3M 302 RPPO EXAM QUESTIONS
AND ANSWERS
What is RPPOs main responsibility during CASREP - Answer-To order essential
parts/technical assistance and provide updates to the work center chain of command as
needed
CASREP Category 3 - Answer-Deficiency exists in mission essential
material/equipment that causes a MAJOR degradation but not the loss of a primary
mission
CASREP - Answer-Casualty report, used to initially report equipment degradations or
loss
Define the four types of casualty reports (CASREPs): CASUP - Answer-Casualty
update, formal mechanism to provide updates to a CASREP or to correct erroneous
data to previous CASREP product
Define the four types of casualty reports (CASREPs): CASCOR - Answer-Casualty
correction, identifies to all stakeholders that corrective actions are complete and the
CASREP is closed. May/may not be tied to an operational test depending on how
CASREP was written
Define the four types of casualty reports (CASREPs): CASCAN - Answer-Casualty
cancel, reports that a CASREP is being cancelled.
Discuss the relationship between a CASREP and the following: 3-m system - Answer-
When work center sends out CASREP, 3MC must review equipment and items that are
being reported for accountability and to reflect current maintenance status and impact
toward the commence operations and work center
Discuss the relationship between a CASREP and the following: supply system -
Answer-The supply office reviews all CASREPS and ensures a specific urgency code is
attached to the requisition in order to expedite the parts procurement
Discuss how repair parts and consulate items are ordered via: relational supply (R-
supply) - Answer-Repair parts and consumable items ordered in MDS are reviewed by
the supply department and ordered through the most appropriate supply channel
, Discuss how repair parts and consulate items are ordered via: MDS - Answer-Repair
parts ordered under JSN/WORK candidate created in OMMS for specific unit of
equipment
-non-repair/non-maintenance items can also be ordered in OMMS by manually entering
the item information OMMS
Discuss how repair parts and consulate items are ordered via: open purchase - Answer-
The ordering company/department does parta research for items not carried in the
supply system and submits OPR forms to supply after approval by the departments
leadership
Explain the procedures for ordering non-NSN materials - Answer-Forms DD 1348 or
NAVSUP form 1250-2 will be used to acquire material/equipment
Explain the procedures for ordering non-cosal supported parts/materials - Answer-
RPPO may use OMMS-NG to order parts not listed in the CoSAL under a work
candidate
Discuss the importance of configuration change as it applies to repair parts - Answer-
Used the report the installation, removal, relocation, or modification of any system
equipment, component, or unit. This process updates the units COSAL and APLs. It
may result in a change to the parts carried by the unit.
Define the following and their relationship to configuration change: fleet cosal feedback
report (FCFBR) - Answer-Shops/battalion may submit CoSAL feedback reports to report
issues/discrepancies with the units COSAL and to seek correction
-FCFBR submitted via NAVY 311 webiste
Define the following and their relationship to configuration change: allowance change
request - Answer-A request to increase or decrease the requirements in COSAL
NAVSUP P-409 - Answer-Is a MILSTRIP/MILSTRAP desk guide
Depot Level Repairable (DLR) - Answer-The DLRs are repairable items for which the
codoemnation should be made at the depot level
ASI - Answer-Automated shore interface
Discuss the procedure of asi processing and up-line reporting - Answer--3mc updated
the equipment file in OMMS with changes made by CDM
-3mc requests/downloads updated files from online server then process them through
OMMS
-completed every 10 days
CDM - Answer-Configuration Data Manager
AND ANSWERS
What is RPPOs main responsibility during CASREP - Answer-To order essential
parts/technical assistance and provide updates to the work center chain of command as
needed
CASREP Category 3 - Answer-Deficiency exists in mission essential
material/equipment that causes a MAJOR degradation but not the loss of a primary
mission
CASREP - Answer-Casualty report, used to initially report equipment degradations or
loss
Define the four types of casualty reports (CASREPs): CASUP - Answer-Casualty
update, formal mechanism to provide updates to a CASREP or to correct erroneous
data to previous CASREP product
Define the four types of casualty reports (CASREPs): CASCOR - Answer-Casualty
correction, identifies to all stakeholders that corrective actions are complete and the
CASREP is closed. May/may not be tied to an operational test depending on how
CASREP was written
Define the four types of casualty reports (CASREPs): CASCAN - Answer-Casualty
cancel, reports that a CASREP is being cancelled.
Discuss the relationship between a CASREP and the following: 3-m system - Answer-
When work center sends out CASREP, 3MC must review equipment and items that are
being reported for accountability and to reflect current maintenance status and impact
toward the commence operations and work center
Discuss the relationship between a CASREP and the following: supply system -
Answer-The supply office reviews all CASREPS and ensures a specific urgency code is
attached to the requisition in order to expedite the parts procurement
Discuss how repair parts and consulate items are ordered via: relational supply (R-
supply) - Answer-Repair parts and consumable items ordered in MDS are reviewed by
the supply department and ordered through the most appropriate supply channel
, Discuss how repair parts and consulate items are ordered via: MDS - Answer-Repair
parts ordered under JSN/WORK candidate created in OMMS for specific unit of
equipment
-non-repair/non-maintenance items can also be ordered in OMMS by manually entering
the item information OMMS
Discuss how repair parts and consulate items are ordered via: open purchase - Answer-
The ordering company/department does parta research for items not carried in the
supply system and submits OPR forms to supply after approval by the departments
leadership
Explain the procedures for ordering non-NSN materials - Answer-Forms DD 1348 or
NAVSUP form 1250-2 will be used to acquire material/equipment
Explain the procedures for ordering non-cosal supported parts/materials - Answer-
RPPO may use OMMS-NG to order parts not listed in the CoSAL under a work
candidate
Discuss the importance of configuration change as it applies to repair parts - Answer-
Used the report the installation, removal, relocation, or modification of any system
equipment, component, or unit. This process updates the units COSAL and APLs. It
may result in a change to the parts carried by the unit.
Define the following and their relationship to configuration change: fleet cosal feedback
report (FCFBR) - Answer-Shops/battalion may submit CoSAL feedback reports to report
issues/discrepancies with the units COSAL and to seek correction
-FCFBR submitted via NAVY 311 webiste
Define the following and their relationship to configuration change: allowance change
request - Answer-A request to increase or decrease the requirements in COSAL
NAVSUP P-409 - Answer-Is a MILSTRIP/MILSTRAP desk guide
Depot Level Repairable (DLR) - Answer-The DLRs are repairable items for which the
codoemnation should be made at the depot level
ASI - Answer-Automated shore interface
Discuss the procedure of asi processing and up-line reporting - Answer--3mc updated
the equipment file in OMMS with changes made by CDM
-3mc requests/downloads updated files from online server then process them through
OMMS
-completed every 10 days
CDM - Answer-Configuration Data Manager