When PJM declares a hot weather alert, the generation
dispatcher should
Give this one a try later!
determine if
notify consumers of
1 maintenance can be
potential outages
deferred
, increase generation shut down all non-
3 4
output immediately essential units
Don't know?
Terms in this set (45)
Real time off cost (out of merit)
transmission
constraints or
contingencies may
be alleviated with
generators
operating
what is the 3 MW
minimum size for a
solar park to be
required to have
real and reactive
power?
PJM calls for which synchronized reserves
of the following to
recover the ACE
so that tie line
schedules are
maintained?
Questions And Answers Latest Update
Save
Practice questions for this set
Learn 1 /7 Study with Learn
When PJM declares a hot weather alert, the generation
dispatcher should
Give this one a try later!
determine if
notify consumers of
1 maintenance can be
potential outages
deferred
, increase generation shut down all non-
3 4
output immediately essential units
Don't know?
Terms in this set (45)
Real time off cost (out of merit)
transmission
constraints or
contingencies may
be alleviated with
generators
operating
what is the 3 MW
minimum size for a
solar park to be
required to have
real and reactive
power?
PJM calls for which synchronized reserves
of the following to
recover the ACE
so that tie line
schedules are
maintained?