100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

341 EXAM 2 QUESTIONS & ANSWERS (GRADED A+)

Rating
-
Sold
-
Pages
12
Grade
A+
Uploaded on
01-04-2025
Written in
2024/2025

What are the 3 types of waste? - ANSWERquantity people quality What are the 3 types of Waste I types: quantity - ANSWEROverproduction Inventory Transportation What does TIMWOOD stand for? - ANSWERTypes of Waste

Institution
341
Course
341









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
341
Course
341

Document information

Uploaded on
April 1, 2025
Number of pages
12
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • 341 exam 2

Content preview

341 EXAM 2 QUESTIONS & ANSWERS
(GRADED A+)

What are the 3 types of waste? - ANSWERquantity
people
quality

What are the 3 types of Waste I types: quantity - ANSWEROverproduction
Inventory
Transportation

What does TIMWOOD stand for? - ANSWERTypes of Waste

Transportation
Inventory
Motion
Waiting
Overproduction
Overprocessing
Defects
Which of the following would be a "common" cause of variation?
A.
Random sources
B.
An untrained worker
C.
A machine in need of repair
D.
A defective raw material - ANSWERA. Random Sources

According to the SERVQUAL model, which of the following is NOT one of the five
dimensions of service quality?
A.
Empathy
B.
Assurance
C.
Communication
D.
Reliability
E.
Responsiveness - ANSWERC. Communication

, Justin Thyme used to run one batch each of 500 As, 300 Bs and 100 Cs every
month but now he runs a batch of 5 As, 3 Bs, and 1 C every half day with the use of:

A. mixed−model
assembly.
B. push method.
C. single−digit
setups.
D. andon lights. - ANSWERA. Mixed - model assembly

What is a concept that results in material being produced only when requested and
moved to where it is needed just as it is needed?
Part 2
A.
pull system
B.
push system
C.
requisition system
D.
procrastination system - ANSWERA. Pull system

In lean systems, if a defective product is found, which of the following is generally
NOT done?

A.
The defective unit is returned to the worker responsible for creating the defect.

B.
The defective unit is passed on to the next workstation.

C.
The production line is made aware of the problem without necessarily stopping the
line.

D.
The production line is stopped. - ANSWERB.
The defective unit is passed on to the next workstation.

Which of the following is NOT a lean scheduling tactic?

A.
Freeze part of the schedule

B.
Produce in large lots to minimize setup costs

C.
Use kanbans

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
nursingismylife West Virginia University
View profile
Follow You need to be logged in order to follow users or courses
Sold
249
Member since
2 year
Number of followers
174
Documents
9127
Last sold
2 days ago

3.6

38 reviews

5
14
4
12
3
3
2
1
1
8

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions