ARE CE Exam Questions and Answers Solved Correctly Latest Update 2025 Selecting project delivery method - Answers 1. Driving factor 2. Architect's Role 3. Contractor Role 4. Construction Cost Est. 5. # of construction contrcats CM Adviser - Answers -CM acts only as a Constructability and cost management consultant to the owner during design and construction process -CM is not the builder - CM adviser can be delivered under any of the delivery methods CM-Agent - Answers -CM provides early consulting and may act on behalf of the owner in assembling and coordinating construction trades prior and during construction -CM typically provide their services for a fixed fee -CM does not assume risk for the actual construction cost, passes on both savings and overruns to the owner CM-C - Answers -Involved from the start -preconstruction: prelim eval of program, schedule, budget, consultation, recommend phased construction -set the GMP -construction phase: solicit bids, administer subs work, OACs, maintain schedule, track cost Build-operate-transfer (BOT) - Answers Consolidated construction, development, building operation teams deliver the project and run it for a while before transferring it to new ownership (overseas model) Design Assist - Answers Shop drawings by subs incorporated directly into the CDs Project Alliance - Answers Often associated with Integrated Project Delivery method. Allows for the payment of direct costs incurred by team members, but ties additional compensation to performance. The payment of profit, overhead, and bonuses depends on the successful completion of the project's goals. This is intended to make team members work together for a successful outcome. Participants waive their liability to each other. Mechanisms for dispute resolution are not part of the contract because all parties agree to comply with decisions that the team makes by consensus. Why CMC as estimator - Answers 1. Experience in valuation of construction processes and mtls 2. Already providing other pre on services Architect Assistance in CM selection - Answers -clearly define scope of work -attend the interviews -document tracking procedures for multiple bid Addendum - Answers After sent to bid, before bidders selected Allowance - Answers Hold of money for unknown quantities or types of items Bid alternate - Answers Base bid - Answers Responsible bidder - Answers One who can demonstrate financial capacity to perform the contracted work Payment bond - Answers Performance bond - Answers Privately funded project - Answers Publicly funded project - Answers Responsive bid - Answers One in which all bidding requirements, including all elements of the bid form, have been satisfactorily completed Spearin Gap Risk - Answers Procurement Documents - Answers The documents utilized in bid and proposal activities, which include the buyer's Invitation for Bid, Invitation for Negotiations, Request for Information, Request for Quotation, Request for Proposal, and seller's responses. Instructions to Bidders - Answers Outlines the procedures and requirements that the bidders must follow in submitting bids, how the bids will be considered and submittals required of the successful bidder Bid Bond - Answers Bid Form - Answers Which is NOT a part of the contract documents? Addenda; Bid form; Specifications; or Owner-Contractor Agreement?

Content preview

ARE CE Exam Questions and Answers Solved Correctly Latest Update 2025

Selecting project delivery method - Answers 1. Driving factor

2. Architect's Role

3. Contractor Role

4. Construction Cost Est.

5. # of construction contrcats

CM Adviser - Answers -CM acts only as a Constructability and cost management consultant to the owner
during design and construction process

-CM is not the builder

- CM adviser can be delivered under any of the delivery methods

CM-Agent - Answers -CM provides early consulting and may act on behalf of the owner in assembling
and coordinating construction trades prior and during construction

-CM typically provide their services for a fixed fee

-CM does not assume risk for the actual construction cost, passes on both savings and overruns to the
owner

CM-C - Answers -Involved from the start

-preconstruction: prelim eval of program, schedule, budget, consultation, recommend phased
construction

-set the GMP

-construction phase: solicit bids, administer subs work, OACs, maintain schedule, track cost

Build-operate-transfer (BOT) - Answers Consolidated construction, development, building operation
teams deliver the project and run it for a while before transferring it to new ownership (overseas model)

Design Assist - Answers Shop drawings by subs incorporated directly into the CDs

Project Alliance - Answers Often associated with Integrated Project Delivery method. Allows for the
payment of direct costs incurred by team members, but ties additional compensation to performance.
The payment of profit, overhead, and bonuses depends on the successful completion of the project's
goals. This is intended to make team members work together for a successful outcome. Participants
waive their liability to each other. Mechanisms for dispute resolution are not part of the contract
because all parties agree to comply with decisions that the team makes by consensus.

, Why CMC as estimator - Answers 1. Experience in valuation of construction processes and mtls

2. Already providing other pre on services

Architect Assistance in CM selection - Answers -clearly define scope of work

-attend the interviews

-document tracking procedures for multiple bid

Addendum - Answers After sent to bid, before bidders selected

Allowance - Answers Hold of money for unknown quantities or types of items

Bid alternate - Answers

Base bid - Answers

Responsible bidder - Answers One who can demonstrate financial capacity to perform the contracted
work

Payment bond - Answers

Performance bond - Answers

Privately funded project - Answers

Publicly funded project - Answers

Responsive bid - Answers One in which all bidding requirements, including all elements of the bid form,
have been satisfactorily completed

Spearin Gap Risk - Answers

Procurement Documents - Answers The documents utilized in bid and proposal activities, which include
the buyer's Invitation for Bid, Invitation for Negotiations, Request for Information, Request for
Quotation, Request for Proposal, and seller's responses.

Instructions to Bidders - Answers Outlines the procedures and requirements that the bidders must
follow in submitting bids, how the bids will be considered and submittals required of the successful
bidder

Bid Bond - Answers

Bid Form - Answers Which is NOT a part of the contract documents? Addenda; Bid form; Specifications;
or Owner-Contractor Agreement?

"Cost of the Work" includes... - Answers -labor

Document information

Uploaded on
February 11, 2025
Number of pages
14
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$9.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TutorJosh
3.4
(74)
Sold
473
Followers
16
Items
32562
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions