RCDD 12th Edition Chapter 20 Exam 2025 Questions and Answers 100% Pass Mills, factories nuclear power plants, government properties = - Require additional training and certification by a local saftey representative Careful attention on the operation of areal butket trucks = - Especially in winter Underground facilities are cables which are placed in = - Subsurfaces conduits using maintenance holes MH's, hand holes HH's, and pull boxes The advantages of underground conduit are that they = - - Preserve the aesthetic appearance of the premises - Are adaptable for future facility placement or removal - Are economical over a long life - Provide the security of additional physical cable protection - Minimize the need for possible subsequent repairs to the Reader Easements from individual property owners are = - Required before any excavation on private property begins Four levels of service diversity = - - Count, among different binder groups - Sheath or cable, among different sheaths or cables - Route, along entirely different cable paths to a building 2COPYRIGHT © 2025 BY EMILLY CHARLOTTE, ALL RIGHTS RESERVED - Backbone, among different intrabuilding backbone cables The ITS designer should consider installing dual services entrances, two 100 percent diverse routes as emergency for back up for buildings that provide continuous services including = - - Hospitals - Airports - Police and fire stations - Military installations - Radio and television stations - Data centers and telephone central offices If you have 588ft of OSP cable between buildings, what's the length of the cable needed ? - 588 + 49 + 49 BICSI recommends a minimum of four [4 trade size

Show more Read less
Institution
RCDD
Course
RCDD









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
RCDD
Course
RCDD

Document information

Uploaded on
April 25, 2025
Number of pages
7
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

RCDD 12th Edition Chapter 20 Exam
2025 Questions and Answers 100%
Pass


Mills, factories nuclear power plants, government properties = - ✔✔Require
additional training and certification by a local saftey representative

Careful attention on the operation of areal butket trucks = - ✔✔Especially in winter

Underground facilities are cables which are placed in = - ✔✔Subsurfaces conduits
using maintenance holes MH's, hand holes HH's, and pull boxes

The advantages of underground conduit are that they = - ✔✔- Preserve the aesthetic
appearance of the premises

- Are adaptable for future facility placement or removal

- Are economical over a long life

- Provide the security of additional physical cable protection

- Minimize the need for possible subsequent repairs to the Reader

Easements from individual property owners are = - ✔✔Required before any
excavation on private property begins

Four levels of service diversity = - ✔✔- Count, among different binder groups

- Sheath or cable, among different sheaths or cables

- Route, along entirely different cable paths to a building



COPYRIGHT © 2025 BY EMILLY CHARLOTTE, ALL RIGHTS RESERVED 1

, - Backbone, among different intrabuilding backbone cables

The ITS designer should consider installing dual services entrances, two 100 percent
diverse routes as emergency for back up for buildings that provide continuous
services including = - ✔✔- Hospitals

- Airports

- Police and fire stations

- Military installations

- Radio and television stations

- Data centers and telephone central offices

If you have 588ft of OSP cable between buildings, what's the length of the cable
needed ? - ✔✔588 + 49 + 49

BICSI recommends a minimum of four [4 trade size] conduits = - ✔✔With at least
one spare 4 trade size conduit that should be considered for each
telecommunications service entrance point, in addition with three trade size
conduits should be considered

Where optical fiber cables will be used the ITS designer should consider placing
inner-ducts inside each = - ✔✔4 trade size conduit designated for this purpose to
ensure physical cable protection

Smaller pathway in conduit = - ✔✔Inner-duct and 1 inch to 2 inch

When a building is not on the property line, the building owner should provide -
✔✔Two or more conduits from a point inside the buildings to the property line or
easement

Terminate underground conduit at the designated property line or easement with a
minimum cover of = - ✔✔24 inches

In cold climates, minimum burial depth may be greater based on the posted = -
✔✔50 year freeze period if applicable


COPYRIGHT © 2025 BY EMILLY CHARLOTTE, ALL RIGHTS RESERVED 2

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EmillyCharlotte Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
98
Member since
1 year
Number of followers
5
Documents
11964
Last sold
2 weeks ago
ALL-MAJOR.

On this page, you find all documents, package deals, and flashcards offered by seller Emilly Charlotte.

3.5

21 reviews

5
7
4
6
3
2
2
3
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions