1. What is the first step in site grading? Answer: Conducting a site survey. 2. What document typically outlines the scope of a grading project? Answer: Site plans or grading plans. 3. What does “cut and fill” refer to in grading? Answer: Removing soil from high areas (cut) and placing it in low areas (fill). 4. What is a benchmark in surveying? Answer: A fixed reference point used to establish elevation.

Content preview

North Carolina (NC) (H) Grading &
Excavating Practice exam

1–20: General Knowledge & Site Preparation

1. What is the first step in site grading?
Answer: Conducting a site survey.
2. What document typically outlines the scope of a grading project?
Answer: Site plans or grading plans.
3. What does “cut and fill” refer to in grading?
Answer: Removing soil from high areas (cut) and placing it in low areas (fill).
4. What is a benchmark in surveying?
Answer: A fixed reference point used to establish elevation.
5. Which soil type has the highest compaction potential?
Answer: Gravel.
6. What does a contour line on a site plan represent?
Answer: Elevation at a constant height.
7. What is the minimum slope required for surface drainage?
Answer: 2%.
8. What is the purpose of a silt fence?
Answer: To control sediment runoff.
9. Which agency regulates stormwater runoff in NC?
Answer: NC Department of Environmental Quality (DEQ).
10. What is a “cut sheet” in grading?
Answer: A document showing how much earth to remove or add at specific points.
11. How often should a site be inspected for erosion control during a rain event?
Answer: Within 24 hours after the event.
12. What is topsoil stripping?
Answer: Removing the upper fertile soil layer before grading.
13. Which type of erosion is caused by small water channels?
Answer: Rill erosion.
14. What is the purpose of a geotextile fabric?
Answer: To stabilize soil and prevent erosion.
15. Which equipment is best for bulk excavation of soft soils?
Answer: Excavator.
16. What is an easement?
Answer: A legal right to use land for a specific purpose.
17. What is finish grading?
Answer: The final shaping of the ground to prepare for landscaping or construction.
18. What factor affects the stability of a slope?
Answer: Soil type, moisture, vegetation, and angle of slope.

, 19. What does OSHA require for trenches deeper than 5 feet?
Answer: Protective systems like sloping, shoring, or shielding.
20. What is a spoil pile?
Answer: Excavated material temporarily stored on site.



21–40: Equipment & Safety

21. Which machine is most effective for fine grading?
Answer: Motor grader.
22. How often should equipment be inspected?
Answer: Daily before use.
23. What is the safe slope angle for Type C soil?
Answer: 34 degrees or 1.5:1 (horizontal:vertical).
24. What does a laser level help determine?
Answer: Elevation differences on a site.
25. Why are backup alarms required on equipment?
Answer: To warn personnel of reversing machinery.
26. What is the load line for a crane?
Answer: The maximum load that can be safely lifted.
27. What PPE is required for excavating work?
Answer: Hard hat, safety boots, high-visibility vest, gloves, eye protection.
28. What is the primary cause of trench collapses?
Answer: Improper shoring or lack of protective systems.
29. How far from the excavation should materials be stored?
Answer: At least 2 feet.
30. What is the function of a dozer?
Answer: Pushing large quantities of soil and clearing land.
31. What does “tracked” equipment offer over wheeled?
Answer: Better traction on soft or uneven ground.
32. What is the function of a compactor?
Answer: To increase soil density.
33. How deep can you excavate with a standard backhoe?
Answer: Approximately 14 to 16 feet.
34. What color marks gas lines during utility locating?
Answer: Yellow.
35. Who should be contacted before excavation begins?
Answer: NC 811 (Call Before You Dig).
36. How is equipment fueling typically done on site?
Answer: At a designated fueling area with spill protection.
37. What does “LOTO” stand for in safety procedures?
Answer: Lockout/Tagout.
38. What does “topping off” fuel tanks refer to?
Answer: Filling beyond capacity – not recommended.

Document information

Uploaded on
May 30, 2025
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brainarium
3.8
(333)
Sold
1977
Followers
1046
Items
23846
Last sold
2 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions