Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

SOS NERC PREP – RELIABILITYNEW VERISON EXAM LATEST ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS 100%CORRECT

Document preview thumbnail
Preview 2 out of 9 pages

SOS NERC PREP – RELIABILITYNEW VERISON EXAM LATEST ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS 100%CORRECT

Content preview

SOS NERC PREP – RELIABILITYNEW VERISON
EXAM LATEST 2024- 2026 ACTUAL EXAM 200
QUESTIONS AND CORRECT DETAILED
ANSWERS 100%CORRECT

A transaction of 100 MWs is scheduled out of your area at the top of the hour with a 10-minute
ramp. You have the following generation available: What combination of generation would
need to be used?
Generator Capacity Current MWs Ramp Capability
1 100 MW 50 MW 5 MW/min
2 100 MW 40 MW 3 MW/min
3 100 MW 50 MW 1 MW/min
4 100 MW 60 MW 2 MW/min - ANSWER>>Generators 1, 2, 4

The Balancing Authority selling power to an end user entered the wrong schedule for the
upcoming hour. Which part of the ACE equation [ACE = (NIA - NIS) - 10B (FA - FS) - IME], will
cause Inadvertent Interchange to occur as the result of the incorrect schedule? -
ANSWER>>Both the Interchange portion and frequency portion of the Ace Equation will
contribute

What is the most common cause of frequency fluctuations? - ANSWER>>System generation and
load imbalance

A Balancing Authority's inadvertent accumulation reflects over-generation during on-peak
hours. When system load is decreasing, what actions could a Balancing Authority system
operator take to limit additional on peak inadvertent accumulation? - ANSWER>>Decrease
transactions into their system
Decrease generation

Balancing Authority A is currently reading a system frequency of 59.98 Hz. Its Net Actual
Interchange is +100 MW and its Net Scheduled Interchange is +100 MW. If Balancing Authority
A's frequency bias setting is 100 MW/0.1 HZ, what is ACE? - ANSWER>>-20

Governor droop is expressed as: - ANSWER>>A percentage of the frequency change required
for a governor to move a unit from no load to full load, or full load to no load

, If the frequency bias setting is less negative than the frequency response of a Balancing
Authority and a frequency decline is caused by a sudden loss of generation in an external
balancing area, what will be the result? - ANSWER>>The ACE will be positive value and AGC will
lower generation

Which of the following combinations would represent the best generation control performance
(in terms of helping the Interconnection's frequency) by a Balancing Area? - ANSWER>>ACE is
positive while frequency is below 60

If a Balancing Authority has an ACE of -175 MW and Frequency is 59.85 Hz. Which real-time
Control Performance Standard maybe outside of its low limit? - ANSWER>>BAAL

For the ACE equation to work properly, dynamic schedules, pseudo ties, frequency, and all
________________ must be metered. - ANSWER>>Tie lines

Balancing Authority A is scheduled to import 300 MW but is only importing 260 MW.
Interconnection frequency is 59.94 and Balancing Authority A's Frequency Bias Setting is -120
MW/0.1 Hz. What is Balancing Authority A's ACE reading? - ANSWER>>-32 MW

A Balancing Authority has a Net Interchange Schedule of -250 MWs from 1200 to 1600 on a
summer day. The Net Interchange Actual for those same hours respectively were -230 MW, -
275 MW, -250 MW and -270 MW. What was the Balancing Authority's Inadvertent Interchange
for the 4-hour period? - ANSWER>>25 MWs in

To conform to the CPS requirement, a Balancing Authority must have a _______. -
ANSWER>>CPS1 greater than or equal to 100%

Of the following, which control system would be affected by a difference in Net Actual
Interchange and Net Scheduled Interchange? - ANSWER>>Automatic Generation Control

Preparations are being made to tie two islands together during restoration. Island "A" has a
frequency of 58.95 Hz and Island "B" has a frequency of 59.97 Hz. What action should be taken
to synchronize the two islands? - ANSWER>>Shed load in Island "A"

If a Transmission Operator enters an unknown operating state (no valid operating limits have
been determined), then the Transmission Operator must restore operations to respect proven
reliable power system limits within which time limit? - ANSWER>>30 Minutes

Document information

Uploaded on
January 15, 2025
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$18.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
5
Followers
0
Items
1316
Last sold
6 months ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions