Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 6 pages
Exam (elaborations)

NGWA EXAMS SET 2025 QUESTIONS AND ANSWERS RATED A+

Document preview thumbnail
Preview 2 out of 6 pages

NGWA EXAMS SET 2025 QUESTIONS AND ANSWERS RATED A+

Content preview

NGWA EXAMS SET 2025 QUESTIONS AND ANSWERS
RATED A+
✔✔A piezometer is... - ✔✔... an instrument placed in the ground water used to measure
pressure (head).

✔✔Hollow-stem auger drill rigs have many components which make up the drill rig.
Which items are not generally part of the package? - ✔✔Down the hole hammer and
float sub.

✔✔Which of the following is not a standard industry term in the monitoring field? -
✔✔Ping rods.

✔✔Tremie pipe or line is a device, usually a small diameter pipe or hose, that performs
the following functions... - ✔✔... allows pressure grouting from the bottom of the hole
without introduction of air pockets.

✔✔The following method(s) is/are not commonly acceptable for well development. -
✔✔The Haliburton method.

✔✔When bentonite is used in drilling the borehole for constructing a monitoring well,
which method is best for removing the bentonite from the screen area? - ✔✔Using
deflocculant agents and surging.

✔✔What is the main purpose for developing monitoring wells? - ✔✔To obtain
representative water samples.

✔✔What characteristic(s) may be observed to determine proper development of a
ground water monitoring well? - ✔✔1. Turbidity.
2. Temperature.
3. pH

✔✔A poorly developed monitoring well can lead to which of the following? - ✔✔1. Low
production rate.
2. High turbidity.
3. Non-representative ground water samples.

✔✔The completion of a log is essential for... - ✔✔1. Compliance with regulatory entities.
2. The drilling contractor's reference.
3. The property Owner's records.

✔✔Which of the following information should be included in the driller's log for
monitoring well construction? - ✔✔1. Depth to water.
2. Odors from cuttings.

, 3. Loss of drilling fluid.

✔✔Which of the following items are recorded during monitor well development? - ✔✔1.
Water level before and after development.
2. Number of gallons removed during development.
3. Clarity of water before and after development.

✔✔An auger head uses... - ✔✔... tungsten faced forged steel teeth.

✔✔The hollow-stem auger cutter head should be what size in relation to the hollow-
stem augers to drill and convey cuttings effectively... - ✔✔The same size as.

✔✔Different types of knock-out plugs are used when reaming holes. Which type is not
generally used? - ✔✔Flat low carbon steel.

✔✔Which of the following is not used in mud management? - ✔✔Inflatable packer.

✔✔The most important function of the drilling fluids in rotary drilling is - ✔✔To bring
cuttings from the bottom of the hole.

✔✔In selecting a fluid for a well, the following consideration should be given. - ✔✔Fluid
should be selected on the basis of the circumstances of each individual well.

✔✔When selecting a screen for a monitoring well, which of the following is not a
consideration? - ✔✔Type of well head seal.

✔✔The purpose for making a sieve analysis of sand and gravel formations in monitoring
well construction is... - ✔✔... to select the proper screen slot opening.

✔✔When backfilling the annulus of a monitoring well after the filter pack and seal are in
place, the best material to use is... - ✔✔... cement and/or bentonite grout materials.

✔✔Which material is best for a typical 2-inch monitoring well filter pack? - ✔✔Coarse
clean silica sand.

✔✔Without regard to sampling parameters, which of the four typical types of materials
used for monitoring wells would deteriorate the quickest in a low pH environment? -
✔✔Steel.

✔✔A flush mount well cover should have... - ✔✔... concrete in the base.

✔✔If decontamination procedures are not followed, what piece(s) of drill equipment is
(are) most likely to contaminate a well? - ✔✔1. Drill rods.

Document information

Uploaded on
May 14, 2025
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Pyramids
4.0
(2)
Sold
21
Followers
4
Items
7209
Last sold
2 weeks ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions