1) A major function of the DOT is to carry out Construction and Reconstruction programs to provide the public with adequate transportation service. - CORRECT ANSWER-True For the DOT, the management of Construction and reconstruction projects involves the following specific responsibilities: A. Planning, Programming and design B. Contract administration C. Contractor payments D. Design and Contract Management E. All of the above - CORRECT ANSWER-E. All of the above 3) To pay for the work performed by Contractors, progress and Final Estimates are needed. True or False? - CORRECT ANSWER-True DESIGN STANDARDS - CORRECT ANSWER-These standards are made available for Design, Construction, Maintenance, and Utility operations on the State Highway System. This booklet provides guidelines and technical drawings for design and Construction personnel. SUPPLEMENTAL AGREEMENTS (SA) - CORRECT ANSWER-SA'S are work of a different characteristic from that shown in the original plans and contract; such as to clarify the Specifications, or pay for unforeseen work.

Show more Read less
Institution
CTQP Estimates Level 1
Course
CTQP Estimates Level 1









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CTQP Estimates Level 1
Course
CTQP Estimates Level 1

Document information

Uploaded on
February 24, 2025
Number of pages
11
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CTQP Final Estimates Level 1 Exam
Questions With Guaranteed Pass Latest
Update 2025/2026

1) A major function of the DOT is to carry out Construction and Reconstruction
programs to provide the public with adequate transportation service. - CORRECT
ANSWER-True



For the DOT, the management of Construction and reconstruction projects involves the
following specific responsibilities:

A. Planning, Programming and design

B. Contract administration

C. Contractor payments

D. Design and Contract Management

E. All of the above - CORRECT ANSWER-E. All of the above



3) To pay for the work performed by Contractors, progress and Final Estimates are
needed. True or False? - CORRECT ANSWER-True



DESIGN STANDARDS - CORRECT ANSWER-These standards are made available for
Design, Construction, Maintenance, and Utility operations on the State Highway
System. This booklet provides guidelines and technical drawings for design and
Construction personnel.



SUPPLEMENTAL AGREEMENTS (SA) - CORRECT ANSWER-SA'S are work of a
different characteristic from that shown in the original plans and contract; such as to
clarify the Specifications, or pay for unforeseen work.

, WORK ORDERS (WO) - CORRECT ANSWER-WO's are similar to SA's but can't be
used in all instances. They are used to include additional work into the original contract,
and to do minor changes.



JOINT PARTICIPATION AGREEMENTS (JPA) - CORRECT ANSWER-JPA's or Locally
Funded Agreements (LFA)'s are part of the State Contract with a separate Financial ID
Number. They are legal documents between the Department and other government or
private entities. The work would be a utility relocations or installations, etc.



1) Multiple choice. Which of the following is NOT officially considered to be a "Contract
Document"?

A. Supplemental Agreements and Work Orders.

B. Notebooks and Estimates Procedure Manual.

C. Standard Specifications.

D. Construction Manual.

E. Answers B &D - CORRECT ANSWER-E. Answer B & D



2) Multiple choice. Between printings of the Standard Specifications, what does the
Department publish to identify and describe changes in the Specifications?

A. CPAM

B. Supplemental Specifications

C. Work orders

D. Specifications Changes - CORRECT ANSWER-B Supplemental Specifications



3) Multiple choice. Select the correct sequence of documents in order of precedence,
with the document highest in authority listed first.

A. Contract Plans, Development Specifications, Standard Specifications, Special
Provisions, Technical Special Provisions, Supplemental Specifications, Design
Standards.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
remojudytask Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
82
Member since
2 year
Number of followers
30
Documents
3120
Last sold
5 days ago

3.2

25 reviews

5
6
4
3
3
11
2
0
1
5

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions