Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

CMIT 320 Final Exam Latest Update Actual Exam 200 Questions with 100% Verified Correct Answers Guaranteed A+ Verified by Professor

Document preview thumbnail
Preview 2 out of 8 pages

CMIT 320 Final Exam Latest Update Actual Exam 200 Questions with 100% Verified Correct Answers Guaranteed A+ Verified by Professor

Content preview

CMIT 320 Final Exam
Name: Score:



20 Multiple choice questions

Definition 1 of 20

True

What is the management technique for subdividing the project into its component elements called? A) WBS

B) BIM
C) ISO
D) CPM


A project delivery approach that is gaining acceptance for allocating risks among project teams is referred
to as the ________ method.
A) D-B

B) IPD
C) FAR
D) D-B-B


In the absence of both a limit on construction costs and a warranty for the accuracy of the cost
estimate, a project cost overrun will cause the CM to lose their fee. True False


As the numbers of prime contractors on a project increase, the need to carefully coordinate contract
documents increases.
True False
Term 2 of

The CMAA Construction Management Standards of Practice is intended as a guide to the range of services
that constitute professional construction management. They seek to meet the documented need for
definitions of what construction management services are, without unduly structuring the methodologies
by which those services are provided by the CM. C) Parametric estimate

, 20
True


B) Identify the sources of risk and assess their impact on the project


False


Definition 3 of 20

False

What is the term sometimes used to describe the standard language of the full set of contract documents?
A) Special provisions

B) MasterFormat
C) Boiler plate
D) Contract agreement


The CMAA A-4 document requires the designer to periodically visit the site to become generally
familiar with the progress and quality of the work. True False


The fact that an individual is certified or licensed in any other profession does not, per se, establish
him/her as a qualified CM. True False


The value of a cost found by discounting future cash flows to the base time is called:
A) Future cost
B) Earned value
C) Present value
D) Job cost
4
The basic contractual relationships between the CM and designer are essentially the same in the CMAA A-1
and AIA C132-2009 documents. True False


True


False


A) WBS

Document information

Uploaded on
March 4, 2025
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Only questions
$21.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
3
Followers
0
Items
72
Last sold
10 months ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions