Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 38 pages
Exam (elaborations)

ICC CALIFORNIA UST SERVICE TECHNICIAN CERTIFICATION ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS (100%VERIFIED ANSWERS) |AGRADE

Document preview thumbnail
Preview 4 out of 38 pages

ICC CALIFORNIA UST SERVICE TECHNICIAN CERTIFICATION ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS (100%VERIFIED ANSWERS) |AGRADE

Content preview

ICC California UST Service TechnicianCertifi
p p p p p




cation Exam Study Guide p p p



Terms in this set (278) p p p p




Original
UDC was required at time of installation for all systems installed after?
p p p p p p p p p p p




January 1, 2000 p p




July 1, 2005, service techs shall possess or work under someone who has acurrent
p p p p p p p p p p p p p p p


certification indicating he or she has passed the? p p p p p p p


ICC UST Service Technician Exam
p p p p




ICC cert must be renewed every?
p p p p p


24 months
p




Service techs must possess or be employed by a person who has theappropriate
p p p p p p p p p p p p p p


contractor's license unless? p p




The individual has a tank testing license
p p p p p p




Service tech is defined by any individual who?
p p p p p p p


Tests UST monitoring equipment, trouble shoots UST systems, and/orinstalls
p p p p p p p p p


UST monitoring equipment.
p p p




If the manufacturer training no longer exist, the local agency may?
p p p p p p p p p p


Approve comparable alternate training . p p p p




UST includes? p


Tank and connected piping
p p p

,What is considered a UST?
p p p p


A petroleum storage tank.
p p p




What UST system meets the requirements for secondary containment?
p p p p p p p p


Doubled wall tanks p p




According to title 23; the following piping components if installed after July 1,1987
p p p p p p p p p p p p p p


must have secondary containment.
p p p


Pressured product piping p p




Considered "pipe" on tanks installed after July 1, 2003. Press
p p p p p p p p p


ured product piping and below ground vapor recovery.
p p p p p p p




Under dispenser containment (UDC) was required for all existing USTsystem
p p p p p p p p p p


s by
p


December 31, 2003 p p




System for exchanging gas vapors in a storage tank and product in a fueldelivery t
p p p p p p p p p p p p p p p


ruck
Stage 1 vapor recovery
p p p




An approved method for non-
p p p p


visual monitoring for existing UST systems.Statistical Inventory Reconciliation (SI
p p p p p p p p p


R)


ATG must be capable for detecting a release of?
p p p p p p p p


0.2 gallons per hour
p p p

,What is no longer an approved method for non-
p p p p p p p p


visual monitoring on existing USTsystems?
p p p p p


Manual inventory reconciliation.
p p




Automatic line leak detectors installed on underground piping with secondarycontai
p p p p p p p p p p


nment shall be capable of detecting a leak of ?
p p p p p p p p p


3 gallons per hour at 10 psi
p p p p p p




How often should ATG be programmed to test the tank?
p p p p p p p p p


At least monthly
p p




According to PEI RP 300, a combustible gas can be used to?
p p p p p p p p p p p


Detect vapor leaks in a vapor recovery system.
p p p p p p p




According to PEI RP 300, a written scope of work for vapor recovery installationshou
p p p p p p p p p p p p p p


ld include?
p


Construction plans p




Positive shut off overfill protection device must stop the flow of fuel when the tankis
p p p p p p p p p p p p p p p p


no more then?
p p


95% full p




According to Executive Order (EO) VR 201-
p p p p p p


A , what could cause a nozzle shutoff mechanism or malfunction?
p p p p p p p p p p p


Depended filter seal damage p p p




According to VR 201-A, breakaway reconnection must be?
p p p p p p p


Logged in GDF log p p p

, According to PEI RP 300 what is an INCORRECT method of documenting pipingloc
p p p p p p p p p p p p p


ation?
Sketching a diagram on the inside cover of vapor recovery equipmentmanual
p p p p p p p p p p p




According to PEI RP 300 as built drawing or pictures of the underground pippinga
p p p p p p p p p p p p p p


nd other components shall be
p p . p p


maintained as long as UST is in service.
p p p p p p p




According to EO VR 101-E maintenance records are required to include what?
p p p p p p p p p p p


Name and Designated UST Operator.
p p p p




The Phil-
p


Tite EVR Phase 1 system require that vapor vent pipes at any USTsystem be
p p p p p p p p p p p p p p


Used with no more than 3 p/v valves
p p p p p p p




According to EO VR 2010 after installing a new spout assembly in the Healy 900noz
p p p p p p p p p p p p p p p


zle the following test must be conducted?
p p p p p p




Nozzle dispensing shut off test
p p p p




According to Healy EO VR 201-A a vapor recovery record is to be maintainedby?
p p p p p p p p p p p p p p


Gasoline dispensing facility operator(GDF)
p p p




An enhanced leak detection test is required within how many feet of a publicdrinking
p p p p p p p p p p p p p p p


well?
1000 feet p




What are the components of the Fire Triangle?
p p p p p p p

Document information

Uploaded on
March 17, 2025
Number of pages
38
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$19.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ESTEEMEDTESTBANKS
4.8
(1248)
Sold
33
Followers
1
Items
436
Last sold
2 weeks ago


Reviews from verified buyers



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions