Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

FDNY COF B28 NEW EXAM 100% VERIFIED

Document preview thumbnail
Preview 2 out of 10 pages

FDNY COF B28 NEW EXAM 100% VERIFIED...

Content preview

FDNY COF B28 NEW EXAM 100% VERIFIED



Central Station - ANSWER A facility that receives alarm signals from a protected
premises and re-transmits or reports these signals to the Fire Department.



Certificate of Approval - ANSWER A written statement issued by the FDNY
commissioner certifying that an article, device, or equipment has been examined,
tested, and approved for specific use in conformity with the Fire Code or Fire
Department Rules.



Abnormal Conditions - ANSWER When one or more parameters that govern the
operation of a system are outside their control limits.



Alarm Signal - ANSWER A signal indicating an emergency requiring immediate action,
such as a signal indicative of fire.



Ampere-Hour (Ah) - ANSWER The charge capacity of a battery, or the amount of
current available to be drawn at a consistent rate as the battery is discharged during a
one hour period.



Approved - ANSWER Acceptable to the Fire Commissioner, either as relating to
construction documents or materials, in accordance with the NYC Fire Code and other
relevant laws and rules.



Authority Having Jurisdiction AHJ - ANSWER An organization, office, or individual
responsible for enforcing the requirements of a code or standard, or for approving
equipment, materials, an installation, or a procedure.

, Automatic - ANSWER A device, equipment, or system that initiates system function as
a result of a predetermined temperature rise, rate of temperature rise, or combustion
products, without human intervention.



Battery Module - ANSWER A module comprising of a number of cells usually connected
in either series or parallel.



Battery Rack - ANSWER A device for the vertical storage of battery modules.



Battery String - ANSWER A number of cells/batteries connected in series to provide a
battery or battery string with the required usable voltage/potential, e.g., 6V, 12V, 24V,
48V, 110V.



Cell - ANSWER A single plate to plate and electrolyte connection that draws a nominal
voltage.



Central Station - ANSWER A location, or central location, to which alarm signals from a
protected premises are transmitted and from which alarm signals are re-transmitted or
otherwise communicated to the Fire Department.



Certificate of Approval ANSWER A written statement issued by the commissioner of the
FDNY, certifying that an article, device or equipment has been examined, tested and
approved for a specific purpose or use in conformity with the requirements of the
construction codes, the Fire Code or the Fire Department Rules.



Commissioning - ANSWER The process of ensuring that all systems and components
of a building or industrial plant are designed, installed, tested, operated, and maintained
to meet the operational requirements of the owner or end client.



Decommissioning - ANSWER Process of taking an asset or facility out of service or
operational state, sometimes with associated environmental clean-up and/or restoring
the site to original condition.

Document information

Uploaded on
January 24, 2025
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Easton
3.9
(120)
Sold
582
Followers
221
Items
28046
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions