100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

BOMI THE DESIGN, OPERATION, AND MAINTENANCE OF BUILDING SYSTEMS, PART I WITH COMPLETE SOLUTIONS

Rating
-
Sold
-
Pages
6
Grade
A+
Uploaded on
28-04-2025
Written in
2024/2025

BOMI THE DESIGN, OPERATION, AND MAINTENANCE OF BUILDING SYSTEMS, PART I WITH COMPLETE SOLUTIONSBOMI THE DESIGN, OPERATION, AND MAINTENANCE OF BUILDING SYSTEMS, PART I WITH COMPLETE SOLUTIONSBOMI THE DESIGN, OPERATION, AND MAINTENANCE OF BUILDING SYSTEMS, PART I WITH COMPLETE SOLUTIONS Restoration of property to satisfactory conditions without changing the plan, form, or style of a structure - ANSWER-Rehabilitation Bringing a property into conformity with changes in style, whether interior or exterior - ANSWER-Modernization To change the plan, form, or style of a structure to correct functional or economical deficiencies - ANSWER-Remodeling

Show more Read less
Institution
BOMI THE DESIGN, OPERATION, AND MAINTENANCE OF BUI
Course
BOMI THE DESIGN, OPERATION, AND MAINTENANCE OF BUI









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
BOMI THE DESIGN, OPERATION, AND MAINTENANCE OF BUI
Course
BOMI THE DESIGN, OPERATION, AND MAINTENANCE OF BUI

Document information

Uploaded on
April 28, 2025
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

BOMI THE DESIGN, OPERATION, AND
MAINTENANCE OF BUILDING
SYSTEMS, PART I WITH COMPLETE
SOLUTIONS
Restoration of property to satisfactory conditions without changing the plan, form, or
style of a structure - ANSWER-Rehabilitation

Bringing a property into conformity with changes in style, whether interior or exterior -
ANSWER-Modernization

To change the plan, form, or style of a structure to correct functional or economical
deficiencies - ANSWER-Remodeling

Temporary changes to the plan, form, or style of a structure - ANSWER-Alterations

Architectural firm is hired and serves as the owners agent. Their primary responsibility is
providing and managing the design and construction documents for the project;
traditional method. - ANSWER-Design-Bid-Build

Uses separate contracts for the design and construction phase of the project. May be
architect-led, contractor-led, integrated-led, or proprietary; unlike traditional methods. -
ANSWER-Design-Build

When the owner contracts separately with a designer and a contractor, and is often
chosen in straight forward projects where the owners wants strong control, but operates
with minimal staff; similar to design-bid-build. - ANSWER-Construction Management-at-
Risk (CMAR)

When an owner divides a project into two or more parts and then enters into a separate
contract for each part. Often used for large, complex construction projects that require
phases and multiple bid packages. - ANSWER-Multiple Prime Contracts

Provides information during a bid that adds, deletes, or clarifies information in contract
documents - ANSWER-Addenda

Usually between an owner and contractor, design professional, or construction
manager. Contractor is reimbursed for their direct and indirect costs and is paid a fee for
their service. - ANSWER-Cost-plus Contract

, The construction manager guarantees, in addition to providing administrative
construction management services, a ceiling price to the owner for the cost of
construction. - ANSWER-Guaranteed Maximum Price-Construction Management
(GMP-CM)

This vinyl wall covering is used in light traffic areas and is thick and economical -
ANSWER-Type I

This vinyl wall covering is used is medium traffic areas and is more durable - ANSWER-
Type II

Air flows radially, along the radius through the impeller - ANSWER-Centrifugal fans

Air flows actually, in a straight line through the impeller - ANSWER-Axial flow fans

These fans use less horsepower and are more efficient and quieter than forward-curved
fans, making them logical for larger applications - ANSWER-Backward inclined and
airfoil

In smaller sizes, the high speed backward-inclined and airfoil fans may increase and
noise level. For the same volume of air, the lower speeds of _______________ is more
desirable for smaller applications. - ANSWER-Forward curve fans

Between the owner and contractor wherein the owner agrees to pay the contractor a
specified sum of money for completing a project consisting of a variety of specified
items of work. Results in low construction costs with minimal change orders. -
ANSWER-Lump Sum Contract

Set contract amount for all labour, materials, equipment, and services and contractors
overhead and profit for all work being performed for a specific project. Includes fixed
prices for services, materials, labour, and local costs reimbursable. - ANSWER-Unit
Price Contract

What are the biggest causes of project failure? - ANSWER-Poor estimating and
scheduling

What is the most common used project schedule? - ANSWER-Critical Path Method
(CPM) Scheduling

Owner/agent orders a change in the project - ANSWER-Actual change

This type of compressor uses positive rotary displacement - ANSWER-Helical screw
compressor

Commonly used in household refrigerators - ANSWER-Natural-draft Air-cooled
condensers

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NursingTutor1 West Virginia University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1623
Member since
2 year
Number of followers
1073
Documents
18045
Last sold
8 hours ago
Nursing Tutor

Paper Due? Worry not. Hello. Welcome to NursingTutor. Here you\'ll find verified study materials for your assignments, exams and general school work. All papers here are graded A to help you get the best grade. Also, I am a friendly person so, do not hesitate to send a message in case you have a query. I wish you Luck.

3.9

445 reviews

5
211
4
76
3
88
2
21
1
49

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions