| OnlineExams | TestPrep | StudyResources | AcademicSuccess | ExamPreparation | QuizTime | LearningTools | Education | StudentSupport
In today's fast-paced educational landscape, students need reliable resources to excel in their studies.
5.0
EYELASH EXTENSIONS QUESTIONS WITH DETAILED
VERIFIED ANSWERS (100% CORRECT ANSWERS)
/ALREADY GRADED A+
1st Stage Anagen
Ans: Active growth phase where a new hair is produced. Lasts 4 to 6 weeks
2nd Stage Catagen
Ans: Transition stage where hair shaft grows upwards and detached from
bulb. Lasts 2 to 3 weeks
3rd Stage Telogen
Ans: Resting phase in lash cycle when shedding occurs and goes back to
anagen
Sanitization
Ans: Removal of bacteria to a safety level. Does not destroy all bacteria
Disinfection
Ans: Eliminating or reducing bacteria from hard objects and surfaces
Sterilization
Ans: Decontamination process that kills spores, fungi and viruses
Sanitizing workstation
Sunday, 02 March 2025
, Ans: Throw away all non-reusable supplies. Clean station and tools used with
disinfecting wipes
Self- Sanitation
Ans: Wash hands for 30 seconds and have hand sanitizer handy
Disinfecting Lash Supplies
Ans: Reusable tools must be clean before disinfection
Disinfecting Steps
Ans: - clean reusable tools with warm water and soap
-fresh disinfectant
-get rid of reusable things after recommended time
-allow to air dry
Dry-Eye syndrome
Ans: Occurs when eye loses its ability to naturally moisten the eye.
Symptoms are burning, irritation, redness and blurred vision
Leamy Eye
Ans: Excessive tearing symptoms watering eyes, mucus, puss discharge
Conjunctivitis
Ans: pink eye, inflammation or irritation of conjecture
Examstudy - Stuvia US
In today's fast-paced educational landscape, students need reliable resources to excel in their studies.
5.0
EYELASH EXTENSIONS QUESTIONS WITH DETAILED
VERIFIED ANSWERS (100% CORRECT ANSWERS)
/ALREADY GRADED A+
1st Stage Anagen
Ans: Active growth phase where a new hair is produced. Lasts 4 to 6 weeks
2nd Stage Catagen
Ans: Transition stage where hair shaft grows upwards and detached from
bulb. Lasts 2 to 3 weeks
3rd Stage Telogen
Ans: Resting phase in lash cycle when shedding occurs and goes back to
anagen
Sanitization
Ans: Removal of bacteria to a safety level. Does not destroy all bacteria
Disinfection
Ans: Eliminating or reducing bacteria from hard objects and surfaces
Sterilization
Ans: Decontamination process that kills spores, fungi and viruses
Sanitizing workstation
Sunday, 02 March 2025
, Ans: Throw away all non-reusable supplies. Clean station and tools used with
disinfecting wipes
Self- Sanitation
Ans: Wash hands for 30 seconds and have hand sanitizer handy
Disinfecting Lash Supplies
Ans: Reusable tools must be clean before disinfection
Disinfecting Steps
Ans: - clean reusable tools with warm water and soap
-fresh disinfectant
-get rid of reusable things after recommended time
-allow to air dry
Dry-Eye syndrome
Ans: Occurs when eye loses its ability to naturally moisten the eye.
Symptoms are burning, irritation, redness and blurred vision
Leamy Eye
Ans: Excessive tearing symptoms watering eyes, mucus, puss discharge
Conjunctivitis
Ans: pink eye, inflammation or irritation of conjecture
Examstudy - Stuvia US