Solutions New Update (A Pass)
when in equipment put on IEM ( inactive equipment management) status I? - Answers -
✔✔ Equipment is down for 7 days or more but still fully functional
5 steps of ORM (operational risk management) - Answers -✔✔ identify hazard (identify)
assess hazard (assess)
make risk decision (make risk)
implement control (implement)
supervise
what does the "Y" or "N" means in SYSCOM? - Answers -✔✔ YES or NO of parts
required.
The acronym for 3M stands for? - Answers -✔✔ Maintenance, Material, Management
If a question exists regarding a step in a maintenance requirement, the maintenance
person should? - Answers -✔✔ immediately contact the work center supervisor
equipment should be placed on IEM (inactive equipment management) status II when? -
Answers -✔✔ equipment is not going to be used for 7 days or more and is scheduled for
overhaul
what are the duties/responsibilities of a second person on an equipment tag-out
procedure?
(meaning that there are two people doing the tag-out procedure so they asking what the
second person does within the procedure) - Answers -✔✔ to verify proper tag
attachment and positioning of the switch/valve
what are danger tag used for? - Answers -✔✔ to prohibit the operation or removal of
equipment that could jeopardize safety of personnel or endanger equipment, systems,
or components
in SKED, on the quaterly board , M-1 (#R-1) signifies what? - Answers -✔✔ Monthly one
has mandatory related maintenance of R-1
(ONE MONTH maintenance AS REQUIRED)
when entering a 2k in OMMS-NG (organizational material management system - next
generation), what minimum information is required? - Answers -✔✔ all items with a red
check on them
Who is the ships 3M manager? - Answers -✔✔ Executive Officer (XO)
, which document provides a listing of the MIP'S ( maintenance index page) assigned to a
specific work center? - Answers -✔✔ LOEP
what type of periodicity does a U-1 indicates? - Answers -✔✔ an unscheduled
periodicity
a work center can take credit for PMS (planned maintenance system) check if how
many % of the check is complete? - Answers -✔✔ 100%
The division LCPO reviews and initials which line out? - Answers -✔✔ (( MIP and LOEP
)) (listing of effective pages) and (maintenance index page)
what is a SCAT code? - Answers -✔✔ a code used to identify PMS to be completed
what is EIC? - Answers -✔✔ Equipment Identification Code
if multiple people are assigned a job who takes credit for the job? - Answers -✔✔ the
WCS, or the most higher rank person in the crew
Who is responsible for the 3m program? - Answers -✔✔ CO (commanding officer)
what is the OPNAVIST 4790.8C? - Answers -✔✔ the ship's 3m manual
who is the 3m ship system manager? - Answers -✔✔ XO (executive officer)
who reviews and approves via signature weekly PMS report? - Answers -✔✔ DIVO
how do you check on ordered parts? - Answers -✔✔ OMMS-NG (organizational
material management system - next generation)
how do you verify change pages? - Answers -✔✔ by using the LOEP
what is the pink MRC (maintenance requirement card) ? - Answers -✔✔ classified
what is not an example of IEM (inactive equipment maintenance) maintenance code? -
Answers -✔✔ U1
where do you find SYSCOM number from comparing MRC to MIP? - Answers -✔✔ Both
MRC and MIP bottom right
what does IEM stand for? - Answers -✔✔ inactive equipment maintenance
what does TORS stands for? - Answers -✔✔ tag out record sheet