Construction Management Final Exam UPDATED ACTUAL Exam Questions and CORRECT Answers Why are the MSDS so important for workers to read at the job site? - CORRECT ANSWER - Material Safety Data Sheet provide important knowledge on how to work with toxic materials at the job site. Quality assurance includes all of the following practices EXCEPT: - CORRECT ANSWER - Testing standards

Show more Read less
Institution
Construction
Course
Construction










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Construction
Course
Construction

Document information

Uploaded on
February 7, 2025
Number of pages
19
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • construction management

Content preview

Construction Management Final Exam
UPDATED ACTUAL Exam Questions and
CORRECT Answers
Why are the MSDS so important for workers to read at the job site? - CORRECT
ANSWER - Material Safety Data Sheet provide important knowledge on how to work
with toxic materials at the job site.


Quality assurance includes all of the following practices EXCEPT: - CORRECT
ANSWER - Testing standards


Which of the following is NOT an item of personal protective equipment that might be used by
workers on the jobsite? - CORRECT ANSWER - Hardhat, Gloves


Which of the following is NOT a type of personal protection equipment? - CORRECT
ANSWER - Skin Protection


Which of the following does NOT describe preparatory inspections? - CORRECT
ANSWER - Preparatory inspections are never done by personnel employed by the
contractor


Which of the following are primary cause of injuries in the construction industry? - CORRECT
ANSWER - Slips Trips and Falls, Being crushed or trapped, Electrical shocks


Which of the following are primary component of an effective safety management plan? -
CORRECT ANSWER - Substance abuse, Hazardous material communications, Personal
protection


Which Federal agency is responsible for establishing safety standards and enforcing them
through inspections conducted at construction jobsites? - CORRECT ANSWER - OSHA

,Which quality control mechanism are mandated by the construction contract and used to check
for conformance to the plans and specifications? - CORRECT ANSWER - submittals,
mock ups, shop drawings


Which of the following shows the general relationship between the level of quality and cost? -
CORRECT ANSWER - when quality increases, cost increases


All of the following are fundamental objectives of a quality management plan: - CORRECT
ANSWER - Do things right the first time, Prevent things from going wrong, Continually
improve the process


What is an FOR? - CORRECT ANSWER - A report used to track questionable quality and
safety performance on the jobsite


Which of the following is a difference between quality control and quality assurance? -
CORRECT ANSWER - Quality control happens at the project level while quality
assurance happens at the process level


The name of the testing agency for construction in the United States is: - CORRECT
ANSWER - ASTM



What is not the concept behind a zero-punch list? - CORRECT ANSWER - Complete the
final walk-through with as many of the punch items noted on the list, To have no change orders
on the project, Please every expectation of the owner


What is the cost code chart usually made up of? - CORRECT ANSWER - activity, code,
project number


What is the riskiest element of the project control and project planning? - CORRECT
ANSWER - estimating productivity

, Periodic predictions stated in reports as to the final cost and schedule outcomes on a project
while the work is still going on are known as: - CORRECT ANSWER - forecasts


What is an example of a factor that can impact project performance? - CORRECT
ANSWER - Defective Material, Hurricane in your project area,
Overcrowded Job sites


What is NOT an escalation clause? - CORRECT ANSWER - It is a clause that covers
when the truck can deliver building materials,


It is the same thing as a contingency and tries to account for unforeseen conditions,


It is a clause that covers risks associated with underground utilities, grading, and excavation


What is the essential(s) of an effective project control system? - CORRECT ANSWER -
Quality Information , Good Reporting system


What does it mean to crash the schedule? - CORRECT ANSWER - To compress the
overall schedule by accelerating certain activities within it so that they finish sooner


What does it mean to forecast in project management? - CORRECT ANSWER - To predict
the final cost and schedule outcomes on a project while the work is still in progress


What are the three primary tracking elements when monitoring project performance? -
CORRECT ANSWER - Quality, Cost, and Time


What is not one of the fundamental steps that is included in the project control cycle? -
CORRECT ANSWER - update technology

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES Stanford University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1099
Member since
1 year
Number of followers
102
Documents
68972
Last sold
2 hours ago
MGRADES (Stanford Top Brains)

Welcome to MGRADES Exams, practices and Study materials Just think of me as the plug you will refer to your friends Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3.8

176 reviews

5
75
4
31
3
47
2
8
1
15

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions