100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

NRA Test Questions and Answers Latest Version 2025

Rating
-
Sold
-
Pages
24
Grade
A+
Uploaded on
22-02-2025
Written in
2024/2025

NRA Test Questions and Answers Latest Version 2025

Institution
NRA Basic Pistol Shooting
Course
NRA Basic Pistol Shooting










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NRA Basic Pistol Shooting
Course
NRA Basic Pistol Shooting

Document information

Uploaded on
February 22, 2025
Number of pages
24
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NRA Test Questions and Answers Latest
Version 2025


What is the frequency that system restoration training for operators is required? -
ANSWER Annually



What is the purpose of annual operator system restoration training? - ANSWER
To assure proper execution of its restoration plan



Name 4 things required in annual operator system restoration training: - ANSWER
System restoration plan including coordination with RC and GO; Restoration
Priorities; Building of cranking paths; Synchronizng



How often and how much training is required for field switching personnel who are
included in the system restoration plan? - ANSWER Minimum 2 hrs every 2 years



When must a TO or GO participate in RC restoration drills, exercises or simulations? -
ANSWER As requested by the RC



What is a Blackstart Resource Agreement? - ANSWER This is an agreement between a
TO and GO that includes the terms and conditions of the use of the Blackstart Unit;
e.g. procedures, protocols, testing requirements



What is required by each GO for their Blackstart Resources? - ANSWER
Documented procuedures for starting each resource and energizing a bus

,Who must a GO notify if a Blackstart Resource ability to perform its function is
changed? - ANSWER The TO who holds the agreement



What is the time requirement for a GO to notify its TO when a Blackstart
Resource capabilities are compromised? - ANSWER 24 Hours



Who is required to perform the agreed upon testing of a Blackstart Resource? - ANSWER
The GO



What minimum information should be recorded for a Blackstart Resource test? -
ANSWER Name of Resource, unit tested, date of test, duration of test, time required to
start, and any test requirements not met



If requested by a TO or RC, when must Blackstart Resource test results be produced?
- ANSWER The GO has 30 days to provide test results to its TO or RC



How much time and how frequently must a GO train its personnel on starting a
Blackstart Resource and energizing a bus? - ANSWER 2 hours every 2 years minimum



What two things must be included in the GO Blackstart Resource biannual training?
- ANSWER The system restoration plan including coordination with the TO; The
procedures associated with the Blackstart Resource Agreement



What must each RC have in regard to restoration? - ANSWER Each RC is required to have
an RC Area Restoration Plan.

, Name the three things covered in the RC Area Restoration Plan? - ANSWER
Blackstart Resources used to re-energize a shut down area of the BES; separation has
occurred between neighboring RC; An energized island has been formed on the BES



When does the RC exit the Restoration plan? - ANSWER All TO are interconnected its RC
area is connected to all neighboring RC



What 9 things are included in the RC restoration plan? - ANSWER High level strategy;
Operating process to restore Interconnection; coordination elements between TO
restoration plans; elements between RC plans; criteria and condition for reestablishing
interconnections (TO-TO in the RC; TO-TO w/ other RC; w/ Other RC); Reporting
requirements; Criteria for info sharing w/ neighboring RC and TO/BA in its area; RC as
main contact for all parties; Criteria to transfer operations & authority back to BA



Who is in control during system restoration? - ANSWER RC



Who is given control after a system restoration has been completed? - ANSWER The
appropriate BA



To who must an RC distribute its RC Area Restoration Plan? - ANSWER Each of its TO,
neighboring RC



When must an RC distribute its RC Area Restoration Plan? - ANSWER Within 30 days of
creation or revision of the plan



How often must the RC review its restoration plan? - ANSWER Within 13 months from
last review


Who reviews an RC Restoration plan? - ANSWER The neighboring RC

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
KenAli West Virginia University
View profile
Follow You need to be logged in order to follow users or courses
Sold
84
Member since
1 year
Number of followers
5
Documents
17177
Last sold
2 weeks ago

2.9

19 reviews

5
4
4
4
3
4
2
0
1
7

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions