Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

LEAD ABATEMENT SUPERVISOR EXAM SCRIPT 2025/2026 QUESTIONS AND ANSWERS GUARANTEE A+

Document preview thumbnail
Preview 2 out of 11 pages

WI DHS 163 certification requirements for supervisor - - 1 day lead safe renovator class - One day lead abatement work class and related experience - 2 yrs construction experience or 1 yr as lead worker - 2 day lead abatement supervisor class - Submit application and fee to WI DHS - Pass state exam WI DHS 163 definition of abatement - Activity designed to permanently eliminate lead based paint hazards WI DHS 163 definition of lead based paint - - 0.5% lead by weight - more than 1.0 mg/cm2

Content preview

LEAD ABATEMENT SUPERVISOR 2025/2026 QUESTIONS
AND ANSWERS GUARANTEE A+
✔✔Define "replacement". - ✔✔The removal of doors, windows, trim, and other building
items that contain lead-based paint hazards and their replacement with new lead-free
components.

✔✔What is the most desirable abatement method? - ✔✔Replacement

✔✔Define "removal". - ✔✔The separation of the paint from the substrate using heat
guns, chemicals, or certain contained abrasive measures, either on-site of off-site.

✔✔Where will you most often see removal used as an abatement technique? - ✔✔In
limited areas and for surfaces where historical preservation applies.

✔✔Define "enclosure". - ✔✔The installation of a rigid, durable barrier that is
mechanically attached to building components, with all edges and seams sealed with
caulk or other sealant.

✔✔Define "encapsulation". - ✔✔Coatings or rigid materials that rely on adhesion to a
lead based painted surface and are not mechanically fastened to the substrate.

✔✔T/F: Painting and encapsulation ARE the same. - ✔✔False

✔✔What are two ways lead-contaminated soil is abated? - ✔✔- Removing and
replacing the contaminated soil with clean soil
- Permanently covering the contaminated soil with asphalt or concrete

✔✔How deep must lead-contaminated soil be removed during abatement? - ✔✔At least
6" deep.

✔✔What are examples of interim controls for lead-contaminated soil? - ✔✔Covering
with several inches of clean soil or mulch, or planting sod or grass.

✔✔What are the nine prohibited work methods listed in DHS 163.14? - ✔✔-
Uncontained abrasive blasting or uncontained sand blasting
- Machine sanding, grinding, or planing without a properly operating HEPA-filtered
exhaust control
- Manual dry scraping, sanding, or planing of more than two square feet of paint
- Using chemical paint strippers containing methylene chloride
- Uncontained high-pressure water blasting, or uncontained hydroblasting
- Open-flame torching, charring, or burning of paint
- Operating a heat gun on paint at or above 1100 F
- Using an improperly operating HEPA vacuum when cleaning
- Dry sweeping when cleaning

, ✔✔How does 29 CFR 1926.62 define a "competent person"? - ✔✔A person capable of
identifying existing and predictable lead hazards in the surroundings or working
conditions, who has authorization to take prompt corrective measures to eliminate them,
and who makes frequent and regular inspections of jobsites, materials, and equipment
as part of a program to ensure that workers are not exposed to excessive levels of
airborne lead.

✔✔What are the steps to lead abatement? - ✔✔- Arrange for risk assessment/paint
inspection
- Develop a hazard control plan
- Obtain waste permits
- Select needed materials
- Develop specifications
- Schedule other construction work
- Select a contractor
- Conduct preconstruction conference
- Notify residents
- Correct housing conditions that may impede work
- Post warning signs
- Consider a pilot project
- Consider collecting soil samples as an option
- Execute construction work
- Store waste
- Cleanup
- Arrange for clearance
- Repeat cleaning if clearance fails
- Pay contractors
- Conduct periodic monitoring

✔✔How much poly must be used on interior abatement projects? - ✔✔Two layers of 6
mil poly in a minimum of 6 ft. of all directions of the work area.

✔✔How much poly must be used on exterior abatement projects? - ✔✔Two layers of 6
mil poly in a minimum of 10 ft. of all directions of the work area.

✔✔What is the most important piece of safety equipment for worker protection? -
✔✔Respirator

✔✔T/F: An employee should always perform a positive/negative seal check when
donning a respirator. - ✔✔True

✔✔OSHA states that if you do not have an exposure assessment, you must assume
you are _______ over the PEL. - ✔✔10x

Document information

Uploaded on
March 13, 2025
Number of pages
11
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BOARDWALK
3.5
(40)
Sold
281
Followers
10
Items
32848
Last sold
11 hours ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions