ASBESTOS PRACTICE EXAM 4 WITH
CORRECT ANSWERS 2025
Persistent stomach pain, persistent shortness of breath, persistent chest
pain correct answers What are common symptoms of mesothelioma?
Persistent cough or change in cough pattern correct answers Which of
the of the following is a common symptom of lung cancer?
500,000 per occurrence for bodily injusry and property damage
combined correct answers Which of the following is necessary
insurance coverage necessary for asbestos contractors?
- post warning signs
- pre-cleaned and removed removable objects
- precleaned and sealed fixed objects
- interruped and tagged electrical circuits
- precleaned surfaces
- sealed off room penetrations
- erected containment barriers
-energize negative air filtration units
- shut down the HVAC system correct answers Start up sequence is as
follows
-constant communication between workers
- at least two workers inside tunnel with supplied air respirators
-standby workers posted with rescue equipment, including self
contained breathing apparatus
--> Not required- a bell connected toa long cord which can be activated
by workers correct answers When a worker is removing asbestos from a
steam tunnel a small opening, what is requried?
He must notify the director of the NIOSH at least 3 months prior to the
planned disposing of the records correct answers What should be done
with the asbestos records if an asbestos contractor goes out of business
after 25 years and there is no one remaining in the business to store the
records?
100 or more correct answers On or after Jan 1, 1987, contractos must be
certified to handle ACM of how many square feet?
Shortness of breath or rales correct answers What is the most common
symptom of asbestosis?
, 260, 160 correct answers If removing more than lf of asbestos pipe
insulation or
sf of asbestos surfacing material the EPA regional office and or the
State must be contacted and given advance notice
Within 30 days of the beginning of work correct answers According to GISO
5208, a medical examination must be given how soon after an employee
begins asbestos work?
With as much advanced notice as possible. correct answers When must
DOSH be notified if a condemned building is about to collapse is torn down
and 150 sf of ACM is to be removed?
The should be trained in emergency procedures for termperature related
illnesses and injuries. correct answers Which of the following is necessary
when workers are to work in high temperature work areas?
when it is wet correct answers When is it the safest to handle asbestos?
- notice of the specific nature of the operations
- notice of the increased risk of cancer w cigarettes
- notices in spanish for spanish speaking workers
--- NO - Notice of the history of asbestos use correct answers What is
requried during asbestos training?
incorrectly. he must notify them within 5 days of exposure. correct answers
Workers have been standing in a contaminated area. If the lab tests took 9
days to complete and the results showed 5 fiters/cc and the contractor told
the workers as soon as he found out the results, he proceeded
30 correct answers How many years must medical and monitoring records
concerning asbestos exposure at a workplace be kept?
- areas needing recleaning after visual inspection
-HEPA vaccuming or wet mopping all horizontal and vertical surfaces
inside the work area.
- two cleanings, one aftera min of 24 hours
--- NOT = cleaning of surfaces outside the work area correct answers What
areas are included in the post abatement cleanup?
10 working days and 30 days correct answers Supervisor must hold
meetings w crews every days.
Contractor must have meetings w supervisors every days.
it shows that crew has not showered correct answers If crews have on
street clothes with dry hair outside of site this is bad becasue
CORRECT ANSWERS 2025
Persistent stomach pain, persistent shortness of breath, persistent chest
pain correct answers What are common symptoms of mesothelioma?
Persistent cough or change in cough pattern correct answers Which of
the of the following is a common symptom of lung cancer?
500,000 per occurrence for bodily injusry and property damage
combined correct answers Which of the following is necessary
insurance coverage necessary for asbestos contractors?
- post warning signs
- pre-cleaned and removed removable objects
- precleaned and sealed fixed objects
- interruped and tagged electrical circuits
- precleaned surfaces
- sealed off room penetrations
- erected containment barriers
-energize negative air filtration units
- shut down the HVAC system correct answers Start up sequence is as
follows
-constant communication between workers
- at least two workers inside tunnel with supplied air respirators
-standby workers posted with rescue equipment, including self
contained breathing apparatus
--> Not required- a bell connected toa long cord which can be activated
by workers correct answers When a worker is removing asbestos from a
steam tunnel a small opening, what is requried?
He must notify the director of the NIOSH at least 3 months prior to the
planned disposing of the records correct answers What should be done
with the asbestos records if an asbestos contractor goes out of business
after 25 years and there is no one remaining in the business to store the
records?
100 or more correct answers On or after Jan 1, 1987, contractos must be
certified to handle ACM of how many square feet?
Shortness of breath or rales correct answers What is the most common
symptom of asbestosis?
, 260, 160 correct answers If removing more than lf of asbestos pipe
insulation or
sf of asbestos surfacing material the EPA regional office and or the
State must be contacted and given advance notice
Within 30 days of the beginning of work correct answers According to GISO
5208, a medical examination must be given how soon after an employee
begins asbestos work?
With as much advanced notice as possible. correct answers When must
DOSH be notified if a condemned building is about to collapse is torn down
and 150 sf of ACM is to be removed?
The should be trained in emergency procedures for termperature related
illnesses and injuries. correct answers Which of the following is necessary
when workers are to work in high temperature work areas?
when it is wet correct answers When is it the safest to handle asbestos?
- notice of the specific nature of the operations
- notice of the increased risk of cancer w cigarettes
- notices in spanish for spanish speaking workers
--- NO - Notice of the history of asbestos use correct answers What is
requried during asbestos training?
incorrectly. he must notify them within 5 days of exposure. correct answers
Workers have been standing in a contaminated area. If the lab tests took 9
days to complete and the results showed 5 fiters/cc and the contractor told
the workers as soon as he found out the results, he proceeded
30 correct answers How many years must medical and monitoring records
concerning asbestos exposure at a workplace be kept?
- areas needing recleaning after visual inspection
-HEPA vaccuming or wet mopping all horizontal and vertical surfaces
inside the work area.
- two cleanings, one aftera min of 24 hours
--- NOT = cleaning of surfaces outside the work area correct answers What
areas are included in the post abatement cleanup?
10 working days and 30 days correct answers Supervisor must hold
meetings w crews every days.
Contractor must have meetings w supervisors every days.
it shows that crew has not showered correct answers If crews have on
street clothes with dry hair outside of site this is bad becasue