration has
changed?
14. BMP stands for Best Management Practice
15. Do type 1 LUPs typically have a high potential to No
impact storm quality?
16. What does RUSLE stand for? Revised Universal Soil Loss
Equation
2/8
QSP Course (Not all questions are here)
QUESTIONS WITH COMPLETE SOLUTION /GET IT 100% ACCURATE!
Study online at https://quizlet.com/_hbk91r
1. What does this permit regulate? Discharges of pollutants in
storm water associated with
construction activity (storm
water discharges) to waters
of the united states from
construction site that disturb
one or more acres of land
surface, or that are part of
a common plan of develop-
ment or sale that disturbs
more than one acre of land
surface.
2. The person in charge of the utility company, munici- LUP
pality, or other public or private company or agency
that owns or operates the __________ may also serve
as the LRP.
3. Sediment basins, at a minimum, shall be designed True
according to the CASQA Construction BMP Guidance
Handbook.
4. In the RUSLE equation, "P" stands for Management operations
and support practices.
5. Management operations and support practices. Management operations
and support practices.
6. When does risk level one has to sample? When required for non-visi-
ble pollutants.
7. ATS instruments shall record which of the following? Flow, turbidity, and pH
1/8
, QSP Course (Not all questions are here)
Study online at https://quizlet.com/_hbk91r
8. Which factor(s) of RUSLE can be based on site-specific K and LS
analysis rather than maps?
9. Failure to obtain coverage under the permit for storm Clean Water Act and Califor-
water discharges to waters of the US is a violation of nia Water Code
the
10. For traditional construction projects the LRP may be The person who possesses
real properly interest in the
land upon which the con-
struction activities will occur
for the regulated site
11. What does NTU measure? a measurement of optical
properties of a liquid that
cause light rays to be scat-
tered and absorbed rather
than transmitted in straight
lines through a sample.
12. Inspection Records have to be kept until the project False
is complete or three years, whichever comes first.
13. Which factor(s) of RUSLE must be changed to re- R
calculate risk when the construction duration has
changed?
14. BMP stands for Best Management Practice
15. Do type 1 LUPs typically have a high potential to No
impact storm quality?
16. What does RUSLE stand for? Revised Universal Soil Loss
Equation