Standard describes the ______ , _______, and ________ required to
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
obtain a representative sample - CORRECT ANSWERS
|/\ |/\ |/\ |/\ |/\ |/\ |/\
✔✔Procedures, location, sample size |/\ |/\ |/\
Procedures will assist in obtaining every precaution that will obtain
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
samples representative of the ____ and _____ of concrete -
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
CORRECT ANSWERS ✔✔Nature and conditions
|/\ |/\ |/\ |/\
Intermittent scooping of sampke is acceptable - CORRECT
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
ANSWERS ✔✔False |/\
Concrete must be protected from sun wind and ____ and _______ -
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
CORRECT ANSWERS ✔✔Rapid evaporation and contamination
|/\ |/\ |/\ |/\ |/\
Minimum size sample for making three 100 mm diameter specimen
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
is - CORRECT ANSWERS ✔✔20L
|/\ |/\ |/\ |/\
1
|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|
, SMple must be grabbed between __ and __ % points of discharge -
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
CORRECT ANSWERS ✔✔10 90 |/\ |/\ |/\
When concrete contains aggregate larger than permitted size, what
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
should you do before - CORRECT ANSWERS ✔✔Wet sieve
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
Temperature must be obtained how many minutes after sampling - |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
CORRECT ANSWERS ✔✔5 minutes |/\ |/\ |/\
Air content and slump tests must be completed within —— minutes
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
after remixing - CORRECT ANSWERS ✔✔10
|/\ |/\ |/\ |/\ |/\
Volumetric air content method must be started within _______ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
minutes after transported and remixed - CORRECT ANSWERS ✔✔5
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
|/\ minutes
CSA 3C gives procedures for __ and __ of test cylinders - CORRECT
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
ANSWERS ✔✔Making and curing |/\ |/\ |/\
Tamping rod must be round straight steel rod with diameter _____
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
for 100 mm diameter - CORRECT ANSWERS ✔✔10
|/\ |/\ |/\ |/\ |/\ |/\ |/\
2
|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|
ANSWERS
Standard describes the ______ , _______, and ________ required to
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
obtain a representative sample - CORRECT ANSWERS
|/\ |/\ |/\ |/\ |/\ |/\ |/\
✔✔Procedures, location, sample size |/\ |/\ |/\
Procedures will assist in obtaining every precaution that will obtain
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
samples representative of the ____ and _____ of concrete -
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
CORRECT ANSWERS ✔✔Nature and conditions
|/\ |/\ |/\ |/\
Intermittent scooping of sampke is acceptable - CORRECT
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
ANSWERS ✔✔False |/\
Concrete must be protected from sun wind and ____ and _______ -
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
CORRECT ANSWERS ✔✔Rapid evaporation and contamination
|/\ |/\ |/\ |/\ |/\
Minimum size sample for making three 100 mm diameter specimen
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
is - CORRECT ANSWERS ✔✔20L
|/\ |/\ |/\ |/\
1
|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|/\|
, SMple must be grabbed between __ and __ % points of discharge -
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
CORRECT ANSWERS ✔✔10 90 |/\ |/\ |/\
When concrete contains aggregate larger than permitted size, what
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
should you do before - CORRECT ANSWERS ✔✔Wet sieve
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
Temperature must be obtained how many minutes after sampling - |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
CORRECT ANSWERS ✔✔5 minutes |/\ |/\ |/\
Air content and slump tests must be completed within —— minutes
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
after remixing - CORRECT ANSWERS ✔✔10
|/\ |/\ |/\ |/\ |/\
Volumetric air content method must be started within _______ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
minutes after transported and remixed - CORRECT ANSWERS ✔✔5
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
|/\ minutes
CSA 3C gives procedures for __ and __ of test cylinders - CORRECT
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
ANSWERS ✔✔Making and curing |/\ |/\ |/\
Tamping rod must be round straight steel rod with diameter _____
|/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\ |/\
for 100 mm diameter - CORRECT ANSWERS ✔✔10
|/\ |/\ |/\ |/\ |/\ |/\ |/\