Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 52 pages
Exam (elaborations)

MASTER ELECTRICIAN TEST 4 || QUESTIONS WITH ANSWERS|| COMPLETE GUIDE|| 2025|| RATED A+

Document preview thumbnail
Preview 4 out of 52 pages

MASTER ELECTRICIAN TEST 4 || QUESTIONS WITH ANSWERS|| COMPLETE GUIDE|| 2025|| RATED A+ MASTER ELECTRICIAN TEST 4 || QUESTIONS WITH ANSWERS|| COMPLETE GUIDE|| 2025|| RATED A+ 1. Given an industrial building, what would be the total load with the following loads: - multi-outlet assemblies with continuous runs of 13 feet, 25 feet, and 6 feet (non-simultaneous use) - multi-outlet assemblies with continuous runs of 41 feet, 28 feet, 19 feet, and 24 feet (simultaneous use) 1. 20,160 2. 21,960 3. 22,340 4. 23,580: 2. 21,960

Content preview

1. Given an industrial building, what would be the total load with the following
loads:

- multi-outlet assemblies with continuous runs of 13 feet, 25 feet, and 6 feet
(non-simultaneous use)

- multi-outlet assemblies with continuous runs of 41 feet, 28 feet, 19 feet, and
24 feet (simultaneous use)

1. 20,160

2. 21,960

3. 22,340

4. 23,580: 2. 21,960
2. A receptacle supplying power shall be on a separate circuit serving office
furnishing panels and no other loads and shall be located not more than how
many inches from the partition that is connected to it?

1. 96 inches

2. 72 inches

3. 24 inches

4. 12 inches: 4. 12 inches
3. Which article prevents a control switch for emergency lighting in a theater
or a place of assembly being placed in a motion picture projection booth or
on a stage or platform?

,1. 410

2. 518

3. 520

14. 700: 3. 520

,4. Lighting equipment shall be listed and identified for use with office fur-
nishings and shall have a means for secure attachment. The cord and plug
connection shall be suitable for the intended application but shall not exceed
HOW MANY feet in length?

1. 10 feet

2. 9 feet

3. 8 feet

4. 6 feet: 2. 9 feet
5. Inverse time (as applied to the circuit breakers): A qualifying term indicating
that there is purposely introduced a delay in the tripping action of the circuit
breaker, which delay decreases as the magnitude of the current?

1. increases.

2. decreases

3. extends.

4. inverts.: 1. Increases
6. The NEC requires protection for personnel in dwellings and other commer-
cial establishments such as a high school locker room with a shower facility,
to have

1. ground-fault circuit interrupter protection.

2. arc-fault circuit interrupter protection.

3. outlets be installed with an isolated grounding conductor.

4. a solid earth ground system.: 1. ground-fault circuit interrupter protection.
7. Using the Tables of Chapter 9 of the NEC, what would be the required size if
the raceway is Schedule 40 PVC underground with Schedule 80 stub-ups, and
it contains only the four 4 AWG THWN conductors?

1. 1/2

, 2. 3/4

3. 1

4. 1-1/4: 4. 1-1/4
8. The receptacle outlets required in dwelling units shall be in addition to any
receptacle that is part of any luminaire or appliance, located within cabinets
or cupboards or located more than how many feet above the floor?

1. 5.0 feet.

2. 5.5 feet.

3. 6.0 feet.

4. 6.5 feet.: 2. 5.5 feet
9. The rating of a cord-and-attachment-plug-connected room air conditioner
shall not exceed HOW MANY amperes, if the unit is connected to a single
receptacle on an individual branch circuit, rated at 30 amperes?

1. 24.0 amperes

2. 30.0 amperes

3. 37.5 amperes

4. 40.0 amperes: 1. 24.0 amperes
10. What is the maximum dual element fuse that can be used (for both
short-circuit-ground-fault protection
and for overload protection) given a load of:
- 115-volt, single-phase, 2-HP motor,
- Temperature rise of the motor is 40 degrees C,

- Service factor is 1.15.

1. 30 amperes.

2. 20 amperes.

Document information

Uploaded on
March 14, 2025
Number of pages
52
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$16.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MBOFFIN
3.7
(126)
Sold
739
Followers
218
Items
5606
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions