Question and answers verified to pass 2025
1. Project management often uses the term b. duration
to describe the number of time peri-
ods required to complete some portion of the Duration is used to describe
the number
work. of time periods required to
a. resource complete a portion of the work.
estimation
b. duration
c. project schedule
2. Because the activity durations will be integrat- d. the team member doing
the work
ed with the activity sequencing to become the
approved schedule, who should have primary The team member doing the
work will
input into the duration estimates? c. triangular
a. The project manager 4. You are your own
project manager
b. Stakeholders for a ren- ovation
project on your
c. The project sponsor kitchen. Your
contrac- tors have
d. The team member doing the work
given you the
3. The problem with using the estima- following duration
tion method is that the people
providing the estimate can be too
optimistic or too pes- simistic, which
results in unreliable duration
estimates.
a. probabilistic
b. deterministic
1/
13
, WGU Project Management C722, Unit 7 Module 23, 24
Question and answers verified to pass 2025
have a better idea of how long an activity should take.
b. deterministic
Deterministic estimation relies on
one-point estimating, so it is dependent on the expertise of the
person providing the estimate rather than on multiple in- puts.
a. 25 days
Using the formula (O + M + P)/3, the
2/
13