BOEING EXAM Q&A
In the Boeing document hierarchy, procedures provide authority for which type of
document? - Answer-BPI
Escape is a Boeing term used when? - Answer-A defective part leaves the
immediate area
Which attitude resents having someone tell them what to do, or they regard rules
and procedures as unnecessary? - Answer-Anti-authority
______ obtaining objective evidence to confirm that specified requirements have
been fulfilled - Answer-Verification
"Inspection" includes the following___________. Establishing a record indicating that
verification has occurred. Acceptance - Answer-
Who establishes the general safety requirements for building airplanes in this
country? - Answer-FAA
In what portion of a picture sheet can you find the block tolerances? - Answer-Title
block
How does the inspector know what kind of inspection to perform for a particular
detail part? - Answer-Look at the plan
The QA procedure that permits inspection of only some representative examples of a
product is called? - Answer-Statistical sampling
An inspection that verifies the operation just performed is called? - Answer-In-
process inspection
Which type of rework is the following definition for? " a documented technique for
recurrent use in the repair of a non-conformance. - Answer-Standard
A shakedown inspection is done - Answer-After a dimensional inspection
Which certificate authorizes the production of reasonable duplicates of aircraft. -
Answer-Production certificate
A disclosure is a letter sent when? - Answer-A defective part has been sent to the
airline
These people with this attitude do not see themselves as making a great deal of
difference in what happens to them. When things go well, they think that's good luck.
When things go badly they attribute it to bad luck or feel that someone else is
responsible. They leave the action to others for better or worse. - Answer-
Resignation
In the Boeing document hierarchy, procedures provide authority for which type of
document? - Answer-BPI
Escape is a Boeing term used when? - Answer-A defective part leaves the
immediate area
Which attitude resents having someone tell them what to do, or they regard rules
and procedures as unnecessary? - Answer-Anti-authority
______ obtaining objective evidence to confirm that specified requirements have
been fulfilled - Answer-Verification
"Inspection" includes the following___________. Establishing a record indicating that
verification has occurred. Acceptance - Answer-
Who establishes the general safety requirements for building airplanes in this
country? - Answer-FAA
In what portion of a picture sheet can you find the block tolerances? - Answer-Title
block
How does the inspector know what kind of inspection to perform for a particular
detail part? - Answer-Look at the plan
The QA procedure that permits inspection of only some representative examples of a
product is called? - Answer-Statistical sampling
An inspection that verifies the operation just performed is called? - Answer-In-
process inspection
Which type of rework is the following definition for? " a documented technique for
recurrent use in the repair of a non-conformance. - Answer-Standard
A shakedown inspection is done - Answer-After a dimensional inspection
Which certificate authorizes the production of reasonable duplicates of aircraft. -
Answer-Production certificate
A disclosure is a letter sent when? - Answer-A defective part has been sent to the
airline
These people with this attitude do not see themselves as making a great deal of
difference in what happens to them. When things go well, they think that's good luck.
When things go badly they attribute it to bad luck or feel that someone else is
responsible. They leave the action to others for better or worse. - Answer-
Resignation