General Types of Construction Surveys - ANSWER Pipeline stakeout

Building stakeout

Highway stakeout

Basic Method for Construction Surveys - ANSWER Placement of horizontal and vertical
control

Topographic survey

Staking out the design

Periodic checks on the design layout while under construction

Final as-built survey of the project

Horizontal and Vertical Control points should be - ANSWER Located conveniently for
use and clearly marked

Far enough from the actual construction to avoid possible destruction of the stakes

Suitable for securing the accuracy agreed on for the construction layout

Storm sewers - ANSWER Grade of at least 0.5%

Sanitary sewers - ANSWER Steeper grade than storm sewers

Staking out a Pipeline (without GPS) - ANSWER Use of batter boards or laser beams to
guide alignment and vertical placement of the pipe

Surveyor places offset stakes along pipeline trench

Staking out a Pipeline with use of a laser device - ANSWER The beam is oriented along
the pipe's planned horizontal alignment and grade, then the trench is opened

The laser is then used like the top of the batterboard with a measuring stick to check the
elevation of the invert

Staking out a Building - ANSWER Use of batter boards must be set far enough out of the
way of the building corners

A couple of benchmarks should be set outside the construction limits but within easy
sight distance

it is Important when Staking out a Building to - ANSWER Ensure vertical alignment,
especially on multi-story buildings

,Best to check vertical alignment with two set-ups from positions that are perpendicular
to each other

Also check in direct and reversed positions to cancel out errors from the instrument not
being in good adjustment

Staking out Highways, Canals, Railroads - ANSWER Staking will begin on the centerline
and placed at full stations (100-ft intervals) until an alignment change at a point of
intersection

After the initial centerline staking, PC's and PT's are located and staked as well as any
POT's

Points must be referenced so they can be found again once construction has started

Then the right of way is staked at every change in width, all changes in alignment, and
sufficient other points

When Staking out Highways, Canals, Railroads - ANSWER several benchmarks are
typically placed on the right of way so they are not destroyed and can be referenced
again

finally the construction limits are staked

Slope stakes - ANSWER Stake marking the cut/fill at that location

Slope intercepts - ANSWER Intersection of the original ground and the side slope

Grade stakes - ANSWER Set at points that have the same ground and grade elevation

Blue tops - ANSWER Stake set at the actual grade elevation at that location, then
painted blue on top

Errors in Construction Surveys - ANSWER Inadequate number/location of control points

Errors in establishing control

Observational errors in layout

Failure to double-center in laying out angles or extending lines and failure to check
vertical members by plunging the instrument

Careless referencing of key points

Movement of stakes and marks

Public lands - ANSWER Lands that are subject to the administration, survey, and
transfer of title to private owners under the public land laws of the United States since
1785

US Bureau of Land Management is responsible for - ANSWER surveying and managing

, these surveys

Part of Dept. of Interior

Formerly managed by Dept. of Treasury

How many states constitute the public land survey states? - ANSWER 30 states

Public Land Survey System (PLSS) - ANSWER Started in 1784

Territory immediately northwest of the Ohio River was first to be surveyed

Standard unit of measure for PLSS is - ANSWER chains

1 chain (ch) = - ANSWER 4 rods

80 ch = - ANSWER 1 mile

10 square chains (ch2) = - ANSWER 1 acre

1 chain is - ANSWER 66 feet long (100 links)

1 link = - ANSWER 0.66 feet = 7.92 inches

Lengths are recorded in - ANSWER chains and links or as a decimal

The Basic Rules of Survey (1973) - ANSWER Public lands shall be divided by north and
south lines run according to true meridian (Principal Meridian)

PLSS Township Corners will be - ANSWER marked and each mile marked differently

The township will be divided into sections, containing - ANSWER 640 acres (as close as
possible)

Sections will be numbered consecutively starting at the northeast section and
proceeding - ANSWER west and east alternately



Subdivisions in Public Surveys Division into quadrangles (tracts) approximately -
ANSWER 24 mi on a side



Division of quadrangles into townships (16), - ANSWER approximately 6 mi on a side



Division of townships into sections (36) - ANSWER approximately 1 mi square



subdivision of sections - ANSWER usually by local surveyors

Document information

Uploaded on
April 2, 2025
Number of pages
17
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Zayla
3.4
(18)
Sold
121
Followers
13
Items
15797
Last sold
1 week ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions