Lean Six Sigma Black Belt UPDATED Exam Questions and CORRECT Answers The primary focus of Six Sigma - CORRECT ANSWER - quality and consistency The acronym for the Lean Six Sigma cycle - CORRECT ANSWER What does the acronym DPMO represent? - CORRECT ANSWER Opportunities The number of DPMO in a Six Sigma process. - CORRECT ANSWER - DMAIC - Defects Per Million - 3.4

Show more Read less
Institution
Lean Six Sigma
Course
Lean Six Sigma










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Lean Six Sigma
Course
Lean Six Sigma

Document information

Uploaded on
April 12, 2025
Number of pages
24
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Lean Six Sigma Black Belt UPDATED
Exam Questions and CORRECT Answers
The primary focus of Six Sigma - CORRECT ANSWER - quality and consistency



The acronym for the Lean Six Sigma cycle - CORRECT ANSWER - DMAIC



What does the acronym DPMO represent? - CORRECT ANSWER - Defects Per Million
Opportunities


The number of DPMO in a Six Sigma process. - CORRECT ANSWER - 3.4


What percent of the observations, data points, or events will fall between plus and minus 1
standard deviation of the mean? - CORRECT ANSWER - 68 Precent


What percent of the observations, data points, or events will fall within plus and minus 6
standard deviations of the mean? - CORRECT ANSWER - 99.9997 Percent


A process generates a sample mean beyond the UCL. But the process mean has not shifted. What
type of error has been made? - CORRECT ANSWER - Alpha


What type of chart is used to monitor sample means, when the size of the sample is between 12
and 25 and the data are continuous? - CORRECT ANSWER - X-Bar Chart


The statistical terms that define the quality expected by customers and include on a process
control chart. - CORRECT ANSWER - Lower Specification Limit and Upper
Specification Limit


The type of process control chart in which sample means are displayed and the data are
continuous. - CORRECT ANSWER - X-Bar Chart

,The type of process control chart that displays process variation when the sample size is less than
twelve and the data are continuous - CORRECT ANSWER - R-Chart


The distribution that describes the way in which sample means vary around the population mean.
- CORRECT ANSWER - Distribution of Sample Means


The statistic that measures the variation in a distribution by taking into consideration only the
highest and lowest values in a dataset. - CORRECT ANSWER - Range



Purpose of the X-Bar chart. - CORRECT ANSWER - To ensure that the process mean has
not shifted, and that the process is in-control.


Another phrase for a process flow diagram that illustrates process steps and delays. - CORRECT
ANSWER - Value Stream Map



A term that represents the real cause of a problem. - CORRECT ANSWER - Root Cause



What does Y=f(x) represent? - CORRECT ANSWER - The relationship between process
inputs and process outputs. Y represents outputs, and x represents inputs. Outputs are therefore a
'function of' inputs.


What is USL? - CORRECT ANSWER - Upper Specification Limit. The level above which
output is considered to be unacceptable by the customer. For example, service levels at a call
center where wait time is more than ten minutes.


The meaning of COPQ. - CORRECT ANSWER - Cost of Poor Quality. The 'total' costs
incurred by the organization when quality is less than desirable.

, Pareto Chart - CORRECT ANSWER - A variation of the ordered histogram displaying the
cumulative percent that eliminating successive problem categories will contribute to solving the
overall set of problems expressed in the chart.


Value Added - CORRECT ANSWER - A concept in Lean that identifies the value added
by a step in an operational process. Value added is defined from the customer's point-of-view. As
long as the customer receives value from a process step, it is considered "Value-Added."


Can a process mean be changed by moving the LCL and UCL? - CORRECT ANSWER -
No. The process itself would have to be changed. A change in the LCL and UCL would only
change the alpha and beta errors.


A goal when using a Value Stream Map analysis. - CORRECT ANSWER - Eliminate non-
value-added steps.


When designing a new X-Bar Chart, how is the process mean positioned on the chart? -
CORRECT ANSWER - Several preliminary groups of samples are taken - usually in the
range of five groups - and the average of all of these groups is used to estimate the process mean.
So we are talking about the average of the averages, or a "Grand Mean."


The statistic that expresses the variation in the distribution of sample means. - CORRECT
ANSWER - Standard Error of the Mean


The population mean is 60, and the standard deviation is 10. What percentage of observations
will fall between 40 and 80? - CORRECT ANSWER - 95 Percent


The likelihood that a sample result will fall within plus or minus two Standard Errors of the
Mean from the mean of a distribution of sample means. - CORRECT ANSWER - 95
Percent


What is a Business Case in a Lean Six Sigma project? - CORRECT ANSWER -A
document or report describing how a Lean Six-Sigma project will solve a business problem. It
does not focus on details which are left to the Project Charter.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES Stanford University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1105
Member since
1 year
Number of followers
103
Documents
68972
Last sold
4 hours ago
MGRADES (Stanford Top Brains)

Welcome to MGRADES Exams, practices and Study materials Just think of me as the plug you will refer to your friends Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3.8

177 reviews

5
75
4
31
3
47
2
9
1
15

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions