ARE 5.0 PJM Exam Questions with 100% Correct Answers | Graded A+ RFI - RFI Type 1: Graphic/Confirming RFI RFI Type 2: Coordination/Missing Information RFI RFI Type 3: Code/Contract Information RFI RFIs are issued by contractors during the Construction Administration (CA), and Bidding & Negotiation phases of a project. During bidding and negotiations Architects respond to RFIs with Addenda and during the CA phase RFIs should be addressed through the AIA G716 and/or change orders/directives. In order to track the cost of quality on a project, RFIs should be tracked by the amount of hours that are required to respond to them. top down approach - Top-down approach takes less time and decisions can be taken faster The top-down approach is more effective when the project cost is can only be roughly estimated

Show more Read less
Institution
NCARB - National Council Of Architectural Registration Boards Certified
Course
NCARB - National Council of Architectural Registration Boards Certified










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NCARB - National Council of Architectural Registration Boards Certified
Course
NCARB - National Council of Architectural Registration Boards Certified

Document information

Uploaded on
February 12, 2025
Number of pages
30
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

ARE 5.0 PJM Exam Questions with 100%
Correct Answers | Graded A+

RFI - ✔✔RFI Type 1: Graphic/Confirming RFI

RFI Type 2: Coordination/Missing Information RFI

RFI Type 3: Code/Contract Information RFI

RFIs are issued by contractors during the Construction Administration (CA), and

Bidding & Negotiation phases of a project.

During bidding and negotiations Architects respond to RFIs with Addenda and

during the CA phase RFIs should be addressed through the AIA G716 and/or

change orders/directives.

In order to track the cost of quality on a project, RFIs should be tracked by the

amount of hours that are required to respond to them.

top down approach - ✔✔Top-down approach takes less time and decisions can

be taken faster



The top-down approach is more effective when the project cost is can only be

roughly estimated




Page 1 of 30
©JOSHCLAY 2025/2026. YEAR PUBLISHED 2025.

,A combination of top down and bottom up approach would yield more accurate

estimates

Personal injury protection - ✔✔protects against charges of defamation, libel,

and slander.

Test borings - ✔✔Test borings are performed by a geotechnical engineer by

drilling holes into the soil in order to determine some or all of the following:



Ability of the soil to support structures on the surface with or without additional

assistance from footings, piers, and other aids



Permeability of the soil to determine whether it will percolate sufficiently for an

on-site septic system



Discover and monitor leakage from underground storage tanks or the presence

of other contaminants.

quality management actions during programming - ✔✔Teaming: Two or more

people should convene to gather information through client interviews, work

sessions, and direct observation; Benchmarking Tours: Benchmarking includes

the direct observation of state-of-the-art facilities similar to that being

Page 2 of 30
©JOSHCLAY 2025/2026. YEAR PUBLISHED 2025.

, programmed; Consensus reviews: A second series of interviews or work sessions

is held to confirm that the knowledge was accurately communicated to the

design team; Phasing: Phasing includes setting priorities for detailed client

information and assembly of information.

The UniFormat framework establishes costs based on what - ✔✔The UniFormat

system breaks down projects by functional elements rather than material or

method. These functional elements are often defined by system or assembly.

The UniFormat system is useful for classifying and estimating construction

during schematic design.

How does the completion of a schematic design help the preparation for the

next project - ✔✔It creates an ongoing critical discussion concerning its qualities

and familiarizes all team members with the products and process of the firm's

creative approach.

an example of a special condition - ✔✔Union labor rates

What type of survey should the owner order - ✔✔ALTA

According to the AIA document B101 Section 5.4, the owner is to provide a

survey that describes physical characteristics, legal limitations, utility locations,

and a written legal description of the site. ALTA stands for American Land Title

Association and an ALTA survey is a comprehensive survey that reveals
Page 3 of 30
©JOSHCLAY 2025/2026. YEAR PUBLISHED 2025.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
JOSHCLAY West Governors University
View profile
Follow You need to be logged in order to follow users or courses
Sold
240
Member since
2 year
Number of followers
14
Documents
17754
Last sold
3 days ago
JOSHCLAY

JOSHCLAY EXAM HUB, WELCOME ALL, HERE YOU WILL FIND ALL DOCUMENTS & PACKAGE DEAL YOU NEED FOR YOUR SCHOOL WORK OFFERED BY SELLER JOSHCLAY

3.6

51 reviews

5
21
4
8
3
10
2
5
1
7

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions