Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

AAAE ACE Ops Module 1 Exam Questions And Answers

Document preview thumbnail
Preview 2 out of 7 pages

Define NPIAS - ANS National Plan of Integrated Airport Systems Large Hub - ANS Over 1% of total US enplanements Medium Hub - ANS Between .25% and 1% Small hub - ANS Between .05% and .25% NonHub primary airport - ANS less than .05% but more than 10,000 annual enplanements GA Airport: National - ANS Serves National & Global: High level of traffic. Average 200 total aircraft including 30 jets (Many jets) GA Airport: Regional - ANS Serves Regional to National: High level of traffic. Average 90 total aircraft including 3 jets. (Some Jets) GA Airport: Local - ANS Serves Local: Moderate level of traffic. Average 33 total aircraft (No Jets/Some multi engine prop) GA Airport: Basic - ANS serving critical functions for local markets. Moderate to low traffic. 10 propeller based aircraft - no jets Master plan time period - ANS 20 years 9 objects of master plan - ANS Document Issues. Justify the proposal through technical, economic and environmental. provide graphic presentation of development. Establish a realistic schedule. Achievable financial plan. Environmental evaluations. Plan addresses local, state and federal regulations. Deliberations on future demand. Framework for continual planning. Master plan will include: - ANS Pre-Planning. Public Involvement. Environmental Considerations. Existing conditions. Aviation Forecasts. Facility requirements. Alternatives. Airport Layout plan. Facilities implementation plan. Financial Feasibility analysis. Five Deliverables of Master Plan - ANS Technical report. Summary Report. Airport Layout plan. Web page. Public Info Kit ALP - ANS Airport Layout Plan - initial and all changes must be approved by the FAA FAA Grant Assurance #29 - ANS requires that the ALP is updated at all times The ALP(drawing) must depict: - ANS Existing and future proposes boundaries to scale ALP Cover sheet includes - ANS Signature block, area map ALP Data sheets includes - ANS Wind rose, airport reference code, runway length, ALP Facilities Layout Plan - ANS a drawing that depicts existing and future. no text (A simplified ALP Drawing) ALP Terminal Area plan - ANS One or more large scale drawings of areas with terminal development ALP Airport Airspace drawing - ANS Part 77 (imaginary surfaces) drawing (Objects affecting navigable airspace) ALP Inner portion of the Approach surface drawing - ANS focuses on obstructions on the approach path ALP Land use drawing - ANS Both on and off airport - shows local zoning and land use around airport ALP Property Map - ANS (Exhibit A)Airport boundary map. Shows dates and parcels and how land was acquired ALP Departure Surface drawing - ANS Depicts the applicable departure surfaces ALP Utility plan - ANS Drawing depicts location of utilities ALP airport access plans - ANS if access is an issue this depicts transportation routes AAC - ANS Aircraft Approach Category ADG - ANS Airplane Design Group TDG - ANS Taxiway Design Group RDC - ANS Runway Design Code RDC is comprised of - ANS AAC, ADG, and viz min AAC A - ANS Less than 91 kts AAC B - ANS more than 91 kts and less than 121 kts AAC C - ANS more than 121 kts and less than 141 kts AAC D - ANS more than 144 kts and less than 166 kts AAC E - ANS More than 166 kts ADG I - ANS Tail height x20 wingspan x49 ADG II - ANS Tail height 20 30 wingspan 49 79 ADG III - ANS Tail height 30 45 wingspan 79 118 ADG IV - ANS Tail height 45 60 wingspan 118 171 ADG V - ANS Tail height 60 66 wingspan 171 214 ADG VI - ANS Tail height 66 80 wingspan 214 262 RDC is a - ANS coding systems that applies to a specific runway and parallel taxiway to allow unrestricted operations taxiway widths - ANS vary from 25ft to 82 taxiway safety areas - ANS vary from 49ft to 262 feet taxiways that use cockpit over centerline taxing - ANS require fillets to maintain taxiway edge safety margin (TESM) aprons - ANS provide access to terminal facilities, loading unloading, and fuel apron design considerations - ANS type of aircraft using airport on reg basis, cargo access and handling, utility needs, refueling needs, design standards, maneuvering needs, protection from jet blast, emergency response access, helicopter or V/STOL Ops

Content preview

AAAE ACE Ops Module 1 Exam
Questions And Answers




A
R
U
LA
C
O
D

, Define NPIAS - ANS National Plan of Integrated Airport Systems

Large Hub - ANS Over 1% of total US enplanements

Medium Hub - ANS Between .25% and 1%




A
Small hub - ANS Between .05% and .25%




R
NonHub primary airport - ANS less than .05% but more than 10,000 annual enplanements

GA Airport: National - ANS Serves National & Global: High level of traffic. Average 200
total aircraft including 30 jets (Many jets)



U
GA Airport: Regional - ANS Serves Regional to National: High level of traffic. Average 90
total aircraft including 3 jets. (Some Jets)
LA
GA Airport: Local - ANS Serves Local: Moderate level of traffic. Average 33 total aircraft
(No Jets/Some multi engine prop)

GA Airport: Basic - ANS serving critical functions for local markets. Moderate to low traffic.
10 propeller based aircraft - no jets
C

Master plan time period - ANS 20 years

9 objects of master plan - ANS Document Issues. Justify the proposal through technical,
O


economic and environmental. provide graphic presentation of development. Establish a realistic
schedule. Achievable financial plan. Environmental evaluations. Plan addresses local, state and
federal regulations. Deliberations on future demand. Framework for continual planning.
D



Master plan will include: - ANS Pre-Planning. Public Involvement. Environmental
Considerations. Existing conditions. Aviation Forecasts. Facility requirements. Alternatives.
Airport Layout plan. Facilities implementation plan. Financial Feasibility analysis.

Five Deliverables of Master Plan - ANS Technical report. Summary Report. Airport Layout
plan. Web page. Public Info Kit

ALP - ANS Airport Layout Plan - initial and all changes must be approved by the FAA

Document information

Uploaded on
June 2, 2025
Number of pages
7
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.79

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
DocLaura
4.2
(44)
Sold
160
Followers
38
Items
6400
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions