Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

TOM 301 Chapter 8 Test Questions with Correct Answers Latest 2025

Document preview thumbnail
Preview 2 out of 10 pages

TOM 301 Chapter 8 Test Questions with Correct Answers Latest 2025 7. Lean operations is about reducing two forms of waste, wasted _______ and wasted ________. A. inventory, capacity B. capacity, flow time C. inventory, flow time D. inventory, time - Answers B. capacity, flow time 8. Which of the following is NOT an example of wasted capacity? A. Idle time B. Rework C. Setup D. Flow time - Answers D. Flow time 9. The goal of lean is to ____________ from the system. A. extract profit B. increase output C. eliminate waste D. generate value - Answers C. eliminate waste 10. Which of the following is an example of wasted flow time? A. A long waiting time at checkout B. Idle time of cashier C. Merchandise returned to the store D. Ringing up sales at the register - Answers A. A long waiting time at checkout 11. Which of the following terms is interchangeable with "lean"? A. Value adding B. Toyota Production System C. Green D. No waiting - Answers B. Toyota Production System 12. Which of the following is NOT a component of worker time on the job? A. Waste B. Value-added work C. Commuting D. Non-value-added work - Answers C. Commuting 13. Which of the following is an example of value-added work? A. Taking orders from customers B. Repairing a defective product C. Delivering pizza to customers D. Waiting for customers to order - Answers A. Taking orders from customers 14. The overall equipment effectiveness framework identifies what percentage of a resource's time is _________ and what percentage is _________. A. available time, value-added time B. equipment time, labor time C. value-added time, wasted time D. available time, wasted time - Answers C. value-added time, wasted time 15. Which of the following is the idea behind genchigenbutsu? A. Work should be designed by engineers. B. Improvement of work can only come from management. C. Work can be designed by those who are not fully familiar with the process.

Content preview

TOM 301 Chapter 8 Test Questions with Correct Answers Latest 2025

7. Lean operations is about reducing two forms of waste, wasted _______ and wasted ________.



A. inventory, capacity

B. capacity, flow time

C. inventory, flow time

D. inventory, time - Answers B. capacity, flow time

8. Which of the following is NOT an example of wasted capacity?

A. Idle time

B. Rework

C. Setup

D. Flow time - Answers D. Flow time

9. The goal of lean is to ____________ from the system.

A. extract profit

B. increase output

C. eliminate waste

D. generate value - Answers C. eliminate waste

10. Which of the following is an example of wasted flow time?

A. A long waiting time at checkout

B. Idle time of cashier

C. Merchandise returned to the store

D. Ringing up sales at the register - Answers A. A long waiting time at checkout

11. Which of the following terms is interchangeable with "lean"?

A. Value adding

B. Toyota Production System

, C. Green

D. No waiting - Answers B. Toyota Production System

12. Which of the following is NOT a component of worker time on the job?



A. Waste

B. Value-added work

C. Commuting

D. Non-value-added work - Answers C. Commuting

13. Which of the following is an example of value-added work?

A. Taking orders from customers

B. Repairing a defective product

C. Delivering pizza to customers

D. Waiting for customers to order - Answers A. Taking orders from customers

14. The overall equipment effectiveness framework identifies what percentage of a resource's time is
_________ and what percentage is _________.

A. available time, value-added time

B. equipment time, labor time

C. value-added time, wasted time

D. available time, wasted time - Answers C. value-added time, wasted time

15. Which of the following is the idea behind genchigenbutsu?

A. Work should be designed by engineers.

B. Improvement of work can only come from management.

C. Work can be designed by those who are not fully familiar with the process.

D. Workers should be the ones observing and improving a process. - Answers D. Workers should be the
ones observing and improving a process.

17. Which of the following is NOT one of the seven sources of waste?

Document information

Uploaded on
April 9, 2025
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.89

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TutorJosh
3.4
(74)
Sold
476
Followers
16
Items
32591
Last sold
1 day ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions