100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CONSTRUCTION FE CIVIL UPDATED EXAM WITH MOST TESTED QUESTIONS AND ANSWERS | GRADED A+ | ASSURED SUCCESS WITH DETAILED RATIONALES

Rating
-
Sold
-
Pages
31
Grade
A
Uploaded on
10-03-2025
Written in
2024/2025

CONSTRUCTION FE CIVIL UPDATED EXAM WITH MOST TESTED QUESTIONS AND ANSWERS | GRADED A+ | ASSURED SUCCESS WITH DETAILED RATIONALES

Institution
CONSTRUCTION FE CIVIL
Course
CONSTRUCTION FE CIVIL











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CONSTRUCTION FE CIVIL
Course
CONSTRUCTION FE CIVIL

Document information

Uploaded on
March 10, 2025
Number of pages
31
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ESTUDY



CONSTRUCTION FE CIVIL UPDATED EXAM WITH MOST
TESTED QUESTIONS AND ANSWERS | GRADED A+ |
ASSURED SUCCESS WITH DETAILED RATIONALES

1. **Which project delivery method is the most traditional and appeals to those looking for low-cost
bids, where the owner contracts designers and builders separately?**



- A) Design-Bid-Build

- B) Design-Build

- C) Construction Management at Risk

- D) Integrated Project Delivery



**Answer: A) Design-Bid-Build**



2. **Which construction project delivery method involves the designer and builder working together
under a single contract from the beginning to ensure unity and collaboration throughout the project?**



- A) Design-Bid-Build

- B) Design-Build

- C) Construction Management at Risk

- D) Integrated Project Delivery



**Answer: B) Design-Build**



3. **Which of the following clearly shows an advantage of the Design-Build project delivery over the
Design-Bid-Build method?**

,ESTUDY




- A) There is a single point of contractual responsibility for the owner for the entire project

- B) There are contractual relationships with the Owner that prevent a conflict of interest

- C) The design is clearly and explicitly defined at the outset of the project

- D) The design includes significant collaboration between the Engineer and the Contractor

- E) The schedule can be fast-tracked and construction can begin before the complete project design is
finalized

- F) The Owner will receive a project at the lowest competitive cost



**Answer: A) There is a single point of contractual responsibility for the owner for the entire project**



4. **What is an indemnification clause in an engineer's design contract typically tied to?**



- A) Negligent engineering design

- B) Claims submitted by parties affected by a failure

- C) Project cost overruns

- D) Improper construction methods by the Contractor



**Answer: A) Negligent engineering design**



5. **What does "collusion" on a construction project typically refer to?**



- A) A practice where multiple contractors conspire to fix prices or rig bids

- B) A system where public officials receive money from the contractor after award

- C) Falsely increasing the price of change orders

- D) Misrepresenting the amount of work completed to get advance payments

,ESTUDY




**Answer: A) A practice where multiple contractors conspire to fix prices or rig bids**



6. **When should a preconstruction conference be held?**



- A) Prior to advertising for bids

- B) After advertising for bids but before bids are received

- C) After bid opening but before the contract is awarded

- D) After execution of an agreement but before the Notice to Proceed



**Answer: D) After execution of an agreement but before Notice to Proceed**



7. **Which of the following types of submittals for engineer approval is NOT typically required?**



- A) Product data

- B) Shop drawings

- C) Installation means and methods

- D) Mill certificates



**Answer: C) Installation means and methods**



8. **What does "substantial completion" mean in a construction contract?**



- A) The project is completely finished and can be used by the owner

- B) The project can be used and occupied by the owner, but there is still minor work left

, ESTUDY


- C) The contractor's performance bond will be used to finish the remaining work

- D) The owner has received a final release of liens from all subcontractors



**Answer: B) The project can be used and occupied by the owner, but there is still a punch-list of
minor work remaining**



9. **What is a financial guarantee that the terms of a contract will be honored, and if a party cannot
fulfill their obligations, the bond compensates the other party?**



- A) Performance bond

- B) Insurance bond

- C) Payment bond

- D) Completion bond



**Answer: A) Performance bond**



10. **OSHA requires trench protection systems to be installed for the safety of workers when:**



- A) Whenever a trench is dug and workers will be working in it

- B) For trenches 5 feet deep or greater unless the trench is made entirely in stable rock

- C) When the work in the trench will exceed four hours

- D) Only if the trench is 8 feet deep or greater or 20 feet long or greater



**Answer: B) For trenches 5 feet deep or greater unless the trench is made entirely in stable rock**



11. **Who is primarily responsible for planning the means and methods of construction?**

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Estudyr Kaplan University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1154
Member since
3 year
Number of followers
828
Documents
10861
Last sold
11 hours ago
ESTUDY

Get best related and owned assignment help online, this is your youngest Proffesor around.Be Smart! , I will be sharing all materials, Nclex, study guides, tests, Question ,Answers and Rationales , test banks, Hesi questions, etc. on my page for , All are based on my experiences with Nursing school.| Feel free to message me with any questions, happy to help!

3.9

207 reviews

5
103
4
43
3
27
2
11
1
23

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions