Why are the MSDS so important for workers to read at the job site? - CORRECT
ANSWER - Material Safety Data Sheet provide important knowledge on how to work
with toxic materials at the job site.
Quality assurance includes all of the following practices EXCEPT: - CORRECT
ANSWER - Testing standards
Which of the following is NOT an item of personal protective equipment that might be used by
workers on the jobsite? - CORRECT ANSWER - Hardhat, Gloves
Which of the following is NOT a type of personal protection equipment? - CORRECT
ANSWER - Skin Protection
Which of the following does NOT describe preparatory inspections? - CORRECT
ANSWER - Preparatory inspections are never done by personnel employed by the
contractor
Which of the following are primary cause of injuries in the construction industry? - CORRECT
ANSWER - Slips Trips and Falls, Being crushed or trapped, Electrical shocks
Which of the following are primary component of an effective safety management plan? -
CORRECT ANSWER - Substance abuse, Hazardous material communications, Personal
protection
Which Federal agency is responsible for establishing safety standards and enforcing them
through inspections conducted at construction jobsites? - CORRECT ANSWER - OSHA
,Which quality control mechanism are mandated by the construction contract and used to check
for conformance to the plans and specifications? - CORRECT ANSWER - submittals,
mock ups, shop drawings
Which of the following shows the general relationship between the level of quality and cost? -
CORRECT ANSWER - when quality increases, cost increases
All of the following are fundamental objectives of a quality management plan: - CORRECT
ANSWER - Do things right the first time, Prevent things from going wrong, Continually
improve the process
What is an FOR? - CORRECT ANSWER - A report used to track questionable quality and
safety performance on the jobsite
Which of the following is a difference between quality control and quality assurance? -
CORRECT ANSWER - Quality control happens at the project level while quality
assurance happens at the process level
The name of the testing agency for construction in the United States is: - CORRECT
ANSWER - ASTM
What is not the concept behind a zero-punch list? - CORRECT ANSWER - Complete the
final walk-through with as many of the punch items noted on the list, To have no change orders
on the project, Please every expectation of the owner
What is the cost code chart usually made up of? - CORRECT ANSWER - activity, code,
project number
What is the riskiest element of the project control and project planning? - CORRECT
ANSWER - estimating productivity
, Periodic predictions stated in reports as to the final cost and schedule outcomes on a project
while the work is still going on are known as: - CORRECT ANSWER - forecasts
What is an example of a factor that can impact project performance? - CORRECT
ANSWER - Defective Material, Hurricane in your project area,
Overcrowded Job sites
What is NOT an escalation clause? - CORRECT ANSWER - It is a clause that covers
when the truck can deliver building materials,
It is the same thing as a contingency and tries to account for unforeseen conditions,
It is a clause that covers risks associated with underground utilities, grading, and excavation
What is the essential(s) of an effective project control system? - CORRECT ANSWER -
Quality Information , Good Reporting system
What does it mean to crash the schedule? - CORRECT ANSWER - To compress the
overall schedule by accelerating certain activities within it so that they finish sooner
What does it mean to forecast in project management? - CORRECT ANSWER - To predict
the final cost and schedule outcomes on a project while the work is still in progress
What are the three primary tracking elements when monitoring project performance? -
CORRECT ANSWER - Quality, Cost, and Time
What is not one of the fundamental steps that is included in the project control cycle? -
CORRECT ANSWER - update technology