i,- i,- i,- i,- i,-
Questions with Approved Answers | i,- i,- i,- i,- i,-
Latest 2025/2026 Update. i,- i,-
Equilibrium water vapor pressure is the force that drives
i,-i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
higher concentrations of humidity from one space to another in
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
an attempt to seek equilibrium with a lower concentrations of
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
water vapor i,-
The ability for water vapor to diffuse through a solid material is
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
expressed as the materials permeance
i,- i,- i,- i,-i,- i,-
Drying systems i,- i,-i,- i,- open closed and combo i,- i,- i,-
Plywood represents the was wood material with the least
i,-i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
engineering and that's the most natural fiber bonding it is
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
resistant to swelling and denomination due to its wood veneer
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
assemblies which are glued under extreme pressure
i,- i,- i,- i,- i,- i,-
Wet particle board would normally be
i,- i,- i,- i,- i,- i,-i,- i,- removed and replaced i,- i,-
,Plasticity plastic laminate flooring is made of MDF and has a
i,- i,- i,- i,- i,- i,- i,-i,- i,- i,- i,- i,- i,-
resin saturated appearance layer normally removed in water
i,- i,- i,- i,- i,- i,- i,- i,-
restoration due to its construction and installation components i,- i,- i,- i,- i,- i,- i,-
When ceilings are affected drying procedures are similar to wall
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
drying if the ceiling is sagging or otherwise damaged wet drywall
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
is drained removed and discarded
i,- i,- i,- i,- i,-i,- i,-
turn the drying process jip rocks original strength is restored in
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
fact it will normally be slightly stronger than before wetting
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-i,- i,-
specific types of secondary damage associate with contents are
i,- i,- i,- i,- i,- i,- i,- i,- i,-
typically swelling staining color transfer delamination of
i,-i,- i,- i,- i,- i,- i,- i,- i,-
surface finish material i,- i,-
in structures where the surface on the wall is covered with a non-
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
permeable surface it may be necessary to remove base molding i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
drill holes and introduce air movement
i,- i,- i,- i,- i,- i,-i,- i,-
air flow in the wall cavity increases the rate of evaporation and
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
allows the wall to drive from both inside and out
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-i,- i,-
what is the most critical course of action in restorative drying
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-i,- i,-
to respond quickly
i,- i,-
, what is the standard care for water restoration professionals
i,- i,- i,- i,- i,- i,- i,- i,- i,-
developed by the restoration industry entitled IICRC S500
i,- i,- i,- i,- i,- i,-i,- i,- i,-
to help protect technicians from the many hazards associated
i,- i,- i,- i,- i,- i,- i,- i,- i,-
with contaminated water losses restores need to have ready
i,- i,- i,- i,- i,- i,- i,- i,- i,-
access to several items these items protect for all
i,- i,- potential i,- i,- i,- i,- i,- i,- i,-i,- i,- i,-
exposures to the body i,- i,- i,-
respiratory protection regulations state that the employer must
i,- i,- i,- i,- i,- i,- i,- i,-
provide medical evaluations fit testing and training
i,-i,- i,- i,- i,- i,- i,- i,-
as a minimum medical requirement technicians performing water
i,- i,- i,- i,- i,- i,- i,- i,-
damage restoration services need medical consultation with their
i,- i,- i,- i,- i,- i,- i,- i,-i,-
primary health care physician for appropriate immunizations
i,- i,- i,- i,- i,- i,- i,-
the contract clearly states the agreement between the building
i,- i,- i,- i,- i,- i,- i,- i,- i,-
owner and the restoration contractor the form specifies who is
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
responsible for payment and the terms of payment and i,- i,- i,- i,- i,- i,- i,-i,- i,- i,- i,-
should be signed before work begins
i,- i,- i,- i,- i,-
the most common safety hazards associated with water damaged
i,- i,- i,- i,- i,- i,- i,- i,- i,-
structures results in slips and falls i,- i,- i,-i,- i,- i,- i,-