1. Lack of water in the soil
sur- rounding wells Cone of Depression
2. Design-Build ( speeds up the process ) The owner contracts with
one enti- ty (a person or firm) to provide both
design and construction services, that entity then
subcontracts portions of the work to others as
needed.
Suited for time sensitive projects
Speedier project delivery
Fast tracking is possible
No checks or balances between contractor and
architect (from same entity)
3. Design-Bid-Build (Slower process) The owner has two separate
contracts with an architect and contractor. Architect
designs the project, project is sent to bid, and then
the contractor who wins the bid constructs the
project.
4. Turnkey Type of contract where project is handed over or
sold after completion.
5. Design Bid Build projects, fi- Design
nal construction documents
are produced in which
phase?
6. procurement Final construction documents must be finished to
allow dif- ferent contractors to bid
7. Project incentives Certain financial benefits to the contractor if the
job is fin- ished before the dedicated
completion date
1/
4
solutions 2025-2026 latest update
1. Lack of water in the soil
sur- rounding wells Cone of Depression
2. Design-Build ( speeds up the process ) The owner contracts with
one enti- ty (a person or firm) to provide both
design and construction services, that entity then
subcontracts portions of the work to others as
needed.
Suited for time sensitive projects
Speedier project delivery
Fast tracking is possible
No checks or balances between contractor and
architect (from same entity)
3. Design-Bid-Build (Slower process) The owner has two separate
contracts with an architect and contractor. Architect
designs the project, project is sent to bid, and then
the contractor who wins the bid constructs the
project.
4. Turnkey Type of contract where project is handed over or
sold after completion.
5. Design Bid Build projects, fi- Design
nal construction documents
are produced in which
phase?
6. procurement Final construction documents must be finished to
allow dif- ferent contractors to bid
7. Project incentives Certain financial benefits to the contractor if the
job is fin- ished before the dedicated
completion date