Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 87 pages
Exam (elaborations)

Measurement of Forest Resources Exam Questions with Verified Answers with correct detailed questions answers already graded A+

Document preview thumbnail
Preview 4 out of 87 pages

What are the seven credit categories of the LEED rating systems? - correct answers Sustainable Sites (SS) Water Efficiency (WE) Energy and Atmosphere (EA) Materials and Resources (MR) Indoor Environmental Quality (IEQ) Innovation in Design/Operations (ID or IO) Regional Priority (RP) What does balloting mean in regard to the LEED rating systems? - correct answers When a new version of a rating system is being drafted, after the 2 comment periods are complete, the revisions to the rating system are put to a vote and all USGBC members are encouraged to submit a vote for or against the approval of the revisions. Which credit category offers the most points in the LEED rating systems? - correct answers Energy and Atmosphere How many points must a commercial project achieve to become Certified? Silver? Gold? Platinum? - correct answers Certified: 40-49 points Silver: 50-59 points Gold: 60-79 points Platinum: 80+ points What is LEED Online? - correct answers LEED Online is a repository for information and documentation gathered during the design and construction phases. The online tools can assist in performing calculations, organizing the efforts of project team members, and summarizing the approaches that have been taken to earn points. What is the role of the decision maker for a particular credit? (Declarant) - correct answers The person that represents the discipline that has the most control over or responsibility for the design and/or implementation of that particular credit. In the LEED EBO&M rating system, if data can not be obtained from all tenants in a multitenant building, up to ___% of the gross floor space may be excluded. - correct answers 10% How many points can a project earn for Innovation in Design? - correct answers 6 points total Who determines applicable Regional Priority credits for a project? - correct answers Regional Council What are Minimum Program Requirements? - correct answers *Comply with environmental laws. *Be a building. *Use a reasonable site boundary. *Comply with minimum FTE and floor area requirements. *Comply with minimum occupancy rates. *Comply with reasonable timetables and rating system sunset dates for registration and certification activity. *Allow USGBC access to whole-building energy and water usage data. *Meet a minimum building area to site area ratio. Briefly describe how LEED credits are weighted. - correct answers Prerequisites and credits that address what USGBC has determined to be the most pressing environmental concerns or those that have the greatest potential for positively impacting the environment are worth the most points. Which LEED rating system includes a minimum occupancy requirement? Why? - correct answers LEED EBO&M-the project must be fully occupied for at least one year before the certification application is submitted, and at least 75% of spaces withing the building must be physically occupied at normal capacity during that time. The gross area of the project building may not be less than ___% of the LEED project site area. - correct answers 2% LEED NC projects must have a minimum of _____ square feet of indoor, enclosed building area. - correct answers 1000 gross sf List two reasons that ID credits may be awarded. - correct answers 1. Up to 3 points may be earned for 'exemplary performance' by exceeding the requirements of up to three other credits. 2. Additional points for ID Credit 1 (up to a total of 5 points) may also be awarded for 'comprehensive strategies which demonstrate quantifiable environmental benefits.' In which rating system may a project use a streamlined path for credits already earned under another rating system? - correct answers LEED EBO&M Projects seeking certification under the LEED EBO&M rating system that have already earned certain credits under another rating system may submit documentation for those same credits using a streamlined submittal template. Which LEED rating system requires a minimum level of acoustical performance? - correct answers LEED for Schools Three LEED Accredited Professionals are working on a project. How many ID credits will be awarded for their participation? - correct answers 1 An owner will occupy one-third of a new office building. Which LEED rating system should be used for certification? - correct answers LEED for Core & Shell Development LEED CS can be used for buildings where the property owner will occupy 50% or less of the leasable square footage. How often must LEED EBO&M buildings submit for recertification? - correct answers They can be recertified as often as every year and MUST submit for recertification at least every 5 years to maintain their status.

Content preview

Measurement of Forest Resources Exam

Questions with Verified Answers with correct

detailed questions answers already graded A+

What are the seven credit categories of the LEED rating systems? - correct
answers Sustainable Sites (SS)

Water Efficiency (WE)

Energy and Atmosphere (EA)

Materials and Resources (MR)

Indoor Environmental Quality (IEQ)

Innovation in Design/Operations (ID or IO)

Regional Priority (RP)



What does balloting mean in regard to the LEED rating systems? - correct
answers When a new version of a rating system is being drafted, after
the 2 comment periods are complete, the revisions to the rating system are
put to a vote and all USGBC members are encouraged to submit a vote for or
against the approval of the revisions.



Which credit category offers the most points in the LEED rating systems? -
correct answers Energy and Atmosphere

,How many points must a commercial project achieve to become Certified?
Silver? Gold? Platinum? - correct answers Certified: 40-49 points

Silver: 50-59 points

Gold: 60-79 points

Platinum: 80+ points



What is LEED Online? - correct answers LEED Online is a repository for
information and documentation gathered during the design and
construction phases. The online tools can assist in performing calculations,
organizing the efforts of project team members, and summarizing the
approaches that have been taken to earn points.



What is the role of the decision maker for a particular credit? (Declarant) -
correct answers The person that represents the discipline that has the
most control over or responsibility for the design and/or implementation of
that particular credit.



In the LEED EBO&M rating system, if data can not be obtained from all
tenants in a multitenant building, up to ___% of the gross floor space may be
excluded. - correct answers 10%

,How many points can a project earn for Innovation in Design? - correct
answers 6 points total



Who determines applicable Regional Priority credits for a project? - correct
answers Regional Council



What are Minimum Program Requirements? - correct answers *Comply
with environmental laws.

*Be a building.

*Use a reasonable site boundary.

*Comply with minimum FTE and floor area requirements.

*Comply with minimum occupancy rates.

*Comply with reasonable timetables and rating system sunset dates for
registration and certification activity.

*Allow USGBC access to whole-building energy and water usage data.

*Meet a minimum building area to site area ratio.



Briefly describe how LEED credits are weighted. - correct answers
Prerequisites and credits that address what USGBC has determined to be
the most pressing environmental concerns or those that have the greatest

, potential for positively impacting the environment are worth the most
points.



Which LEED rating system includes a minimum occupancy requirement?
Why? - correct answers LEED EBO&M-the project must be fully occupied
for at least one year before the certification application is submitted, and at
least 75% of spaces withing the building must be physically occupied at
normal capacity during that time.



The gross area of the project building may not be less than ___% of the LEED
project site area. - correct answers 2%



LEED NC projects must have a minimum of _____ square feet of indoor,
enclosed building area. - correct answers 1000 gross sf



List two reasons that ID credits may be awarded. - correct answers 1. Up
to 3 points may be earned for 'exemplary performance' by exceeding the
requirements of up to three other credits.



2. Additional points for ID Credit 1 (up to a total of 5 points) may also be
awarded for 'comprehensive strategies which demonstrate quantifiable
environmental benefits.'

Document information

Uploaded on
February 28, 2025
Number of pages
87
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
1
Followers
0
Items
347
Last sold
1 year ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions