AIC Prep UH EXAM GUIDE QUESTIONS AN
x x x x x x




D ANSWERS GRADED A 2024
x x x x




Ax'placexconcrete'xactivityxrequiresxthexplacementxofx2080xcubicxyards.xIfxthexindividualxpro
ductionxratexisx2xcubicxyardsxperxworkxhourxperxperson,xwithxax10-
personxcrewxandx8xhourxworkday,xhowxmanyxdaysxarexneededxtoxcompletexthisxactivity?
a. 13
b. 26
c. 104
d. 130x-xa.x13

Axtopographicalxmapxisxaxdrawingxshowing?
a. Subsurfacexsoilxconditions
xb.xAxgeneralxprofilexviewxofxthexsite

c.xContourxlinesxandxelevationsxd.xCrossxsectionsxalongxthexlengthxofxthexprojectx-
xc.xContourxlinesxandxelevations




Thexowner'sxrepxobservedxsubstandardxdrywallxpatchesxonxaxgeneralxcontractor'sxrenovat
ionxproject.xWhichxofxthexfollowingxshouldxbexthexrepresentative'sxfirstxcoursexofxaction?
a. Savexitemsxforxpunchxlist
b. Notifyxdrywallxfinisherxofxthexproblem
c. Tellxpainterxnotxtoxacceptxpatchedxwalls.
d. Notifyxgeneralxcontractorsxsuperintendxofxproblemx-
xd.xNotifyxgeneralxcontractorsxsuperintendxofxproblem




FivexContractorsxarexbiddingxpartxofxaxjobxwithxstormxsewer,xsanitaryxsewer,xandxwaterxdist
ribution.xTheirxbidsxare:xContractorx1xwillxdoxstormxandxwaterxforx$2000.xContractorx2xwillxd
oxstormxforx$1000.xContractorx3xwillxdoxsanitaryxandxwaterxforx$12,000.xContractorx4xwillxd
oxsanitaryxforx$7,000xContractorx5xwillxdoxwaterxforx$7,000xWhatxisxthexlowestxpricexforxthex
completexjob?
xa.x$7,000

b. $9,000
c. $13,000
d. $15,000x-xb.x$9,000

Whichxofxthexfollowingxcanxbexidentifiedxfromxthexinitialxschedulexofxvalues?
a. Vendorsxworkingxonxthexproject
b. Contractorsxproposedxbreakdownxofxthexprojectxcostxc.xProfitxmarginxofxthexapplicant
d.xQualityxofxworkxinxplacex-xb.xContractorsxproposedxbreakdownxofxthexprojectxcost

Whoxisxprimarilyxresponsiblexforxensuringxthatxcontractxdocumentsxcomplyxwithxbuildingxco
des?
a. Owner

,b. Contractor
c. Buildingxinspector
d. Architectxdesignxprofessionalx-xd.xArchitectxdesignxprofessional

Whatxmethodxisxusedxtoxcalculatexactivityxduration?
a. Dailyxproductionxratexdividedxbyxplanxquantity
b. Planxquantityxdividedxbyxcrewxrate
c. Planxquantityxdividedxbyxdailyxproductionxrate
d. Planxquantityxdivedxbyxlaborxunitxcostx-
xc.xPlanxquantityxdividedxbyxdailyxproductionxrate




ThexarchitectxhasxapprovedxthexreroutingxofxanxHVACxthroughxconcretexslabsxinxaxbuildin
g.xToxinsurexthatxactivitiesxarexcoordinated,xaxmeetingxshouldxbexcalledxbyxthexfieldxsupervi
sorxandxthe
a. HVACxsubcontractorxonly
b. HVACxsubcontractorxandxallxotherxsubcontractors
c. HVACxsubcontractorxandxallxotherxaffectedxsubcontractors
d. HVACxsubcontractorxandxthexarchitectxengineerx-
xc.xHVACxsubcontractorxandxallxotherxaffectedxsubcontractors




Axprojectxschedulexhasxbeenxupdated.xThexactivityxplacementxofxspreadxfootingxconcretexw
asxoriginallyxscheduledxtoxbeginxasxearlyxasxdayx10.xThexactivityxdurationxisx4xdays.
Thexactualxstartxdayxwasxdayx12.xThexoriginalxschedulexhadxcalculatedxtotalxfloatxofx7xdaysx
forxthisxactivity.xThexrecalculatedxtotalxfloatxforxthexactivity,xwhenxupdated,xwouldxbe
a. 2xdays
b. 5xdays
c. 6xdays
d. 9xdaysx-xb.x5xdays

10. Underxaxdesign-
buildxcontractxwhichxofxthexfollowingxpartiesxisxresponsiblexforxcoordinationxofxthexd
esignxengineersxandxthexsubcontractors
a. Owner
b. Contractor
c. Architect
d. Subcontractorx-xb.xContractor

Concretextoxbexpouredxforx10xfootingsxarex5xfeetxwidexbyx5xfeetxlongxbyx2xfeetxdeep.xHowxm
anyxcubicxyardsxofxconcretexshouldxthexestimatexbexforxthisxpour,xusingxax10%wastexfactor.
a. 14.8
b. 16.3
c. 18.5
d. 20.3x-xd.x20.3

,Whatxisxthextermxforxaxchangexorderxissuedxbyxthexownerxofxaxprojectxthatxisxoutsidexofxthex
contractor'sxscopexofxworkxandxthereforexthexcontractorxcanxaxrefusextoxperformxthexwork?
a. CardinalxChange
b. PreliminaryxChange
c. Noxcostxchangexorder
d. Supplementalxinstructionsx-xa.xCardinalxChange

Whatxisxax"SchedulexofxValues"?xa.xAxlistxofxethicalxpracticesxinxwhichxemployeesxmayxparti
cipate
b. axtablexshowingxaveragexwagexratesxforxeachxcrew
c. axbreakdownxofxthexcontractxamountxintoxpayxitems
d. axlistxofxconstructionxactivitiesx-xc.xaxbreakdownxofxthexcontractxamountxintoxpayxitems

Duringxlayoutxofxaxsite,xitxisxdeterminedxthatxthexslopexdistancexbetweenxpointxAxandxpointx
Bxisx200xfeetxatxaxslopexanglexofx15xdegrees.xWhatxisxthexactualxhorizontalxdistancex(Hxdista
nce)xonxthexplansxfromxpointxAxtoxpointxB?
a. 181.26'
b. 193.19'
c. 199.44'
d. 207.06'x-xb.x193.19'

AccordingxtoxCSI,xwhichxofxthexfollowingxisxinxthexprojectxmanual?
a. Generalxrequirements
b. Estimate
c. schedule
d. Certificatexofxoccupancyx-xa.xGeneralxrequirements

Whichxofxthexfollowingxarexcalculatedxbyxthex"Backwardxpass"xthroughxthexCPMxnetwork?
a. Earlyxstartxandxlatexstart
b. Totalxfloatxandxfreexfloat
c. Earlyxstartxandxearlyxfinish
d. Latexstartxandxlatexfinishx-xd.xLatexstartxandxlatexfinish

Whichxofxthexfollowingxpre-
bidxinformationxshouldxbexgatheredxforxdevelopingxaxbidxproposal?xa.xSchematicxdesign,xd
esignxdevelopmentxdrawings,xcontractxdocuments,xprojectxmanual,xandxbidxdocuments
b. adjacentxsitexconditions,xexistingxsurfacexconditions,xexistingxutilityxlocations,xandxfieldxd
imensions
c. valuexengineeringxcriteria,xdesignxoutlinexspecifications,xtotalxqualityxmanagementx
procedures,xsafetyxmanagementxprocedures
d. shopxdrawings,xproductxdataxsheets,xsamples,xandxsubmittalxlogsx-
xa.xSchematicxdesign,xdesignxdevelopmentxdrawings,xcontractxdocuments,xprojectxma

nual,xandxbidxdocuments

, Subcontractorx"A"xsubmitsxshopxdrawingsxtoxthexGCxwhichxincludexmaterialsxthatxdoxnotxc
omplyxwithxthexcontractxdocuments.xThexGCxasxwellxasxthexarchitectxstampsxallxofxthemx"re
viewed".xThexmaterialsxarexthenxshippedxtoxthexjobxsite.xDuringxanxoff-
loadingxinspection,xthexGCxnoticesxthexnoncompliance.xWhatxactionxshouldxthexGCxtakexc
oncerningxthexmatter?
a. installxthemxbecausexthexarchitect'sxstampxisxaxvariancextoxthexcontractxdocument
b. installxthemxandxaskxforxaxdiscountxfromxthexsubcontractorxc.xacceptxandxinstallxm
aterials
d.xrejectxthexshipmentxandxrequirexcompliancexwithxthexcontractxdocumentsx-
xd.xrejectxthexshipmentxandxrequirexcompliancexwithxthexcontractxdocuments




Whichxofxthexfollowingxincorporatesxthextracking,xconfirming,xandxacceleratingxofxdeliveryxo
fxanxitemxthatxhasxbeenxpurchased?
a. Routing
b. Expediting
c. Monitoring
d. Controllingx-xb.xExpediting

Howxshouldxaxconstructorxestablishxthexfieldxstaffingxforxaxproject?
a. inxconsultationxwithxthexarchitectxandxthexowner
b. inxConformancexwithxOSHAxandxADAxrequirements
c. Byxreferencextoxaxcostxmanual
d. byxutilizationxofxpastxexperiencexandxschedulexrequirementsx-
xd.xbyxutilizationxofxpastxexperiencexandxschedulexrequirements




ifxaxschedulexisxaccelerated,xwhichxofxthexfollowingxactivitiesxmustxbexfocusedxonxfirst?xa.xC
riticalxactivitiesxb.xNonxcriticalxActivitiesxc.xallxactivitiesxwithxfloatxtimexd.xallxactivitiesxwithxth
exleastxcostsx-xa.xCriticalxactivities

Whichxofxthexfollowingxprovidesxthexhighestxstrengthxtoxdimensionalxlumber?
a. moisturexcontent
b. agexofxwood
c. grainxorientation
d. knotsx-xc.xgrainxorientation

WhichxofxthexfollowingxhasxthexhighestxpriorityxafterxaxdiscoveryxonxaxMondayxmorningxthatx
thexjobxsitexhasxbeenxvandalizedxandxthexmagazinexcasesxhavexbeenxemptiedxofxexplosiv
es?
a. Callxthexinsurancexagentxtoxseexifxdamagexisxcovered
b. Callxthexpolicextoxinitiatexanxinvestigation
c. Pullxthexrecordsxonxexplosivesxstoredxonxthexsite
d. Beginxcleanupxandxrepairxthexdamagex-xb.xCallxthexpolicextoxinitiatexanxinvestigation

Whatxisxthexpointxinxthexprojectxwhenxthexarchitectxhasxdeterminedxthatxthexfacilityxorxaxporti
onxofxthexfacilityxisxacceptablexforxownerxusexandxoccupancy?
a. Substantialxcompletionxdate

Document information

Uploaded on
February 17, 2025
Number of pages
32
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$3.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Nursebriana
5.0
(101)
Sold
10
Followers
2
Items
447
Last sold
2 months ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions