BUILDING SYSTEM DESIGN
QUESTIONS AND COMPLETE
SOLUTIONS GRADED A+
Your Exam Plug
,Building Permit - Answer: No entity shall erect, construct, alter, repair, move, convert, or
demolish any building or structure without first obtaining a ____________ from the Building
Official
15 days - Answer: Building permit being issued within how many days/period?
1 year - Answer: If the building permit become null and void, how many days/period does it
need to expired?
120 days - Answer: If the building permit is suspended or abandoned, how many days/period
does it need to expired?
True - Answer: True or False: The owner of the building who is issued or granted a building
permit under this code shall engage the services of a duly licensed architect or civil engineer to
undertake the full time inspection and supervision of the construction work.
1096 - Answer: National Building Code of the Philippines was formerly signed by the former
president Ferdinand Marcos as a Presidential Decree of what?
Republic Act 6541 - Answer: NBCP is implemented by what Republic Act?
National Building Code of the Philippines - Answer: It is the policy of the Philippines to
safeguard life, health, property, and public welfare, that is consistent with the principles of
sound environmental management and control.
National Building Code of the Philippines - Answer: it is applied for the over-all design of a
building including its key functional areas, site location, inclusion for provisions in water,
sanitation, etc.
, National Structural Code of the Philippines - Answer: it focuses on the specific aspects of the
structural design of a building. This provides standards in properly designing a safe, sturdy, and
long-lasting structure.
Serviceability - Answer: defines how good the structure could be of use based on its purpose
such that the structure maintains its usability once it is operational
National Building Code of the Philippines - Answer: it is enforced and implemented by the
Building Official governing a specific area of jurisdiction.
Building Official - Answer: the official charged with the duties of issuing building permits.
Certificate of Completion - Answer: Upon completion of the construction, the said licensed
architect or civil engineer shall submit the logbook, duly signed and sealed, to the Building
Official. He shall also prepare and submit a _____________ of the project stating that the
construction of building conforms to the provisions of this Code as well as with the approved
plans and specifications.
Certificate of Occupancy - Answer: After submitting the Certificate of Completion to the Building
Official along with various documents supporting this document, the Building Official shall
conduct its final inspection prior to an issuance of a ________________. This
________________ (or Occupancy Permit) certifies that the finished building or structure or its
portion, after its inspection by an inspector or enforcer from the Office of the Building Official,
has been successfully completed in compliance with the standards set by the National Building
Code of the Philippines.
30 days - Answer: occupancy permit issued within how many days/period?
Type 1 - Answer: Types of Construction: Wood construction
QUESTIONS AND COMPLETE
SOLUTIONS GRADED A+
Your Exam Plug
,Building Permit - Answer: No entity shall erect, construct, alter, repair, move, convert, or
demolish any building or structure without first obtaining a ____________ from the Building
Official
15 days - Answer: Building permit being issued within how many days/period?
1 year - Answer: If the building permit become null and void, how many days/period does it
need to expired?
120 days - Answer: If the building permit is suspended or abandoned, how many days/period
does it need to expired?
True - Answer: True or False: The owner of the building who is issued or granted a building
permit under this code shall engage the services of a duly licensed architect or civil engineer to
undertake the full time inspection and supervision of the construction work.
1096 - Answer: National Building Code of the Philippines was formerly signed by the former
president Ferdinand Marcos as a Presidential Decree of what?
Republic Act 6541 - Answer: NBCP is implemented by what Republic Act?
National Building Code of the Philippines - Answer: It is the policy of the Philippines to
safeguard life, health, property, and public welfare, that is consistent with the principles of
sound environmental management and control.
National Building Code of the Philippines - Answer: it is applied for the over-all design of a
building including its key functional areas, site location, inclusion for provisions in water,
sanitation, etc.
, National Structural Code of the Philippines - Answer: it focuses on the specific aspects of the
structural design of a building. This provides standards in properly designing a safe, sturdy, and
long-lasting structure.
Serviceability - Answer: defines how good the structure could be of use based on its purpose
such that the structure maintains its usability once it is operational
National Building Code of the Philippines - Answer: it is enforced and implemented by the
Building Official governing a specific area of jurisdiction.
Building Official - Answer: the official charged with the duties of issuing building permits.
Certificate of Completion - Answer: Upon completion of the construction, the said licensed
architect or civil engineer shall submit the logbook, duly signed and sealed, to the Building
Official. He shall also prepare and submit a _____________ of the project stating that the
construction of building conforms to the provisions of this Code as well as with the approved
plans and specifications.
Certificate of Occupancy - Answer: After submitting the Certificate of Completion to the Building
Official along with various documents supporting this document, the Building Official shall
conduct its final inspection prior to an issuance of a ________________. This
________________ (or Occupancy Permit) certifies that the finished building or structure or its
portion, after its inspection by an inspector or enforcer from the Office of the Building Official,
has been successfully completed in compliance with the standards set by the National Building
Code of the Philippines.
30 days - Answer: occupancy permit issued within how many days/period?
Type 1 - Answer: Types of Construction: Wood construction