ACI Concrete Field Testing Technician- Grade I Exam Questions With 100% Correct Answers .A 6 by 12 in [150 mm by 300 mm] cylinder mold can be used for concrete containing aggregate with particles not exceeding _____ in size, without the need for wet sieving the concrete. - ANSWER-2 in. [50 mm] .A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. True of False? - ANSWER-False .A mallet weighing ____ must be used to tap the sides of the bowl after rodding each layer. - ANSWER-1.25 +- 0.50 lb. (600 +- 200 g) .A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of False? - ANSWER-False .A plastic container can be used for the measure in this method. True or False? - ANSWER-False, measure must be steel or another suitable metal .According to ASTM C1064, what is one reason to take the temperature of concrete? - ANSWER-Verify conformance to a specified requirement for temperature of concrete .After completing the strike-off procedure, what must be done before weighing the measure and sample? - ANSWER-Clean off any excess concrete .After consolidation of the final layer, an excess of concrete ____ above the top of the measure is considered optimum. - ANSWER-1/8 in. [3 mm] .After molding test specimens, you should wait two hours before moving them to the location of initial storage. True or False? - ANSWER-False; the specimens must be moved immediately .After rodding each layer, what should be done to the measure before adding another layer of concrete? - ANSWER-Tap the sides of the measure smartly 10 to 15 times with the mallet .After the final rodding, the sides of the slump mold should should be tapped lightly with the tamping rod. True or False? - ANSWER-False

Content preview

ACI Concrete Field Testing Technician- Grade I Exam
Questions With 100% Correct Answers




.A 6 by 12 in [150 mm by 300 mm] cylinder mold can be used for
concrete containing aggregate with particles not exceeding _____
in size, without the need for wet sieving the concrete. - ANSWER-2
in. [50 mm]


.A composite sample of concrete is required even if the only
purpose for obtaining the sample is to determine temperature.
True of False? - ANSWER-False


.A mallet weighing ____ must be used to tap the sides of the bowl
after rodding each layer. - ANSWER-1.25 +- 0.50 lb. (600 +- 200 g)


.A maximum temperature of freshly mixed concrete is specified in
ASTM C1064. True of False? - ANSWER-False

,.A plastic container can be used for the measure in this method.
True or False? - ANSWER-False, measure must be steel or another
suitable metal


.According to ASTM C1064, what is one reason to take the
temperature of concrete? - ANSWER-Verify conformance to a
specified requirement for temperature of concrete


.After completing the strike-off procedure, what must be done
before weighing the measure and sample? - ANSWER-Clean off
any excess concrete


.After consolidation of the final layer, an excess of concrete ____
above the top of the measure is considered optimum. - ANSWER-
1/8 in. [3 mm]


.After molding test specimens, you should wait two hours before
moving them to the location of initial storage. True or False? -
ANSWER-False; the specimens must be moved immediately


.After rodding each layer, what should be done to the measure

, before adding another layer of concrete? - ANSWER-Tap the sides
of the measure smartly 10 to 15 times with the mallet


.After the final rodding, the sides of the slump mold should should
be tapped lightly with the tamping rod. True or False? - ANSWER-
False


.After the temperature of the concrete is read, what is required? -
ANSWER-Reporting of temperature


.Air meter bowls used for this test must conform to ASTM _____
and be calibrated for volumee according to ASTM _____. -
ANSWER-C231, C29


.ASTM Method gives standardized requirements for _____, _____,
_____, and _____, of test specimens. - ANSWER-Making, curing,
protecting, transporting


.At the end of the procedure, the air meter is _____. - ANSWER-
Disassembled and its contents examined


.Concrete mixtures with specified strengths of 6000 psi [40 MPa]

Document information

Uploaded on
February 27, 2025
Number of pages
25
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.58

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Docwyne6
3.5
(6)
Sold
33
Followers
11
Items
1706
Last sold
2 weeks ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions