and Answers 100% Pass
The ___________ is a live fire prerequisite that must be completed prior to executing
any live fire event, including zeroing procedures or Table IV, Basic. - ✔✔Gunnery
Skills Test (GST)
Table III, Proficiency is a single vehicle course that is designed to what? -
✔✔Evaluate the crews ability to engage stationary and moving targets placed in a
tactical array from a stationary and moving vehicle; during both day and limited
visibility conditions.
Table VI falls under the ________ _____________ ________ to be qualified. -
✔✔multiple qualification criteria
Table VI is designed to evaluate the crew on engaging ______ and __________ targets
placed in a tactical array using all vehicle weapon systems while in the _________ or
_________ postures. - ✔✔moving and stationary
offensive or defensive
The first step in developing a live fire scenario for mounted platform systems is to
what? - ✔✔Identify the range or facility that supports the unit training objective.
What manual provides detailed information on the Army's family of maneuver
ranges and their capabilities? - ✔✔TC 25-8 Training Ranges
What do the acronyms BES and HFS stand for? - ✔✔Battlefield Effects Eimulator
Hostile Fire Simulator
COPYRIGHT © 2025 BY SOPHIA BENNETT, ALL RIGHTS RESERVED 1
, For offensive engagements, all targets must be __-_______ _______ to the firing crew
a minimum of __ - percent of the length of the maneuver/firing box. - ✔✔90 percent
visible
90 - percent of the length
All targets will be exposed for how long? - ✔✔50 seconds after target lock
(120 seconds for ATGM)
Crews must be able to effectively demonstrate their ability to employ their weapons
through what? - ✔✔Training and qualification to the stated level of proficiency.
MMG platforms may fire from the ________ ________ when deemed safe and
appropriate. - ✔✔defilade position
Main gun refers to the _____, _____, or _____ armament on stabilized platforms,
respectively. - ✔✔25mm, 105mm, or 120mm
ATGM-equipped platforms _______ ATGM, ____, and _____ ATGM have six basic
attributes across the 10 tasks fired per table. - ✔✔Stryker ATGM, ITAS, and Scout
ATGM
Retrograde engagements, if used, should be conducted from where? - ✔✔The
furthest point downrange in the scenario
After the on-paper scenario is approved by the commander and installation range
support, it must be proofed on the facility using what? - ✔✔The vehicle for which
the scenario is approved.
Table II is a ____ ____ _____________ that must be completed prior to any event
using live ammunition. - ✔✔live fire prerequisite
The end state for each crew after completing Table VI is a crew that is what? - ✔✔A
crew that is confident and competent to a standard that best prepares them for
combat.
COPYRIGHT © 2025 BY SOPHIA BENNETT, ALL RIGHTS RESERVED 2