2 A3 Power Engineering Questions
with Correct Answers


1 boiler HP equals how many kilowatts? - CORRECT ANSWER✔️✔️-9.809 kW


Boiler Definition? - CORRECT ANSWER✔️✔️-The exact part of the unit where waters changes

from liquid to vapour state


Steam Generator Definition? - CORRECT ANSWER✔️✔️-Embraces the many combinations of

heating surfaces such as waterwalls, superheaters, reheaters, economizers and air heaters.


Steam Generating Unit definition? - CORRECT ANSWER✔️✔️-Consists of a steam generator

and all of its associated equipment including: fuel burning, ash removal and draft systems.


2 ways of attaching boiler tubes to drums/headers? - CORRECT ANSWER✔️✔️-- Welding into

place

- Expanding into place using an "expander" tool


What is Top Dryness? - CORRECT ANSWER✔️✔️-- Top dryness is the percentage of steam by

mass in the steam water mixture at the top of a riser tube where heating ceases

- Usually runs from about 5%-20%




FOR STUDY PURPOSES ONLY COPYRIGHT © 2025 ALL RIGHTS RESERVED 1

,- A film of steam is created at the top of riser tubes when top dryness becomes excessive. Adequate

cooling of tubes is not achieved


What is the Boiler Casing? - CORRECT ANSWER✔️✔️-- The airtight covering forming the outer

layer of the boiler constructed of steel plate

- Areas include: outer skin covering water walls, windbox and burner ducting, ducting enclosing the

economizer, and air heater

- Expansion joints must be joined between the boiler pressure parts and casing because of

temperature differential. (varying expansion rates)


The boiler casing is part of the boiler setting. True or False? - CORRECT ANSWER✔️✔️-True


List the sections (in order) of a Once through Boiler. - CORRECT ANSWER✔️✔️-Feed water

inlet, Economizer, Radiant Evaporator section, Final Evaporator Section, Convection Superheater

Section, Radiant Superheater Section, Steam outlet.

What controls the flow to the individual generating tubes in a controlled circulation boiler? -

CORRECT ANSWER✔️✔️-Orifices in an inlet header equally distribute feed water to

radiant/convection sections in a controlled circulation boiler.


Purpose of screen tubes? - CORRECT ANSWER✔️✔️-- Receive radiant heat from the furnace as

well as convective heat from flue gas passing through

- Act to protect the inlet tubes of the superheater from excessive radiant heat

- Also slightly reduce the temperature of the gases exiting the furnace

- Screen tubes are completely filled with water and can extend from the boiler generating bank



FOR STUDY PURPOSES ONLY COPYRIGHT © 2025 ALL RIGHTS RESERVED 2

,Boiler Division Walls? - CORRECT ANSWER✔️✔️-- Usually made of airtight all-welded

membrane construction

- Separate zones of the boiler, for example the convection and radiant zones


What is Steam Flooding? - CORRECT ANSWER✔️✔️-- A technique used in the oil and gas

industry to recover high viscosity crude oils or bitumen

- At room temperature bitumen is like molasses

- Steam flooding allows the maximum amount of heat to enter the well with the minimum amount

of injected fluid

- Target temperature is 178 degrees celsius


Oil sands and SAGD's? - CORRECT ANSWER✔️✔️-- Oil Sands: Naturally occurring mixtures of

bitumen, water, sand and clay that are found in 3 areas of Alberta: Athabasca, Peace River and Cold

Lake

- Typical oil sand samples hold around 12% bitumen by weight

- 2 Horizontal wells must exist to employ SAGD means of recovery.


Steam Flood Boilers? - CORRECT ANSWER✔️✔️-- Forced circulation steam generators with a

single pass or once through coil

- Steam quality is usually 75%-80% Steam/Water quality

- This wet steam condition keeps all salts entrained in the feed water and deposits will not collect on

evaporative tube sections

- No steam drum


FOR STUDY PURPOSES ONLY COPYRIGHT © 2025 ALL RIGHTS RESERVED 3

, - Outputs range from 5 million kj/hr to 125 million kj/hr.


Water Sterilization? - CORRECT ANSWER✔️✔️-- Complete removal of all life forms from the

water


Water Disinfection? - CORRECT ANSWER✔️✔️-- Most common method of water purification

for potable water use

- Removes all pathogenic (disease-causing) organisms in the water


Coliform Bacteria? - CORRECT ANSWER✔️✔️-- Some are harmless or beneficial but some are

very dangerous such as fecal coliform bacteria which cause intestinal illnesses in humans


Canadian Regulatory Standards for Coliform Bacteria? - CORRECT ANSWER✔️✔️-- No sample

can contain more than 10 coliform per 100 ml

- No consecutive sample from the same site can contain any coliform

- No more than 10% of samples in a minimum group of 10 samples should contain any coliform in

a calendar month


Any traces of E. coli coliform are unacceptable. True or False? - CORRECT ANSWER✔️✔️-True


Common free chlorine residual for potable water? - CORRECT ANSWER✔️✔️-0.3 mg/l residual


Chlorine Demand? - CORRECT ANSWER✔️✔️-- The point at which an reducing agents are

eliminated by a certain amount of chlorine addition

- The point where all chloro-organic compounds are eliminated

- The point where all chloramines are eliminated by oxidation



FOR STUDY PURPOSES ONLY COPYRIGHT © 2025 ALL RIGHTS RESERVED 4

Written for

Institution
Power Engineering
Course
Power Engineering

Document information

Uploaded on
June 1, 2025
Number of pages
31
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$12.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Thumbnail
Package deal
Power Engineering Bundled Exams 2025 Questions and Answers
-
38 2025
$ 46.14 More info

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EmilyCharlene Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
507
Member since
2 year
Number of followers
138
Documents
22965
Last sold
2 days ago
Charlene\'s Scholastic Emporium.

Your Actual and Virtual Exam Tests Excellent Tutor.

3.7

114 reviews

5
52
4
18
3
17
2
7
1
20

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions