Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

FLORIDA STATE BUSINESS AND FINANCE STUDY GUIDE 2025 QUESTIONS WITH ANSWERS RATED A+

Document preview thumbnail
Preview 2 out of 10 pages

FLORIDA STATE BUSINESS AND FINANCE STUDY GUIDE 2025 QUESTIONS WITH ANSWERS RATED A+

Content preview

FLORIDA STATE BUSINESS AND FINANCE STUDY GUIDE
2025 QUESTIONS WITH ANSWERS RATED A+
✔✔2%/10 days net 30 is - ✔✔A discount of 2% if the customer pays the invoice within
10 days

✔✔Florida's right to Work Laws _____ - ✔✔Prevent employees from being forced to
join a union

✔✔Under the Florida Worker's Compensation act, a contractor may recover ______
from a subcontractor who has elected exemption from chapter 440 if the subcontractors
exemption is invalid and has caused liability to the contractor on employee - ✔✔Benefits
paid an interest due

✔✔Construction project schedule should have progress posted at least______ -
✔✔Weekly

✔✔A fine of up to ______ can be imposed on a contractor for finishing a job without
pulling a permit if it is the first offense. - ✔✔$5,000

✔✔An OSHA 300 safety lol must be retained by employers with at least _____
employees. - ✔✔11

✔✔Bitters and submitters requiring clarification of the bidding documents, shall make a
written request with shall reach the architect in at least ______ days, prior to the date
for receipt of bids. - ✔✔7

✔✔______ is a correct formula - ✔✔Assets minus liabilities equals equity

✔✔The ______ is an estimate a message that is not recommended for lump sum
contracts. - ✔✔Square footage method

✔✔The three C's of underwriting that surety industry considers before a contractor can
acquire a bond are. - ✔✔Capital character and capacity

✔✔The Florida sales tax is _____ - ✔✔Reported on form DR - 15 - CS and paid on a
monthly basis

✔✔Expanding a business usually requires a great deal of capital to purchase new
equipment, buildings or to obtain long-term financing. To qualify for expansion financing
financial institutes typically require that you have been in business at least ______ while
______ is preferred. - ✔✔2,5

, ✔✔If an employer conducts business in more than one location in Florida completion of
the multiple worksite report_____ will be required on a quarterly basis - ✔✔BLS-3020

✔✔A _____ is a special combination of two or more persons or entities, jointly seeking
a profit in Subs pissisng DICK'S venture, or for a specific job or undertaking with an
actual partnership or corporate designation. - ✔✔Joint venture

✔✔Fictitious names are valid for _____ years - ✔✔5

✔✔Which of the following are prohibited by Floridas right to work laws? - ✔✔Union shop
agreements, agency, Jerd shop agreements, maintenance of membership agreements.
(all of the above.)

✔✔OSHA records must be maintained for ______ - ✔✔5 years

✔✔If the contractor default or Nic likes to carry out the work and failed to do so within
_____ of receipt of written notice from the owner. The owner may correct such
deficiencies. - ✔✔10 days

✔✔The best way to accurately control petty cash is through a _____ - ✔✔Imprest
system

✔✔OSHA 300 belong on summary of occupational injuries and illnesses is used to
record _____ - ✔✔Accident investigations

✔✔ABC construction posit traction for 157,000. They can't do appreciate the tractor
over seven years. Using the straight line method to depreciation in the seventh year is
_____ - ✔✔$16,275

✔✔With a contractor must perform extra work for a subcontractor or material vendor
Contractor may proceed to recover the cost in the form of _____ - ✔✔Back charge

✔✔According to the contract manual under the completed contract message, a contract
is recognized as complete when it is in excess of ____ complete. - ✔✔98% or 99%

✔✔A change order is a written instrument, prepared by the architect and signed by
____ - ✔✔The owner, the contractor, and the architect

✔✔The job responsibilities of a superintendent include _______ - ✔✔Actively
participate in creation of a project schedule

Document information

Uploaded on
April 30, 2025
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EXAMCAFE
3.3
(18)
Sold
152
Followers
7
Items
26057
Last sold
3 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions