NICET Level 2 Full Exam Practice Questions and Answers 100% Pass You are inspecting a construction site and notice that the soil appears to be a fine-grained, cohesive material with good bearing capacity. What type of soil is this likely to be? a. Clay b. Sand c. Gravel d. Loam - Answer-a. Clay /.You are inspecting the clearing and grubbing of a construction site and notice that a large tree has been removed within the limits of disturbance. What should you do? a. Notify the project manager and request that a replacement tree be planted b. Document the removal in the construction logs and move on c. Issue a stop work order until a replacement tree can be planted d. Request that the tree be replaced, but do not issue a stop work order - Answer-d. Request that the tree be replaced, but do not issue a stop work order /.You are inspecting the placement of an embankment and notice that the compaction is below the required specification. What should you do? a. Accept the work and move on b. Notify the project manager and request that the compaction be corrected c. Issue a stop work order until the compaction can be corrected d. Document the issue in the construction logs and move on - Answer-b. Notify the project manager and request that the compaction be corrected /.You are asked to calculate the excavation and embankment quantities for a construction project. What information do you need to complete this task? a. The dimensions of the excavation and embankment areas b. The weight of the soil and other materials c. The density of the soil and other materials d. All of the above - Answer-d. All of the above /.You are inspecting a construction site and notice that temporary erosion and sediment controls are not properly installed. What should you do? a. Accept the work and move on b. Notify the project manager and request that the controls be corrected c. Issue a stop work order until the controls can be corrected d. Document the issue in the construction logs and move on - Answer-c. Issue a stop work order until the controls can be corrected /.You are inspecting the placement of a subgrade and notice that the undercutting is not to the specified depth. What should you do? a. Accept the work and move on b. Notify the project manager and request that the undercutting be corrected c. Issue a stop work order until the undercutting can be corrected d. Document the issue in the construction logs and move on - Answer-b. Notify the project manager and request that the undercutting be corrected /.You are asked to determine the acceptability of the results of a soil compaction test. What criteria should you use to make this determination? a. The compaction meets or exceeds the specified density b. The compaction meets or exceeds the specified moisture content c. The compaction meets or exceeds both the specified density and moisture content d. The compaction meets or exceeds the specified density or moisture content - Answer-c. The compaction meets or exceeds both the specified density and moisture content /.You are inspecting the placement of an aggregate subbase and notice that the finish tolerances are not being met. What should you do? a. Accept the work and move on b. Notify the project manager and request that the finish tolerances be corrected c. Issue a stop work order until the finish tolerances can be corrected d. Document the issue in the construction logs and move on - Answer-b. Notify the project manager and request that the finish tolerances be corrected /.You are asked to identify the limits of disturbance on a construction site. What are the limits of disturbance? a. The area where trees, shrubs, and other vegetation will be removed or damaged during construction b. The area where the construction activities will take place c. The area where the construction activities will have an impact on the environment d. All of the above - Answer-d. All of the above /.You are inspecting a construction site and notice that materials testing and certification are not being properly carried out. What should you do? a. Accept the work and move on b. Notify the project manager and request that the testing and certification be corrected c. Issue a stop work order until the testing and certification can be corrected d. Document the issue in the construction logs and move on - Answer-b. Notify the project manager and request that the testing and certification be corrected /.You are inspecting a construction site and notice that the soil appears to be a well-graded mixture of fine and coarse particles. What type of soil is this likely to be? a. Clay b. Sand c. Gravel d. Loam - Answer-d. Loam /.You are asked to identify the rights-of-way on a construction site. What are the rights-of-way? a. The areas where the construction activities will take place b. The areas where the construction will have an impact on the environment c. The areas where utilities, such as pipes and cables, are located d. All of the above - Answer-c. The areas where utilities, such as pipes and cables, are located /.You are asked to differentiate between an easement and a right-of-way. How are they different? a. An easement is an area where the construction activities will take place, while a right-of-way is an area where utilities, such as pipes and cables, are located b. An easement is a right to use another person's land for a specific purpose, while a right-of-way is a legal right to pass over another person's land c. An easement is a legal right to pass over another person's land, while a right-of-way is a right to use another person's land for a specific purpose d. There is no difference between an easement and a right-of-way - Answer-b. An easement is a right to use another person's land for a specific purpose, while a right-of-way is a legal right to pass over another person's land /.You are inspecting the placement of a subgrade and notice that the grading is not to the specified slope. What should you do? a. Accept the work and move on b. Notify the project manager and request that the grading be corrected c. Issue a stop work order until the grading can be corrected d. Document the issue in the construction logs and move on - Answer-b. Notify the project manager and request that the grading be corrected /.You are asked to calculate the excavation and embankment quantities for a construction project. What formula should you use to complete this task? a. Length x Width x Depth b. Length + Width + Depth c. Length x Width / Depth d. Length / Width x Depth - Answer-a. Length x Width x Depth /.You are asked to identify the properties of clay soil. Which of the following is NOT a property of clay soil? a. It has a high bearing capacity b. It is highly porous c. It has a high water retention capacity d. It is easy to compact - Answer-b. It is highly porous /.You are inspecting the placement of an embankment and notice that the compaction is above the required specification. What should you do? a. Accept the work and move on b. Notify the project manager and request that the compaction be corrected c. Issue a stop work order until the compaction can be corrected d. Document the issue in the construction logs and move on - Answer-a. Accept the work and move on

Content preview

NICET Level 2 Full Exam Practice Questions and
Answers 100% Pass

You are inspecting a construction site and notice that the soil appears to be a fine-
grained, cohesive material with good bearing capacity. What type of soil is this likely to
be?
a. Clay
b. Sand
c. Gravel
d. Loam - Answer-a. Clay

/.You are inspecting the clearing and grubbing of a construction site and notice that a
large tree has been removed within the limits of disturbance. What should you do?
a. Notify the project manager and request that a replacement tree be planted
b. Document the removal in the construction logs and move on
c. Issue a stop work order until a replacement tree can be planted
d. Request that the tree be replaced, but do not issue a stop work order - Answer-d.
Request that the tree be replaced, but do not issue a stop work order

/.You are inspecting the placement of an embankment and notice that the compaction is
below the required specification. What should you do?
a. Accept the work and move on
b. Notify the project manager and request that the compaction be corrected
c. Issue a stop work order until the compaction can be corrected
d. Document the issue in the construction logs and move on - Answer-b. Notify the
project manager and request that the compaction be corrected

/.You are asked to calculate the excavation and embankment quantities for a
construction project. What information do you need to complete this task?
a. The dimensions of the excavation and embankment areas
b. The weight of the soil and other materials
c. The density of the soil and other materials
d. All of the above - Answer-d. All of the above

/.You are inspecting a construction site and notice that temporary erosion and sediment
controls are not properly installed. What should you do?
a. Accept the work and move on
b. Notify the project manager and request that the controls be corrected
c. Issue a stop work order until the controls can be corrected
d. Document the issue in the construction logs and move on - Answer-c. Issue a stop
work order until the controls can be corrected

/.You are inspecting the placement of a subgrade and notice that the undercutting is not
to the specified depth. What should you do?

,a. Accept the work and move on
b. Notify the project manager and request that the undercutting be corrected
c. Issue a stop work order until the undercutting can be corrected
d. Document the issue in the construction logs and move on - Answer-b. Notify the
project manager and request that the undercutting be corrected

/.You are asked to determine the acceptability of the results of a soil compaction test.
What criteria should you use to make this determination?
a. The compaction meets or exceeds the specified density
b. The compaction meets or exceeds the specified moisture content
c. The compaction meets or exceeds both the specified density and moisture content
d. The compaction meets or exceeds the specified density or moisture content -
Answer-c. The compaction meets or exceeds both the specified density and moisture
content

/.You are inspecting the placement of an aggregate subbase and notice that the finish
tolerances are not being met. What should you do?
a. Accept the work and move on
b. Notify the project manager and request that the finish tolerances be corrected
c. Issue a stop work order until the finish tolerances can be corrected
d. Document the issue in the construction logs and move on - Answer-b. Notify the
project manager and request that the finish tolerances be corrected

/.You are asked to identify the limits of disturbance on a construction site. What are the
limits of disturbance?
a. The area where trees, shrubs, and other vegetation will be removed or damaged
during construction
b. The area where the construction activities will take place
c. The area where the construction activities will have an impact on the environment
d. All of the above - Answer-d. All of the above

/.You are inspecting a construction site and notice that materials testing and certification
are not being properly carried out. What should you do?
a. Accept the work and move on
b. Notify the project manager and request that the testing and certification be corrected
c. Issue a stop work order until the testing and certification can be corrected
d. Document the issue in the construction logs and move on - Answer-b. Notify the
project manager and request that the testing and certification be corrected

/.You are inspecting a construction site and notice that the soil appears to be a well-
graded mixture of fine and coarse particles. What type of soil is this likely to be?
a. Clay
b. Sand
c. Gravel
d. Loam - Answer-d. Loam

,/.You are asked to identify the rights-of-way on a construction site. What are the rights-
of-way?
a. The areas where the construction activities will take place
b. The areas where the construction will have an impact on the environment
c. The areas where utilities, such as pipes and cables, are located
d. All of the above - Answer-c. The areas where utilities, such as pipes and cables, are
located

/.You are asked to differentiate between an easement and a right-of-way. How are they
different?
a. An easement is an area where the construction activities will take place, while a right-
of-way is an area where utilities, such as pipes and cables, are located
b. An easement is a right to use another person's land for a specific purpose, while a
right-of-way is a legal right to pass over another person's land
c. An easement is a legal right to pass over another person's land, while a right-of-way
is a right to use another person's land for a specific purpose
d. There is no difference between an easement and a right-of-way - Answer-b. An
easement is a right to use another person's land for a specific purpose, while a right-of-
way is a legal right to pass over another person's land

/.You are inspecting the placement of a subgrade and notice that the grading is not to
the specified slope. What should you do?
a. Accept the work and move on
b. Notify the project manager and request that the grading be corrected
c. Issue a stop work order until the grading can be corrected
d. Document the issue in the construction logs and move on - Answer-b. Notify the
project manager and request that the grading be corrected

/.You are asked to calculate the excavation and embankment quantities for a
construction project. What formula should you use to complete this task?
a. Length x Width x Depth
b. Length + Width + Depth
c. Length x Width / Depth
d. Length / Width x Depth - Answer-a. Length x Width x Depth

/.You are asked to identify the properties of clay soil. Which of the following is NOT a
property of clay soil?
a. It has a high bearing capacity
b. It is highly porous
c. It has a high water retention capacity
d. It is easy to compact - Answer-b. It is highly porous

/.You are inspecting the placement of an embankment and notice that the compaction is
above the required specification. What should you do?
a. Accept the work and move on

, b. Notify the project manager and request that the compaction be corrected c. Issue a
stop work order until the compaction can be corrected
d. Document the issue in the construction logs and move on - Answer-a. Accept the
work and move on

/.You are inspecting a construction site and notice that temporary erosion and sediment
controls are not properly installed. What are the potential consequences of this issue?
a. Delays in the construction schedule
b. Increased construction costs
c. Environmental damage
d. All of the above - Answer-d. All of the above

/.You are asked to identify the properties of sand. Which of the following is NOT a
property of sand?
a. It has a low bearing capacity
b. It is highly porous
c. It has a low water retention capacity
d. It is difficult to compact - Answer-d. It is difficult to compact

/.ou are inspecting the placement of a subgrade and notice that the finish tolerances are
not being met. What are the potential consequences of this issue?
a. Delays in the construction schedule
b. Increased construction costs
c. Poor road performance
d. All of the above - Answer-d. All of the above

/.You are asked to identify the properties of gravel. Which of the following is NOT a
property of gravel?
a. It has a high bearing capacity
b. It is highly porous
c. It has a high water retention capacity
d. It is easy to compact - Answer-c. It has a high water retention capacity

/.You are inspecting the placement of an embankment and notice that the finish
tolerances are not being met. What should you do?
a. Accept the work and move on
b. Notify the project manager and request that the finish tolerances be corrected
c. Issue a stop work order until the finish tolerances can be corrected
d. Document the issue in the construction logs and move on - Answer-b. Notify the
project manager and request that the finish tolerances be corrected

/.You are inspecting the placement of an aggregate subbase and notice that the
compaction is below the required specification. What should you do?
a. Accept the work and move on
b. Notify the project manager and request that the compaction be corrected
c. Issue a stop work order until the compaction can be corrected

Document information

Uploaded on
February 28, 2025
Number of pages
36
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$15.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brainariam
3.3
(27)
Sold
154
Followers
7
Items
8387
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions