C720 PA WGU EXAM
COMPREHENSIVE QUESTIONS AND
VERIFIED ANSWERS |FREQUENTLY
MOST TESTED| (100% accurate
solutions)|ALREADY GRADED A+
Save
Terms in this set (70)
,A company that To develop a Pareto chart identifying
produces motors the root causes of engine defects
uses the following
check sheet:
Why would the
company use this
check sheet?
To create a
control chart to
measure the
engine assembly
process
To create a flow
chart of the
engine assembly
process
To develop a
suppliers, inputs,
process, outputs,
customers
(SIPOC) diagram
To develop a
Pareto chart
identifying the
root causes of
engine defects
,Which aspect of Durability
quality is
demonstrated by
a vehicle that has
a useful life of
165,000 miles?
Performance
Reliability
Features
Durability
, A quality Control charts
improvement Run charts
team is trying to
illustrate to upper
management how
a process is
varying over time
as measurements
are collected.
Which two
statistical process
control (SPC)
tools should the
team use?
Choose 2
answers
Cause-and-effect
diagrams
Scatter diagrams
Histograms
Run charts
Check sheets
Pareto charts
Control charts
COMPREHENSIVE QUESTIONS AND
VERIFIED ANSWERS |FREQUENTLY
MOST TESTED| (100% accurate
solutions)|ALREADY GRADED A+
Save
Terms in this set (70)
,A company that To develop a Pareto chart identifying
produces motors the root causes of engine defects
uses the following
check sheet:
Why would the
company use this
check sheet?
To create a
control chart to
measure the
engine assembly
process
To create a flow
chart of the
engine assembly
process
To develop a
suppliers, inputs,
process, outputs,
customers
(SIPOC) diagram
To develop a
Pareto chart
identifying the
root causes of
engine defects
,Which aspect of Durability
quality is
demonstrated by
a vehicle that has
a useful life of
165,000 miles?
Performance
Reliability
Features
Durability
, A quality Control charts
improvement Run charts
team is trying to
illustrate to upper
management how
a process is
varying over time
as measurements
are collected.
Which two
statistical process
control (SPC)
tools should the
team use?
Choose 2
answers
Cause-and-effect
diagrams
Scatter diagrams
Histograms
Run charts
Check sheets
Pareto charts
Control charts