Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

ISDS 406 Exam Questions with Accurate Solutions

Document preview thumbnail
Preview 2 out of 8 pages

ISDS 406 Exam Questions with Accurate Solutions

Content preview

ISDS 406 Exam Questions with Accurate
Solutions
4 stages of the SDLC: Planning, Analysis, Design, Implementation

What are four stages of SDLC?

The technical feasibility (Can we build it?)
The economic feasibility (Will it provide business value?
The organizational feasibility (If we build it, will it be used?)

What are three categories of feasibility analysis?

Process, Data Flow, External Entities, Data store

What are four elements of DFD?

Data Store

Which element is never included in Context Diagram?

2 types of Functional Requirements:
1. Process-oriented: a process the system must perform/do
2. Information-oriented: information the system must contain


4 types of Non-Functional Requirement:
1. Operational: the physical and technical environments in which the system will
operate
2. Performance: the speed, capacity, and reliability of the system
3. Security: who has authorized access to the system under what circumstances
4. Cultural and Political: cultural and political factors and legal requirements that
affects the system

, Two types of functional and four types of non-functional system requirements

- Functional: specify the support the system will provide to the user in fulfilling his/her
work tasks
- Non-functional: includes important behavioral properties that the system must have

System requirements: functional vs non-functional

- Business needs: the business-related reason for initiating the system
- Business requirements: the new or enhanced business capabilities that the system
will provide
- Business value: the benefit that the system will create for the organization

Definitional of business needs, business requirements and business value

- Project size: the size of the system (what it does)
- Project time: the time to complete the project (when it will be finished)
- Project cost: Cost of the project

Three main things that project managers have to balance

B. Analysis

Which phase of the Systems Development Life Cycle (SDLC) has system proposal as its
primary output?


A. Planning
B. Analysis
C. Design
D. Implementation

C. Make trade-offs

Document information

Uploaded on
February 13, 2025
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
QUINTER
3.6
(72)
Sold
407
Followers
106
Items
39871
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions