Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 38 pages
Exam (elaborations)

CESSWI Part 2 – Questions With Detailed Answers

Document preview thumbnail
Preview 4 out of 38 pages

CESSWI Part 2 – Questions With Detailed AnswersCESSWI Part 2 – Questions With Detailed Answers

Content preview

CESSWI Part 2 – Questions With Detailed
Answers


Existing Veg, Desc/Purp - ANSWER>>temp or perm bmp desi to stab soil and
remove sups part from sheet flow runoff.

Existing Veg, Objectives - ANSWER>>1) Site Plan and Mang
2) Erosi Cont
3) Sedi Cont
4) Post-Cons Mang

Existing Veg, applic - ANSWER>>1) Areas within site where no const activity is
occur
2) Areas where local, state and fed govt require preservation
3) Areas where existing veg can be utilized for eros, sedi, and storm water quality.

Existing veg: inspection - ANSWER>>1) Accord to regu timetables
2) erosi and damage veg
3) sufficient moisture to ensure growth
4) veg is well stab
5) adequate cover
6) debris and litter
7) invasive exotics

Existing veg: maint - ANSWER>>1) only disturb area for construct
2)irrigate dry seasons
3) remove see, and replant if need be
4) replant or rework buffer strips
5) mow and cut perennial weeds
6) remove all trash and debri
7) treat invasive and noxious species

,Sched/Sequ, purp/descrip - ANSWER>>Temp, procedural control that involves
creating a written plan to address neck bmps and sequencing of construct
activities to mitigate the erosive effects of wind,water and construct activities.

Sched/Sequ: object - ANSWER>>1) site planning & management
2) erosion control
3) sediment control

Sched/Sequ: applications - ANSWER>>1) develop timetables for certain activities,
paretic during rainy season

Sched/Sequ: inspect - ANSWER>>1) inclusion of sched/seq as a bmp in the plan
2) ached site activities mirroring ached activites.

Sched/Sequ: maintanence - ANSWER>>1) modify ached of active when changes
are warranted
2) modify ached of active prior to rainy season to reflect updated bmp info

Hydroseed: Des& purp - ANSWER>>Temp or perm bmp designed to reduce
erosion and runoff by applying mix of seed, fert and stabilizing emulsion.

Hydroseed: object - ANSWER>>1) erosion control
2) good housekeeping/ materials management
3) post construct management

Hydroseed: targeted pollut - ANSWER>>1) sediment
2) nutrients
3) metals
4) ph

Hydroseed: imp consid - ANSWER>>1) need adequate moisture
2) additional mulch may be added

,3) pretreatment where cover is not met
4) apply from multi angles to avoid shadowing

Hydroseed: limitations - ANSWER>>1) seed mix approp for seasonal conditions
2) time of application per seasonal conditions
3) difficult on steep slopes
4) no pedestrian or vehicle traffic
5) avoid high winds

Hydroseed: inspect: - ANSWER>>1) adequate coverage of diet areas
2) signs of pedest or vehicle traffic
3) signs of animal activity
4) check seed mix for correct type and application rate

Hydroseed: Maint - ANSWER>>1) reapply in areas needing more cover
2) insure proper moisture
3) maintain unbroken coverage through out project
4) require repair due to traffic or animals

Hydroseed: potentailly assoc bmps - ANSWER>>1) hydromulch
2) seeding
3) mulching
4) temp stabi
5) tackifiers

RCP: descript and purp - ANSWER>>temp or perm erosion control blankets that
act as soils stabilization devices to protect diet areas from erosions.

RCP: object - ANSWER>>1) erosion control
2) runoff control
3) post construct

RCP: target pollutants - ANSWER>>1) sediment

, RCP: applications - ANSWER>>1) on slopes w/ potential for erosion
2) flow velocity reduction
3) temp channel stab
4) soil/rip-rap seperator
5) soil stabi
6) aid in germination
7) increase soil infiltration
8) stockpile protect

RCP: limitations - ANSWER>>1) ped and vehic hazard
2) not for use in rocky, established veg will be mowed and high fire
3) blankets dislocated easily
4) uv degradable
5) small animals can be trapped

RCP: imp consid - ANSWER>>1) material depends on site
2) soils should be prop prepared
3) instal per manufact recommedations.

RCP: inspect - ANSWER>>1) sufficient staples
2) provide anchoring and overlap
3) insure direct contact with soil surface
4) no rips or tears
5) verify rcp meets plan/swpp specifications.

RCP: Maint - ANSWER>>1) direct contact with recp and soil
2) repair/reinstall where needed
3) repair rills or gullies
4) replace staples where needed
5) material may get entangled in mowers

RCP: potential assoc bmps - ANSWER>>1) seeding

Document information

Uploaded on
January 22, 2025
Number of pages
38
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$18.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
5
Followers
0
Items
1316
Last sold
6 months ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions